Tampa Bay
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.Coordinate Display Format: DMS | DM | DD | ||||
---|---|---|---|---|
Waypoint Name | Description | Depth | Latitude | Longitude |
1 Mile Reef - Site 01-01 |
1000 Tons Of Concrete Culverts Bridge Spans Date of Deployment: November 12 1992 Primary Material: CONCRETE CULVERTS Tonnage: 1000 County: MANATEE Depth: 27 ft Relief: 10 ft [1] Tides & Solunars |
27 ft | 27° 29' 30" N | 82° 43' 60" W |
1 Mile Reef - Site 01-02 |
Skyway Bridge Materials And Metal Pipes Date of Deployment: December 31 1976 Primary Material: BRIDGE MATERIAL Tonnage: 1000 County: MANATEE Depth: 21 ft [1] Tides & Solunars |
21 ft | 27° 29' 4" N | 82° 44' 7" W |
1 Mile Reef - Site 03-1 |
44 Reefballs 6 Of 7 Drops This Grant Date of Deployment: July 2 2003 Primary Material: MODULES CONCRETE REEFBALLS(44) County: MANATEE Depth: 22 ft Relief: 5 ft [1] Tides & Solunars |
22 ft | 27° 29' 26" N | 82° 44' 9" W |
1 Mile Reef - Site 03-2 |
44 Reefballs 7 Of 7 Drops This Grant Date of Deployment: July 2 2003 Primary Material: MODULES CONCRETE REEFBALLS(44) County: MANATEE Depth: 22 ft Relief: 5 ft [1] Tides & Solunars |
22 ft | 27° 29' 24" N | 82° 44' 7" W |
1 Mile Reef - Site 03-3 |
19 Reefballs 5 Of 7 Drops This Grant Date of Deployment: July 2 2003 Primary Material: MODULES CONCRETE REEFBALLS(19) County: MANATEE Depth: 22 ft Relief: 5 ft [1] Tides & Solunars |
22 ft | 27° 29' 25" N | 82° 44' 5" W |
1 Mile Reef - Site 05-01 |
1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 1 Of 7 Drops This Gran Date of Deployment: June 27 2005 Primary Material: MODULES CONCRETE REEFBALLS(48) Tonnage: 28.3 County: MANATEE Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 27° 29' 20" N | 82° 44' 10" W |
1 Mile Reef - Site 05-2 |
1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 2 Of 7 Drops This Gran Date of Deployment: June 27 2005 Primary Material: MODULES CONCRETE REEFBALLS(48) Tonnage: 28.3 County: MANATEE Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 27° 29' 19" N | 82° 44' 9" W |
1 Mile Reef - Site 05-3 |
1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 3 Of 7 Drops This Gran Date of Deployment: June 27 2005 Primary Material: MODULES CONCRETE REEFBALLS(48) Tonnage: 28.3 County: MANATEE Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 27° 29' 19" N | 82° 44' 5" W |
1 Mile Reef - Site 05-4 |
1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 4 Of 7 Drops This Gran Date of Deployment: June 27 2005 Primary Material: MODULES CONCRETE REEFBALLS(48) Tonnage: 28.3 County: MANATEE Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 27° 29' 19" N | 82° 44' 3" W |
1 Mile Reef - Site 05-5 |
1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 5 Of 7 Drops This Gran Date of Deployment: June 27 2005 Primary Material: MODULES CONCRETE REEFBALLS(48) Tonnage: 28.3 County: MANATEE Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 27° 29' 19" N | 82° 44' 1" W |
1 Mile Reef - Site 05-6 |
1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 6 Of 7 Drops This Gran Date of Deployment: June 27 2005 Primary Material: MODULES CONCRETE REEFBALLS(48) Tonnage: 28.3 County: MANATEE Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 27° 29' 20" N | 82° 43' 60" W |
1 Mile Reef - Site 05-7 |
1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 7 Of 7 Drops This Gran Date of Deployment: June 27 2005 Primary Material: MODULES CONCRETE REEFBALLS(48) Tonnage: 28.3 County: MANATEE Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 27° 29' 22" N | 82° 44' 5" W |
1 Mile Reef - Site 3-10 |
45 Reefballs 2 Of 7 Drops This Grant Date of Deployment: June 26 2003 Primary Material: MODULES CONCRETE REEFBALLS(45) County: MANATEE Depth: 22 ft Relief: 5 ft [1] Tides & Solunars |
22 ft | 27° 29' 23" N | 82° 44' 5" W |
1 Mile Reef - Site 3-12 |
44 Reefballs 3 Of 7 Drops This Grant Date of Deployment: June 26 2003 Primary Material: MODULES CONCRETE REEFBALLS(44) County: MANATEE Depth: 22 ft Relief: 5 ft [1] Tides & Solunars |
22 ft | 27° 29' 23" N | 82° 44' 2" W |
1 Mile Reef - Site 3-13 |
44 Reefballs 4 Of 7 Drops This Grant Date of Deployment: June 26 2003 Primary Material: MODULES CONCRETE REEFBALLS(44) County: MANATEE Depth: 22 ft Relief: 5 ft [1] Tides & Solunars |
22 ft | 27° 29' 26" N | 82° 43' 60" W |
1 Mile Reef - Site 3-8 |
45 Reefballs 1 Of 7 Drops This Grant Date of Deployment: June 26 2003 Primary Material: MODULES CONCRETE REEFBALLS(45) County: MANATEE Depth: 22 ft Relief: 5 ft [1] Tides & Solunars |
22 ft | 27° 29' 24" N | 82° 44' 7" W |
3 Mile Reef - North |
Tires Concrete Rubble And Tiles Date of Deployment: December 31 1976 Primary Material: TIRES County: MANATEE Depth: 30 ft [1] Tides & Solunars |
30 ft | 27° 29' 34" N | 82° 46' 60" W |
3 Mile Reef - North (B Reef) |
1100 Cubic Yards Of Boat Molds-Concrete Rubble-And Solid Rubber Tires. Date of Deployment: March 20 1987 Primary Material: FIBERGLASS BOAT MOLDS County: MANATEE Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 29' 58" N | 82° 47' 2" W |
7 Mile Reef North - North |
Tires Concrete Rubble Date of Deployment: December 31 1976 Primary Material: TIRES County: MANATEE Depth: 40 ft [1] Tides & Solunars |
40 ft | 27° 32' 13" N | 82° 52' 42" W |
Bahia Beach Reef (Bay) - Site 1 |
463 Tons Of Concrete Forms-Rubble And Stainless Steel Mixers. Date of Deployment: May 17 1989 Primary Material: MODULES CONCRETE PYRAMIDS Tonnage: 463 County: HILLSBOROUGH Depth: 20 ft [1] Tides & Solunars |
20 ft | 27° 44' 56" N | 82° 30' 59" W |
Bahia Beach Reef (Bay) - Site 10 |
Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier Date of Deployment: August 29 2001 Primary Material: BRIDGE SPANS Tonnage: 345.8 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 50" N | 82° 30' 53" W |
Bahia Beach Reef (Bay) - Site 11 |
Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier Date of Deployment: November 2 2001 Primary Material: BRIDGE SPANS Tonnage: 217.62 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 56" N | 82° 30' 58" W |
Bahia Beach Reef (Bay) - Site 12 |
Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier Date of Deployment: January 31 2002 Primary Material: BRIDGE SPANS Tonnage: 454.46 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 56" N | 82° 30' 55" W |
Bahia Beach Reef (Bay) - Site 13 |
Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier Date of Deployment: April 24 2002 Primary Material: BRIDGE SPANS Tonnage: 465.88 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 49" N | 82° 30' 57" W |
Bahia Beach Reef (Bay) - Site 14 |
Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier Date of Deployment: May 16 2002 Primary Material: BRIDGE SPANS Tonnage: 386.9 County: HILLSBOROUGH [1] Tides & Solunars |
27° 44' 51" N | 82° 30' 56" W | |
Bahia Beach Reef (Bay) - Site 15 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: February 2 2006 Primary Material: BRIDGE RUBBLE Tonnage: 180.04 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 56" N | 82° 30' 56" W |
Bahia Beach Reef (Bay) - Site 16 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: February 15 2006 Primary Material: BRIDGE RUBBLE Tonnage: 215.81 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 54" N | 82° 30' 58" W |
Bahia Beach Reef (Bay) - Site 17 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: February 24 2006 Primary Material: BRIDGE RUBBLE Tonnage: 54.26 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 58" N | 82° 30' 55" W |
Bahia Beach Reef (Bay) - Site 18 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: March 7 2006 Primary Material: BRIDGE RUBBLE Tonnage: 210.87 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 56" N | 82° 30' 54" W |
Bahia Beach Reef (Bay) - Site 19 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: April 4 2006 Primary Material: BRIDGE RUBBLE Tonnage: 64.13 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 57" N | 82° 30' 54" W |
Bahia Beach Reef (Bay) - Site 2 |
Concrete Bridge And Pile Caps Date of Deployment: December 8 1999 Primary Material: BRIDGE SLABS CONCRETE Tonnage: 90.5 County: HILLSBOROUGH Depth: 24 ft Relief: 6 ft [1] Tides & Solunars |
24 ft | 27° 44' 55" N | 82° 30' 53" W |
Bahia Beach Reef (Bay) - Site 20 |
Concrete Rubble-Concrete Slab-And Clay Water Pipes. Date of Deployment: June 29 1993 Primary Material: CONCRETE RUBBLE Tonnage: 703 County: HILLSBOROUGH Depth: 21 ft [1] Tides & Solunars |
21 ft | 27° 44' 53" N | 82° 30' 58" W |
Bahia Beach Reef (Bay) - Site 3 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Center Date of Deployment: March 10 2005 Primary Material: BRIDGE PILINGS Tonnage: 286.39 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 49" N | 82° 30' 55" W |
Bahia Beach Reef (Bay) - Site 4 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Center Date of Deployment: March 25 2005 Primary Material: BRIDGE PILINGS Tonnage: 351.89 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 49" N | 82° 30' 53" W |
Bahia Beach Reef (Bay) - Site 5 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Center Date of Deployment: April 7 2005 Primary Material: BRIDGE PILINGS Tonnage: 263.54 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 49" N | 82° 30' 53" W |
Bahia Beach Reef (Bay) - Site 6 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Center Date of Deployment: April 13 2005 Primary Material: BRIDGE PILINGS Tonnage: 254.4 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 48" N | 82° 30' 53" W |
Bahia Beach Reef (Bay) - Site 7 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Center Date of Deployment: June 22 2005 Primary Material: BRIDGE PILINGS Tonnage: 423.54 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 56" N | 82° 30' 57" W |
Bahia Beach Reef (Bay) - Site 8 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Center Date of Deployment: March 4 2005 Primary Material: BRIDGE PILINGS Tonnage: 559.07 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 51" N | 82° 30' 55" W |
Bahia Beach Reef (Bay) - Site 9 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Center Date of Deployment: February 24 2005 Primary Material: BRIDGE PILINGS Tonnage: 524.03 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 44' 53" N | 82° 30' 53" W |
Ballast Point Pier (Bay) |
Modules Of Concrete Pilings Slabs And Culverts Around Pier Date of Deployment: December 31 1987 Primary Material: CONCRETE PILINGS County: HILLSBOROUGH Depth: 8 ft Relief: 5 ft [1] Tides & Solunars |
8 ft | 27° 53' 16" N | 82° 28' 45" W |
Chamberlain High School (Bay) |
Annual Deployment On The Chamberlain High School Reef Date of Deployment: October 10 1996 Primary Material: CONCRETE BLOCKS (75) Tonnage: 0.3 County: HILLSBOROUGH Depth: 19 ft [1] Tides & Solunars |
19 ft | 27° 51' 39" N | 82° 33' 48" W |
Chief Reef (Bay) |
50 Concrete Blocks 500 Lbs. By Chamberlain H.S. Date of Deployment: September 11 1997 Primary Material: CONCRETE BLOCKS (50) County: HILLSBOROUGH Depth: 24 ft Relief: 12 ft [1] Tides & Solunars |
24 ft | 27° 51' 38" N | 82° 33' 47" W |
Clearwater C Site |
Area Covered 29’ X 45’ 13 Pieces Date of Deployment: April 13 1999 Primary Material: CONCRETE VAULTS Tonnage: 24 County: PINELLAS Depth: 31 ft [1] Tides & Solunars |
31 ft | 28° 0' 51" N | 82° 53' 32" W |
Clearwater C Site |
Area Covered 29’ X 45’ 9 Pieces Date of Deployment: April 12 1999 Primary Material: CONCRETE OVALS Tonnage: 28 County: PINELLAS Depth: 31 ft [1] Tides & Solunars |
31 ft | 28° 0' 51" N | 82° 53' 32" W |
Clearwater C Site |
46 Pieces Of Culverts And Boxes Date of Deployment: March 17 1999 Primary Material: CONCRETE CULVERTS Tonnage: 76 County: PINELLAS Depth: 31 ft Relief: 13 ft [1] Tides & Solunars |
31 ft | 28° 0' 51" N | 82° 53' 32" W |
Clearwater C Site |
30 Pieces Of Concrete 18 To 24 Inch Ovals Date of Deployment: July 26 1999 Primary Material: CONCRETE CULVERTS Tonnage: 27 County: PINELLAS Depth: 30 ft Relief: 8 ft [1] Tides & Solunars |
30 ft | 28° 0' 51" N | 82° 53' 35" W |
Clearwater C Site |
17 Pieces Of Concrete 18 To 36 Inches Date of Deployment: July 30 1999 Primary Material: CONCRETE CULVERTS Tonnage: 28 County: PINELLAS Depth: 30 ft Relief: 14 ft [1] Tides & Solunars |
30 ft | 28° 0' 51" N | 82° 53' 35" W |
Clearwater C Site |
29X45 Ovals Stuffed With 18&15 Culverts 17 Pieces Date of Deployment: May 20 1999 Primary Material: CONCRETE CULVERTS Tonnage: 40 County: PINELLAS Depth: 32 ft Relief: 11 ft [1] Tides & Solunars |
32 ft | 28° 0' 51" N | 82° 53' 35" W |
Clearwater C Site |
25 Pieces Of Concrete 12 To 52 Inch Sizes Date of Deployment: July 7 1999 Primary Material: CONCRETE CULVERTS Tonnage: 31 County: PINELLAS Depth: 30 ft Relief: 12 ft [1] Tides & Solunars |
30 ft | 28° 0' 51" N | 82° 53' 34" W |
Clearwater C Site |
29X45 Ovals Stuffed With 18&15 Culverts 30 Pieces Date of Deployment: May 14 1999 Primary Material: CONCRETE CULVERTS Tonnage: 34 County: PINELLAS Depth: 30 ft [1] Tides & Solunars |
30 ft | 28° 0' 51" N | 82° 53' 34" W |
Clearwater C Site |
14 Concrete Culverts From 15 To 54 Date of Deployment: May 18 1999 Primary Material: CONCRETE CULVERTS Tonnage: 32 County: PINELLAS Depth: 32 ft Relief: 13 ft [1] Tides & Solunars |
32 ft | 28° 0' 52" N | 82° 53' 34" W |
Clearwater C Site |
54 And 48 Culverts Date of Deployment: June 29 1999 Primary Material: CONCRETE CULVERTS Tonnage: 38 County: PINELLAS Depth: 33 ft Relief: 13 ft [1] Tides & Solunars |
33 ft | 28° 0' 52" N | 82° 53' 34" W |
Clearwater C Site |
Area Covered 29’ X 45’ 13 Pieces Date of Deployment: April 19 1999 Primary Material: CONCRETE OVALS (9) Tonnage: 28 County: PINELLAS Depth: 32 ft Relief: 15 ft [1] Tides & Solunars |
32 ft | 28° 0' 52" N | 82° 53' 34" W |
Clearwater C Site |
Area Covered 29’ X 45’ 11 Pieces Date of Deployment: April 14 1999 Primary Material: CONCRETE OVALS (11) Tonnage: 33 County: PINELLAS Depth: 32 ft Relief: 15 ft [1] Tides & Solunars |
32 ft | 28° 0' 52" N | 82° 53' 34" W |
Clearwater Reef |
33 X 12 X 3 Fiberglass Boat Mold 20 Sq. Feet Coverage Date of Deployment: June 1 1983 Primary Material: FIBERGLASS BOAT MOLD (1) County: PINELLAS Depth: 29 ft [1] Tides & Solunars |
29 ft | 27° 56' 24" N | 82° 47' 56" W |
Clearwater Reef |
Concrete Culverts 496 Sq. Feet Coverage Date of Deployment: August 25 1982 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 27 ft [1] Tides & Solunars |
27 ft | 28° 0' 37" N | 82° 53' 40" W |
Clearwater Reef |
37 X 18 X 8 Fiberglass Boat Mold 15 Sq. Feet Coverage Date of Deployment: June 1 1983 Primary Material: FIBERGLASS BOAT MOLD (1) County: PINELLAS Depth: 29 ft [1] Tides & Solunars |
29 ft | 28° 0' 49" N | 82° 53' 49" W |
Clearwater Reef |
27 Tons Of Concrete Cutoff Poles Date of Deployment: January 26 1998 Primary Material: CONCRETE PILINGS Tonnage: 27 County: PINELLAS Depth: 32 ft [1] Tides & Solunars |
32 ft | 28° 0' 51" N | 82° 53' 31" W |
Clearwater Reef |
Concrete Sinkers Near Sw Buoy 50 Sq. Feet Coverage Date of Deployment: December 7 1982 Primary Material: CONCRETE SINKERS County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 0' 52" N | 82° 53' 43" W |
Clearwater Reef |
Concrete Rubble 496 Sq. Feet Coverage Date of Deployment: August 19 1982 Primary Material: CONCRETE RUBBLE County: PINELLAS Depth: 29 ft [1] Tides & Solunars |
29 ft | 28° 0' 55" N | 82° 53' 21" W |
Clearwater Reef |
Concrete Culverts 1500 Sq. Feet Coverage Date of Deployment: September 16 1982 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 30 ft [1] Tides & Solunars |
30 ft | 28° 0' 57" N | 82° 53' 42" W |
Clearwater Reef |
Concrete Pyramids Airplane Concrete Rubble And Barge Date of Deployment: December 31 1974 Primary Material: CONCRETE RUBBLE County: PINELLAS Depth: 27 ft Relief: 13 ft [1] Tides & Solunars |
27 ft | 28° 0' 57" N | 82° 53' 42" W |
Clearwater Reef |
Cement Cut Offs And 10 Foot Diameter Steel Pipes 60 Sq. Feet Coverage Date of Deployment: December 16 1982 Primary Material: CONCRETE CUT OFFS County: PINELLAS Depth: 29 ft [1] Tides & Solunars |
29 ft | 28° 1' 34" N | 82° 52' 55" W |
Clearwater Reef Site C |
71 Pieces Culverts Various Sizes Date of Deployment: February 18 1999 Primary Material: CONCRETE CULVERTS Tonnage: 79 County: PINELLAS Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 28° 0' 51" N | 82° 53' 31" W |
Clearwater Reef Site M |
56 Pieces Culverts Various Sizes Date of Deployment: November 24 1998 Primary Material: CONCRETE CULVERTS Tonnage: 39 County: PINELLAS Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 28° 0' 50" N | 82° 53' 32" W |
Clearwater Reef Site M |
38 Pieces Culverts Various Sizes Date of Deployment: December 2 1998 Primary Material: CONCRETE CULVERTS Tonnage: 38 County: PINELLAS Depth: 31 ft Relief: 12 ft [1] Tides & Solunars |
31 ft | 28° 0' 50" N | 82° 53' 31" W |
Clearwater Reef Site M |
26 Pieces Culverts Various Sizes Date of Deployment: November 25 1998 Primary Material: CONCRETE CULVERTS Tonnage: 39 County: PINELLAS Depth: 30 ft Relief: 14 ft [1] Tides & Solunars |
30 ft | 28° 0' 51" N | 82° 53' 31" W |
Courtney Campbell Site (Bay) |
400 X 200 Yards. Of Concrete Pilings Date of Deployment: December 31 1991 Primary Material: CONCRETE PILINGS County: HILLSBOROUGH Depth: 16 ft Relief: 8 ft [1] Tides & Solunars |
16 ft | 27° 57' 45" N | 82° 36' 52" W |
Dunedin |
1Rst Of 5 Loads This Grant And This Site Date of Deployment: May 1 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 57' 54" N | 82° 54' 32" W |
Dunedin |
5Th Of 5 Loads This Grant This Site Date of Deployment: June 20 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 28° 3' 16" N | 82° 54' 30" W |
Dunedin |
2Nd Of 5 Loads This Grant And This Site 3 Piles About 20 Feet Apart Date of Deployment: May 7 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 28° 3' 20" N | 82° 54' 32" W |
Dunedin |
3Rd Of 5 Loads This Grant And This Site Date of Deployment: May 16 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 25 ft Relief: 10 ft [1] Tides & Solunars |
25 ft | 28° 3' 23" N | 82° 54' 27" W |
Dunedin |
4Th Of 5 Loads This Grant This Site Date of Deployment: May 28 1985 Primary Material: FIBERGLASS BOAT MOLDS County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 28° 3' 26" N | 82° 54' 36" W |
Dunedin |
28 Pieces Of Culverts Date of Deployment: December 24 1997 Primary Material: CONCRETE CULVERTS (29) Tonnage: 24 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 29" N | 82° 54' 57" W |
Dunedin |
12 Pieces Of Large Oval Culverts Date of Deployment: October 1 1997 Primary Material: CONCRETE CULVERTS (12) Tonnage: 25 County: PINELLAS Depth: 28 ft Relief: 13 ft [1] Tides & Solunars |
28 ft | 28° 3' 29" N | 82° 54' 57" W |
Dunedin |
23 Pieces Of Concrete Culverts Date of Deployment: December 23 1997 Primary Material: CONCRETE CULVERTS (23) Tonnage: 33 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 29" N | 82° 54' 57" W |
Dunedin |
18 Pieces Of Boxes And Assorted Concrete Date of Deployment: January 5 1998 Primary Material: CONCRETE BOXES (18) Tonnage: 22 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 29" N | 82° 54' 57" W |
Dunedin |
29 Pieces Of Concrete Culverts Date of Deployment: December 24 1997 Primary Material: CONCRETE CULVERTS (29) Tonnage: 24 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 29" N | 82° 54' 57" W |
Dunedin - J Site |
14 Culverts And Boxes Date of Deployment: October 30 1997 Primary Material: CONCRETE CULVERTS (14) Tonnage: 38 County: PINELLAS Depth: 28 ft Relief: 13 ft [1] Tides & Solunars |
28 ft | 28° 3' 27" N | 82° 54' 56" W |
Dunedin - J Site |
20 Culverts Date of Deployment: November 9 1997 Primary Material: CONCRETE CULVERTS (20) Tonnage: 29 County: PINELLAS Depth: 28 ft Relief: 10 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
29 Pieces Of Concrete Flower Boxes From Courthouse Date of Deployment: December 17 1997 Primary Material: CONCRETE BOXES (29) Tonnage: 30 County: PINELLAS Depth: 29 ft [1] Tides & Solunars |
29 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
30 Pieces Of Concrete Flower Boxes From Courthouse Date of Deployment: December 11 1997 Primary Material: CONCRETE BOXES (30) Tonnage: 23 County: PINELLAS Depth: 28 ft Relief: 7 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
37 Pieces Of Concrete Culverts Date of Deployment: December 10 1997 Primary Material: CONCRETE CULVERTS (37) Tonnage: 37 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
23 Pieces Of Concrete Culverts Date of Deployment: December 8 1997 Primary Material: CONCRETE CULVERTS (23) Tonnage: 26 County: PINELLAS Depth: 28 ft Relief: 14 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
20 Pieces Of Concrete Culverts Date of Deployment: November 26 1997 Primary Material: CONCRETE CULVERTS (20) Tonnage: 29 County: PINELLAS Depth: 29 ft Relief: 13 ft [1] Tides & Solunars |
29 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
15 Large Concrete Culverts Date of Deployment: November 20 1997 Primary Material: CONCRETE CULVERTS (15) Tonnage: 28 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
33 Culverts And 1 Box Date of Deployment: November 6 1997 Primary Material: CONCRETE CULVERTS (33) Tonnage: 32 County: PINELLAS Depth: 28 ft Relief: 13 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
38 Small Pieces Of Concrete Culverts Date of Deployment: November 4 1997 Primary Material: CONCRETE CULVERTS (38) Tonnage: 38 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
40 Small Pieces Of Concrete Culverts Date of Deployment: November 3 1997 Primary Material: CONCRETE CULVERTS (40) Tonnage: 33 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
11 Large Pieces Of Culverts 12 Foot Long Date of Deployment: October 29 1997 Primary Material: CONCRETE CULVERTS (11) Tonnage: 46 County: PINELLAS Depth: 28 ft Relief: 13 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
19 Large Oval Culverts Date of Deployment: November 21 1997 Primary Material: CONCRETE CULVERTS (19) Tonnage: 33 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 28" N | 82° 54' 56" W |
Dunedin - J Site |
11 Large Pieces Of Culverts Date of Deployment: October 27 1997 Primary Material: CONCRETE CULVERTS (11) Tonnage: 46 County: PINELLAS Depth: 28 ft Relief: 7 ft [1] Tides & Solunars |
28 ft | 28° 3' 29" N | 82° 54' 55" W |
Dunedin - J Site |
28 Pieces Of Culverts And Boxes Date of Deployment: December 21 1997 Primary Material: CONCRETE CULVERTS (12) Tonnage: 28 County: PINELLAS Depth: 30 ft Relief: 11 ft [1] Tides & Solunars |
30 ft | 28° 3' 31" N | 82° 54' 56" W |
Dunedin Reef |
22 Pieces Of Concrete Culverts And Rubble Date of Deployment: January 6 1998 Primary Material: CONCRETE CULVERTS Tonnage: 22 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 27° 52' 37" N | 83° 11' 12" W |
Dunedin Reef |
Concrete Culvert And Pyramids Date of Deployment: December 31 1975 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 28° 3' 12" N | 82° 54' 33" W |
Dunedin Reef |
Concrete Culverts 744 Sq. Feet Coverage Date of Deployment: August 23 1982 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 30 ft [1] Tides & Solunars |
30 ft | 28° 3' 15" N | 82° 54' 39" W |
Dunedin Reef |
20 Tons Of 36 Culverts Date of Deployment: January 7 1998 Primary Material: CONCRETE CULVERTS Tonnage: 20 County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 3' 20" N | 82° 54' 34" W |
Dunedin Reef |
Concrete Culverts 496 Sq. Feet Coverage Date of Deployment: August 25 1982 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 30 ft [1] Tides & Solunars |
30 ft | 28° 3' 20" N | 82° 54' 38" W |
Dunedin Reef |
Concrete Culverts 750 Sq. Feet Coverage Date of Deployment: August 24 1982 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 30 ft [1] Tides & Solunars |
30 ft | 28° 3' 20" N | 82° 54' 38" W |
Dunedin Reef |
20.0 Yards. Of Rubble (2 Of 11 Loads) Date of Deployment: November 19 1990 Primary Material: CONCRETE RUBBLE County: PINELLAS [1] Tides & Solunars |
28° 3' 25" N | 82° 54' 40" W | |
Dunedin Reef |
20.0 Yards. Of Rubble (1 Of 11 Loads) Date of Deployment: November 13 1990 Primary Material: CONCRETE RUBBLE County: PINELLAS [1] Tides & Solunars |
28° 3' 25" N | 82° 54' 39" W | |
Dunedin Reef |
25.0 Yards. Of Rubble (5 Of 11 Loads) Date of Deployment: November 26 1990 Primary Material: CONCRETE RUBBLE County: PINELLAS [1] Tides & Solunars |
28° 3' 25" N | 82° 54' 39" W | |
Dunedin Reef |
10.6 Yards. Of Rubble (3 Of 11 Loads) Date of Deployment: November 20 1990 Primary Material: CONCRETE RUBBLE County: PINELLAS [1] Tides & Solunars |
28° 3' 25" N | 82° 54' 39" W | |
Dunedin Reef |
Concrete Rubble Date of Deployment: December 31 1990 Primary Material: CONCRETE RUBBLE County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 28° 3' 25" N | 82° 54' 39" W |
Dunedin Reef Site 'J' |
12 Pieces Culverts Various Sizes Date of Deployment: January 27 1999 Primary Material: CONCRETE CULVERTS Tonnage: 32 County: PINELLAS Depth: 29 ft Relief: 10 ft [1] Tides & Solunars |
29 ft | 28° 3' 20" N | 82° 54' 34" W |
Egmont Key Reef |
350 Pieces Of Pipe And 22 Concrete Pyramids (6’H X 8’B) Date of Deployment: June 26 1999 Primary Material: MODULES CONCRETE PYRAMIDS (22) Tonnage: 513 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 34' 60" N | 82° 44' 36" W |
Egmont Key Reef (Bay) #1 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: August 6 2001 Primary Material: BRIDGE SPANS Tonnage: 224 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 4" N | 82° 44' 39" W |
Egmont Key Reef (Bay) #10 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: September 25 2001 Primary Material: BRIDGE SPANS Tonnage: 178.81 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 34' 55" N | 82° 44' 40" W |
Egmont Key Reef (Bay) #11 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: September 26 2001 Primary Material: BRIDGE SPANS Tonnage: 309.84 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 34' 57" N | 82° 44' 40" W |
Egmont Key Reef (Bay) #12 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: October 1 2001 Primary Material: BRIDGE SPANS Tonnage: 190.12 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 34' 56" N | 82° 44' 40" W |
Egmont Key Reef (Bay) #2 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: August 9 2001 Primary Material: BRIDGE SPANS Tonnage: 185 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 4" N | 82° 44' 32" W |
Egmont Key Reef (Bay) #3 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: August 15 2001 Primary Material: BRIDGE SPANS Tonnage: 184.98 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 2" N | 82° 44' 34" W |
Egmont Key Reef (Bay) #4 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: August 20 2001 Primary Material: BRIDGE SPANS Tonnage: 208.41 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 3" N | 82° 44' 32" W |
Egmont Key Reef (Bay) #5 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: August 24 2001 Primary Material: BRIDGE SPANS Tonnage: 265.13 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 2" N | 82° 44' 37" W |
Egmont Key Reef (Bay) #6 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: August 30 2001 Primary Material: BRIDGE SPANS Tonnage: 180.04 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 1" N | 82° 44' 38" W |
Egmont Key Reef (Bay) #7 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: September 6 2001 Primary Material: BRIDGE SPANS Tonnage: 220.74 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 2" N | 82° 44' 38" W |
Egmont Key Reef (Bay) #9 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: September 19 2001 Primary Material: BRIDGE SPANS Tonnage: 258.97 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 4" N | 82° 44' 39" W |
Egmont Key Reef (Bay)#13 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: October 4 2001 Primary Material: BRIDGE SPANS Tonnage: 309.84 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 34' 57" N | 82° 44' 41" W |
Egmont Key Reef (Bay)#14 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: October 8 2001 Primary Material: BRIDGE SPANS Tonnage: 309.8 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 35' 2" N | 82° 44' 36" W |
Egmont Key Reef (Bay)#15 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: October 12 2001 Primary Material: BRIDGE SPANS Tonnage: 361.48 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 35' 5" N | 82° 44' 35" W |
Egmont Key Reef (Bay)#16 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: October 16 2001 Primary Material: BRIDGE SPANS Tonnage: 277.47 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 35' 4" N | 82° 44' 33" W |
Egmont Key Reef (Bay)#22 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: November 27 2001 Primary Material: BRIDGE SPANS Tonnage: 577.53 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 35' 4" N | 82° 44' 41" W |
Egmont Key Reef (Bay)#23 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: December 4 2001 Primary Material: BRIDGE SPANS Tonnage: 172.65 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 35' 5" N | 82° 44' 32" W |
Egmont Key Reef (Bay)#24 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: December 7 2001 Primary Material: BRIDGE SPANS Tonnage: 277.47 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 35' 5" N | 82° 44' 35" W |
Egmont Key Reef (Bay)#25 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: December 21 2001 Primary Material: BRIDGE SPANS Tonnage: 331.73 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 35' 1" N | 82° 44' 31" W |
Egmont Key Reef (Bay)#26 |
Gulf Pier -Ft. Desoto Pile Cutoffs Date of Deployment: May 17 2002 Primary Material: CONCRETE PILE CUTOFFS Tonnage: 44.4 County: HILLSBOROUGH Depth: 18 ft Relief: 8 ft [1] Tides & Solunars |
18 ft | 27° 34' 59" N | 82° 44' 38" W |
Egmont Key Reef (Bay)#8 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: September 12 2001 Primary Material: BRIDGE SPANS Tonnage: 246.64 County: HILLSBOROUGH Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 35' 3" N | 82° 44' 41" W |
Howard Franklin Site (Bay) |
400 X 200 Yards. Of Bridge Rubble And Pilings Date of Deployment: December 31 1991 Primary Material: BRIDGE RUBBLE County: HILLSBOROUGH Depth: 16 ft Relief: 8 ft [1] Tides & Solunars |
16 ft | 27° 54' 38" N | 82° 33' 14" W |
Indian Shores Reef - Site 1 |
2 Boat Molds Secured Together And Laying On Starboard Side Date of Deployment: July 9 1985 Primary Material: FIBERGLASS BOAT MOLDS (2) County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 51' 29" N | 83° 1' 45" W |
Indian Shores Reef - Site 10 |
24 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1 Date of Deployment: March 19 2003 Primary Material: CONCRETE CULVERTS (24) Tonnage: 32.5 County: PINELLAS Depth: 40 ft Relief: 10 ft [1] Tides & Solunars |
40 ft | 27° 51' 42" N | 83° 1' 52" W |
Indian Shores Reef - Site 11 |
14 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1 Date of Deployment: March 13 2003 Primary Material: CONCRETE CULVERTS (14) Tonnage: 25 County: PINELLAS Depth: 40 ft Relief: 7 ft [1] Tides & Solunars |
40 ft | 27° 51' 42" N | 83° 1' 51" W |
Indian Shores Reef - Site 12 |
22 Pieces Culverts 15 X 8 Ft. Long Date of Deployment: March 10 2003 Primary Material: CONCRETE CULVERTS (22) Tonnage: 13 County: PINELLAS Depth: 40 ft Relief: 8 ft [1] Tides & Solunars |
40 ft | 27° 51' 41" N | 83° 1' 52" W |
Indian Shores Reef - Site 13 |
21 Pieces Culverts Various Sizes Date of Deployment: July 29 2002 Primary Material: CONCRETE CULVERTS (21) Tonnage: 37.5 County: PINELLAS Depth: 40 ft Relief: 17 ft [1] Tides & Solunars |
40 ft | 27° 51' 42" N | 83° 1' 52" W |
Indian Shores Reef - Site 14 |
17 Pieces Culverts Various Sizes Date of Deployment: July 24 2002 Primary Material: CONCRETE CULVERTS (17) Tonnage: 27.8 County: PINELLAS Depth: 41 ft Relief: 12 ft [1] Tides & Solunars |
41 ft | 27° 51' 42" N | 83° 1' 51" W |
Indian Shores Reef - Site 15 |
28 Pieces Culverts Various Sizes Date of Deployment: May 29 2003 Primary Material: CONCRETE CULVERTS (28) Tonnage: 33 County: PINELLAS Depth: 40 ft Relief: 13 ft [1] Tides & Solunars |
40 ft | 27° 51' 41" N | 83° 1' 52" W |
Indian Shores Reef - Site 16 |
Concrete Culverts Various Sizes-21 Total - 6 Of 10 Drops This Grant Date of Deployment: February 17 2005 Primary Material: CONCRETE CULVERTS (21) Tonnage: 22 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 55" W |
Indian Shores Reef - Site 17 |
Concrete Culverts Various Sizes-10 Total - 5 Of 10 Drops This Grant Date of Deployment: February 16 2005 Primary Material: CONCRETE CULVERTS (10) Tonnage: 24 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 18 |
Concrete Culverts Various Sizes-29 Total - 4 Of 10 Drops This Grant Date of Deployment: February 15 2005 Primary Material: CONCRETE CULVERTS (29) Tonnage: 29.5 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 55" W |
Indian Shores Reef - Site 19 |
Concrete Culverts 12 To 24’X 8’’ -24 Total - 2 Of 10 Drops This Gran Date of Deployment: January 27 2005 Primary Material: CONCRETE CULVERTS (24) Tonnage: 24.8 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 2 |
64 Pieces Culverts Various Sizes Two Dates Also 7/22/03 Date of Deployment: July 21 2003 Primary Material: CONCRETE CULVERTS (64) Tonnage: 42 County: PINELLAS Depth: 40 ft Relief: 15 ft [1] Tides & Solunars |
40 ft | 27° 51' 41" N | 83° 1' 52" W |
Indian Shores Reef - Site 20 |
Concrete Pier Slabs 10’X2’ -22 Total -1 Of 10 Drops This Grant Date of Deployment: January 21 2005 Primary Material: CONCRETE RUBBLE Tonnage: 29.4 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 55" W |
Indian Shores Reef - Site 21 |
Concrete Culverts Various Sizes-25 Total - 3 Of 10 Drops This Grant Date of Deployment: February 3 2005 Primary Material: CONCRETE CULVERTS (25) Tonnage: 33.9 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 49" N | 83° 1' 55" W |
Indian Shores Reef - Site 22 |
16 Pieces Culverts Various Sizes Date of Deployment: July 8 2002 Primary Material: CONCRETE CULVERTS (16) Tonnage: 36.4 County: PINELLAS Depth: 40 ft Relief: 10 ft [1] Tides & Solunars |
40 ft | 27° 51' 42" N | 83° 1' 52" W |
Indian Shores Reef - Site 23 |
2 Loads Form 1/5/83 To 6/23/83 Three Other Sites Same Grant Date of Deployment: June 28 1983 Primary Material: TIRES UNITS County: PINELLAS [1] Tides & Solunars |
27° 51' 24" N | 83° 1' 48" W | |
Indian Shores Reef - Site 24 |
Concrete Slabs Various Sizes Date of Deployment: May 2 2006 Primary Material: CONCRETE SLABS(23) Tonnage: 24.39 County: PINELLAS Depth: 39 ft Relief: 5 ft [1] Tides & Solunars |
39 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 25 |
Concrete Culverts Various Sizes Date of Deployment: May 15 2006 Primary Material: CONCRETE CULVERTS (24) Tonnage: 25 County: PINELLAS Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 26 |
Concrete Slabs 10’X4’x10’ Date of Deployment: May 10 2006 Primary Material: CONCRETE SLABS (19) Tonnage: 30.78 County: PINELLAS Depth: 41 ft Relief: 6 ft [1] Tides & Solunars |
41 ft | 27° 51' 48" N | 83° 1' 55" W |
Indian Shores Reef - Site 27 |
Concrete Culverts Date of Deployment: May 9 2006 Primary Material: CONCRETE CULVERTS (29) Tonnage: 26.7 County: PINELLAS Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 28 |
Concrete Culverts Various Sizes-30 Total - 9 Of 10 Drops This Grant Date of Deployment: March 11 2005 Primary Material: CONCRETE CULVERTS (30) Tonnage: 34.5 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 29 |
Concrete Culverts Various Sizes-24 Total - 8 Of 10 Drops This Grant Date of Deployment: March 7 2005 Primary Material: CONCRETE CULVERTS (24) Tonnage: 28.6 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 3 |
33 Pieces Culverts Various Sizes Date of Deployment: May 27 2003 Primary Material: CONCRETE CULVERTS (33) Tonnage: 36.9 County: PINELLAS Depth: 40 ft Relief: 15 ft [1] Tides & Solunars |
40 ft | 27° 51' 41" N | 83° 1' 52" W |
Indian Shores Reef - Site 30 |
Concrete Culverts Various Sizes-26 Total - 7 Of 10 Drops This Grant Date of Deployment: February 24 2005 Primary Material: CONCRETE CULVERTS (26) Tonnage: 36.2 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 31 |
Concrete Culverts Various Sizes-24 Total - 10 Of 10 Drops This Grant Date of Deployment: March 14 2005 Primary Material: CONCRETE CULVERTS (24) Tonnage: 34.9 County: PINELLAS Depth: 35 ft Relief: 5 ft [1] Tides & Solunars |
35 ft | 27° 51' 48" N | 83° 1' 54" W |
Indian Shores Reef - Site 32 |
Concrete Culverts Various Sizes-30 Total -County Match To Grant Load 1 Date of Deployment: September 14 2005 Primary Material: CONCRETE CULVERTS (30) Tonnage: 30.5 County: PINELLAS Depth: 35 ft Relief: 4 ft [1] Tides & Solunars |
35 ft | 27° 51' 46" N | 83° 1' 55" W |
Indian Shores Reef - Site 33 |
Concrete Culverts Various Sizes-36 Total - County Match To Grant Load Date of Deployment: August 22 2005 Primary Material: CONCRETE CULVERTS (36) Tonnage: 35.5 County: PINELLAS Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 27° 53' 36" N | 83° 1' 54" W |
Indian Shores Reef - Site 34 |
Concrete Culverts Various Sizes-30 Total -County Match To Grant Load 1 Date of Deployment: October 18 2005 Primary Material: CONCRETE CULVERTS (18) Tonnage: 24.39 County: PINELLAS Depth: 40 ft Relief: 5 ft [1] Tides & Solunars |
40 ft | 27° 51' 47" N | 83° 1' 55" W |
Indian Shores Reef - Site 35 |
Concrete Culverts Various Sizes-30 Total -County Match To Grant Load 1 Date of Deployment: September 26 2005 Primary Material: CONCRETE CULVERTS (11) Tonnage: 32.74 County: PINELLAS Depth: 40 ft Relief: 8 ft [1] Tides & Solunars |
40 ft | 27° 51' 48" N | 83° 1' 55" W |
Indian Shores Reef - Site 36 |
Concrete Slabs Various Sizes Date of Deployment: May 3 2006 Primary Material: CONCRETE BRIDGE RUBBLE (98) Tonnage: 628 County: PINELLAS Depth: 44 ft Relief: 14 ft [1] Tides & Solunars |
44 ft | 27° 51' 46" N | 83° 1' 44" W |
Indian Shores Reef - Site 4 |
27 Pieces Culverts Various Sizes Date of Deployment: July 18 2002 Primary Material: CONCRETE CULVERTS (27) Tonnage: 26.2 County: PINELLAS Depth: 38 ft Relief: 15 ft [1] Tides & Solunars |
38 ft | 27° 51' 53" N | 83° 1' 52" W |
Indian Shores Reef - Site 5 |
20 Pieces Culverts Various Sizes Date of Deployment: July 17 2002 Primary Material: CONCRETE CULVERTS (20) Tonnage: 26.3 County: PINELLAS Depth: 40 ft Relief: 10 ft [1] Tides & Solunars |
40 ft | 27° 51' 53" N | 83° 1' 52" W |
Indian Shores Reef - Site 6 |
22 Pieces Culverts Various Sizes Date of Deployment: June 11 2003 Primary Material: CONCRETE CULVERTS (22) Tonnage: 22.4 County: PINELLAS Depth: 40 ft Relief: 15 ft [1] Tides & Solunars |
40 ft | 27° 51' 41" N | 83° 1' 52" W |
Indian Shores Reef - Site 7 |
15 Pieces Culverts Various Sizes Date of Deployment: April 24 2003 Primary Material: CONCRETE CULVERTS (15) Tonnage: 32.3 County: PINELLAS Depth: 39 ft Relief: 10 ft [1] Tides & Solunars |
39 ft | 27° 51' 42" N | 83° 1' 53" W |
Indian Shores Reef - Site 8 |
17 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1 Date of Deployment: April 16 2003 Primary Material: CONCRETE CULVERTS (17) Tonnage: 32.5 County: PINELLAS Depth: 41 ft Relief: 10 ft [1] Tides & Solunars |
41 ft | 27° 51' 42" N | 83° 1' 52" W |
Indian Shores Reef - Site 9 |
17 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1 Date of Deployment: April 14 2003 Primary Material: CONCRETE CULVERTS (17) Tonnage: 21 County: PINELLAS Depth: 38 ft Relief: 8 ft [1] Tides & Solunars |
38 ft | 27° 51' 41" N | 83° 1' 52" W |
Little Bird Key Oyster Reef - Site 1 |
350 Bags Of Fossilized Locally Mined Shell Near Shore About 125 Feet L Date of Deployment: January 28 2005 Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS County: PINELLAS Depth: 1 ft Relief: 2 ft [1] Tides & Solunars |
1 ft | 27° 41' 8" N | 82° 43' 1" W |
Little Bird Key Oyster Reef - Site 2 |
125 Bags Of Fossilized Locally Mined Shell Near Shore About 50 Feet Lo Date of Deployment: January 28 2005 Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS County: PINELLAS Depth: 1 ft Relief: 2 ft [1] Tides & Solunars |
1 ft | 27° 41' 7" N | 82° 43' 3" W |
Little Bird Key Oyster Reef - Site 3 |
125 Bags Of Fossilized Locally Mined Shell Near Shore About 50 Feet Lo Date of Deployment: January 28 2005 Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS County: PINELLAS Depth: 1 ft Relief: 2 ft [1] Tides & Solunars |
1 ft | 27° 41' 6" N | 82° 43' 4" W |
Madeira Reef - Site 1 |
29 Loads From 11/09/82 To 04/21/83 686 Yards. Total Date of Deployment: March 15 1983 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 46' 18" N | 82° 54' 54" W | |
Madeira Reef - Site 2 |
2Nd Of 4 Loads This Site Date of Deployment: June 26 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 46' 26" N | 82° 54' 54" W | |
Madeira Reef - Site 3 |
Two Groups About 40 Feet Apart 4Th Of 4 Loads Date of Deployment: July 25 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 46' 21" N | 82° 54' 54" W | |
Madeira Reef - Site 4 |
3Rd Of 4 Loads This Site Date of Deployment: June 27 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 46' 14" N | 82° 54' 56" W | |
Madeira Reef - Site 5 |
1Rst Of 4 Loads This Site Date of Deployment: June 23 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 46' 19" N | 82° 54' 51" W | |
Manatee River-Emerson Point04-18 |
Bay Mini.Lo-Pro And Table Top Balls Date of Deployment: February 6 2004 Primary Material: MODULES CONCRETE REEFBALLS(81) Tonnage: 20.03 County: MANATEE Depth: 10 ft Relief: 3 ft [1] Tides & Solunars |
10 ft | 27° 31' 50" N | 82° 38' 46" W |
Misener Barge |
100 X 35 X 8 Foot Barge Accidentally Sunk By Misener Marine Date of Deployment: December 19 1985 Primary Material: BARGE STEEL 100 County: MANATEE Depth: 25 ft Relief: 8 ft [1] Tides & Solunars |
25 ft | 27° 32' 41" N | 82° 50' 42" W |
North County Reef (Center) |
9 Pieces Of Concrete Culverts 42 And 48 Inch Sizes (Ovals) Date of Deployment: January 27 2000 Primary Material: CONCRETE CULVERTS (9) Tonnage: 34 County: PINELLAS Depth: 47 ft [1] Tides & Solunars |
47 ft | 28° 0' 1" N | 83° 0' 46" W |
North County Reef (Center) |
Steel Barge 150X45x10h Upright South Of The Other Two Date of Deployment: August 31 1999 Primary Material: BARGE STEEL 150’ Tonnage: 130 County: PINELLAS Depth: 42 ft Relief: 10 ft [1] Tides & Solunars |
42 ft | 28° 2' 59" N | 83° 0' 44" W |
North County Reef (Center) |
Steel Barge 120X30x7h Facing East -West Upright Date of Deployment: August 2 1999 Primary Material: BARGE STEEL 120’ Tonnage: 120 County: PINELLAS Depth: 45 ft Relief: 7 ft [1] Tides & Solunars |
45 ft | 28° 2' 59" N | 83° 0' 45" W |
North County Reef (Ne-Corner) |
Concrete Junction Box 6X4x4’-Sinker For Corner Buoys Date of Deployment: July 6 1999 Primary Material: CONCRETE JUNCTION BOX ANCHOR Tonnage: 3 County: PINELLAS Depth: 44 ft Relief: 4 ft [1] Tides & Solunars |
44 ft | 28° 3' 30" N | 83° 0' 38" W |
North County Reef (Ne)-A |
Tetrahedrons 40’X32’x18’h 270 Ft. Ne Of Barges Date of Deployment: September 1 1999 Primary Material: MODULES CONCRETE TETRAHEDRONS County: PINELLAS Depth: 45 ft Relief: 18 ft [1] Tides & Solunars |
45 ft | 28° 3' 1" N | 83° 0' 43" W |
North County Reef (Ne)-A |
18 Pieces Of Concrete Culverts 18 24 And 30 Inch Sizes (Ovals) Date of Deployment: December 3 1999 Primary Material: CONCRETE CULVERTS (19) Tonnage: 30 County: PINELLAS Depth: 49 ft Relief: 11 ft [1] Tides & Solunars |
49 ft | 28° 3' 28" N | 83° 0' 29" W |
North County Reef (Ne)-A |
13 Pieces Of Concrete Culverts 36 Inch Sizes Date of Deployment: January 7 2000 Primary Material: CONCRETE CULVERTS (13) Tonnage: 29.5 County: PINELLAS Depth: 47 ft Relief: 12 ft [1] Tides & Solunars |
47 ft | 28° 3' 29" N | 83° 0' 37" W |
North County Reef (Ne)-A |
27 Pieces Of Concrete Culverts 18 24 And 30 Inch Sizes (Ovals) Date of Deployment: November 29 1999 Primary Material: CONCRETE CULVERTS (27) Tonnage: 26 County: PINELLAS Depth: 46 ft Relief: 5 ft [1] Tides & Solunars |
46 ft | 28° 3' 29" N | 83° 0' 36" W |
North County Reef (Ne)-A |
18 Pieces Of Concrete Culverts 12 18 24 And 30 Inch Sizes Date of Deployment: November 30 1999 Primary Material: CONCRETE CULVERTS (18) Tonnage: 26 County: PINELLAS Depth: 47 ft Relief: 8 ft [1] Tides & Solunars |
47 ft | 28° 3' 29" N | 83° 0' 37" W |
North County Reef (Ne)-A |
20 Pieces Of Concrete Culverts 30 Inch Sizes Date of Deployment: December 10 1999 Primary Material: CONCRETE CULVERTS (20) Tonnage: 35 County: PINELLAS Depth: 48 ft Relief: 16 ft [1] Tides & Solunars |
48 ft | 28° 3' 29" N | 83° 0' 37" W |
North County Reef (Ne)-A |
7 Pieces Of Concrete Culverts 54 To 48 Inch Sizes Date of Deployment: September 9 1999 Primary Material: CONCRETE CULVERTS (7) Tonnage: 30 County: PINELLAS Depth: 44 ft Relief: 5 ft [1] Tides & Solunars |
44 ft | 28° 3' 30" N | 83° 0' 37" W |
North County Reef (Ne)-A |
29 Pieces Of Concrete Culverts 18 Inch Sizes Date of Deployment: December 22 1999 Primary Material: CONCRETE CULVERTS (29) Tonnage: 23 County: PINELLAS Depth: 47 ft Relief: 10 ft [1] Tides & Solunars |
47 ft | 28° 3' 30" N | 83° 0' 36" W |
North County Reef (Ne)-A |
19 Pieces Of Concrete Culverts 18 24 And 30 Inch Sizes Date of Deployment: November 24 1999 Primary Material: CONCRETE CULVERTS (19) Tonnage: 26 County: PINELLAS Depth: 48 ft Relief: 5 ft [1] Tides & Solunars |
48 ft | 28° 3' 30" N | 83° 0' 37" W |
North County Reef (Ne)-A |
17 Pieces Of Concrete Culverts 30 Inch Sizes Date of Deployment: December 13 1999 Primary Material: CONCRETE CULVERTS (17) Tonnage: 27 County: PINELLAS Depth: 47 ft Relief: 17 ft [1] Tides & Solunars |
47 ft | 28° 3' 30" N | 83° 0' 38" W |
North County Reef (Ne)-A |
23 Concrete Slabs 27-47 X118 Inch-On Top Of Culverts Date of Deployment: December 20 1999 Primary Material: CONCRETE SLABS (23) Tonnage: 28 County: PINELLAS Depth: 47 ft Relief: 17 ft [1] Tides & Solunars |
47 ft | 28° 3' 30" N | 83° 0' 36" W |
North County Reef (Ne)-A |
18 Pieces Of Concrete Culverts 19 X 30 And 14 X 23 Inch Sizes (Ovals) Date of Deployment: December 6 1999 Primary Material: CONCRETE CULVERTS (21) Tonnage: 24 County: PINELLAS Depth: 48 ft Relief: 12 ft [1] Tides & Solunars |
48 ft | 28° 3' 30" N | 83° 0' 35" W |
North County Reef (Ne)-A |
24 Concrete Slabs 27-47 X118 Inch-On Top Of Culverts Date of Deployment: December 21 1999 Primary Material: CONCRETE SLABS (24) Tonnage: 27 County: PINELLAS Depth: 48 ft Relief: 17 ft [1] Tides & Solunars |
48 ft | 28° 3' 30" N | 83° 0' 36" W |
North County Reef (Ne)-A |
29 Concrete Slabs And 2 Boxes Date of Deployment: January 10 2000 Primary Material: CONCRETE SLABS (27) Tonnage: 31.5 County: PINELLAS Depth: 48 ft Relief: 15 ft [1] Tides & Solunars |
48 ft | 28° 3' 35" N | 83° 0' 36" W |
North County Reef (Nw-Corner) |
Concrete Junction Box 6X4x4’-Sinker For Corner Buoys Date of Deployment: July 6 1999 Primary Material: CONCRETE JUNCTION BOX ANCHOR Tonnage: 3 County: PINELLAS Depth: 44 ft Relief: 4 ft [1] Tides & Solunars |
44 ft | 28° 3' 30" N | 83° 0' 52" W |
North County Reef (Nw) |
Two N-W Rows Of Polygonals 50 6-Ft. And 50 4.5- Ft Tall Nw Of Barges Date of Deployment: August 17 1999 Primary Material: CONCRETE POLYGONALS (100) Tonnage: 50 County: PINELLAS Depth: 42 ft Relief: 6 ft [1] Tides & Solunars |
42 ft | 28° 3' 1" N | 83° 0' 46" W |
North County Reef (Se-Corner) |
Concrete Junction Box 6X4x4’-Sinker For Corner Buoys Date of Deployment: July 6 1999 Primary Material: CONCRETE JUNCTION BOX ANCHOR Tonnage: 3 County: PINELLAS Depth: 44 ft Relief: 4 ft [1] Tides & Solunars |
44 ft | 28° 2' 30" N | 83° 0' 37" W |
North County Reef (South) |
Limestone Boulders About 190 Ft. South Of Barges Date of Deployment: September 3 1999 Primary Material: ROCK LIMESTONE County: PINELLAS Depth: 45 ft [1] Tides & Solunars |
45 ft | 28° 2' 56" N | 83° 0' 45" W |
North County Reef (Sw-Corner) |
Concrete Junction Box 6X4x4’-Sinker For Corner Buoys Date of Deployment: July 6 1999 Primary Material: CONCRETE JUNCTION BOX ANCHOR Tonnage: 3 County: PINELLAS Depth: 44 ft Relief: 4 ft [1] Tides & Solunars |
44 ft | 28° 2' 29" N | 83° 0' 52" W |
Picnic Island Pier Reef (Bay) |
Concrete Pyramid Modules Placed 75’ From The End Of The Picnic Pier. Date of Deployment: July 15 1991 Primary Material: MODULES CONCRETE PYRAMIDS Tonnage: 54 County: HILLSBOROUGH [1] Tides & Solunars |
27° 51' 23" N | 82° 33' 12" W | |
Picnic Island Reef (Bay) |
830 Cubic Yards Of Concrete And Misc. Fittings. Date of Deployment: May 28 1987 Primary Material: CONCRETE CULVERTS County: HILLSBOROUGH Depth: 26 ft [1] Tides & Solunars |
26 ft | 27° 49' 58" N | 82° 33' 36" W |
Pier-60 |
Concrete Material Placed Around Pilings Off Pier 60 In Clearwater. Date of Deployment: October 28 1986 Primary Material: CONCRETE CULVERTS Tonnage: 481 County: PINELLAS [1] Tides & Solunars |
27° 58' 38" N | 82° 49' 50" W | |
Pinellas Ii |
Large Bait Fish School Adjacent To Tires Date of Deployment: June 25 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 44" N | 83° 11' 6" W |
Pinellas Ii |
Tight But Unstable Patch 17 Foot Profile Date of Deployment: June 4 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft Relief: 17 ft [1] Tides & Solunars |
80 ft | 27° 52' 46" N | 83° 11' 6" W |
Pinellas Ii |
Compact Configuration With About 10 Foot Profile Date of Deployment: July 24 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft Relief: 10 ft [1] Tides & Solunars |
80 ft | 27° 52' 47" N | 83° 11' 9" W |
Pinellas Ii |
Near Older Tire Units Date of Deployment: July 17 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 47" N | 83° 11' 7" W |
Pinellas Ii |
Near Older Tire Units Date of Deployment: July 2 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 47" N | 83° 11' 7" W |
Pinellas Ii |
Good Small Patch Date of Deployment: June 11 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 49" N | 83° 11' 11" W |
Pinellas Ii |
Scattered About The Bottom Minimum Profile Date of Deployment: May 2 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft Relief: 15 ft [1] Tides & Solunars |
80 ft | 27° 52' 49" N | 83° 11' 9" W |
Pinellas Ii |
Boat Mold Adjacent To Tires Date of Deployment: May 29 1985 Primary Material: FIBERGLASS BOAT MOLD County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 49" N | 83° 11' 9" W |
Pinellas Ii |
Tires Placed In Tight Patch 15 Foot Profile Date of Deployment: April 30 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft Relief: 15 ft [1] Tides & Solunars |
80 ft | 27° 52' 50" N | 83° 11' 7" W |
Pinellas Ii |
Highly Scattered Due To Rough Seas Date of Deployment: May 22 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 50" N | 83° 11' 11" W |
Pinellas Ii |
Two Piles 30 Feet Apart 15 Foot Profile Date of Deployment: May 21 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft Relief: 15 ft [1] Tides & Solunars |
80 ft | 27° 52' 51" N | 83° 11' 1" W |
Pinellas Ii |
Highly Scattered Due To Rough Seas Date of Deployment: May 8 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft Relief: 3 ft [1] Tides & Solunars |
80 ft | 27° 52' 52" N | 83° 11' 5" W |
Pinellas Ii |
Tires Placed In Tight Patch 15 Foot Profile Date of Deployment: April 23 1985 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft Relief: 15 ft [1] Tides & Solunars |
80 ft | 27° 52' 52" N | 83° 11' 5" W |
Pinellas Ii-Buoy Site |
4 Large Culverts 54 Date of Deployment: May 4 1999 Primary Material: CONCRETE CULVERTS Tonnage: 18 County: PINELLAS Depth: 81 ft Relief: 12 ft [1] Tides & Solunars |
81 ft | 27° 52' 38" N | 83° 11' 16" W |
Pinellas Ii - Blackthorn |
180 Foot Coast Guard Cutter The Blackthorn Date of Deployment: December 31 1982 Primary Material: SHIP STEEL County: PINELLAS Depth: 80 ft Relief: 30 ft [1] Tides & Solunars |
80 ft | 27° 52' 34" N | 83° 11' 17" W |
Pinellas Ii Reef |
Compacted Tire Units 80 Sq. Feet Coverage Date of Deployment: June 23 1983 Primary Material: TIRE UNITS COMPACTED County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 31" N | 83° 11' 16" W |
Pinellas Ii Reef |
Compacted Tire Units 150 Sq. Feet Coverage Date of Deployment: April 13 1983 Primary Material: TIRE UNITS COMPACTED County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 44" N | 83° 11' 14" W |
Pinellas Ii Reef |
Tire Units 175 Sq. Feet Coverage Date of Deployment: April 26 1983 Primary Material: TIRE UNITS County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 47" N | 83° 11' 12" W |
Pinellas Ii Reef |
Banded Split Tire Units 100 Sq. Feet Coverage Date of Deployment: June 21 1983 Primary Material: TIRE UNITS SPLIT AND BANDED County: PINELLAS Depth: 80 ft [1] Tides & Solunars |
80 ft | 27° 52' 47" N | 83° 11' 9" W |
Pinellas South Reef |
Steel Barge 75X24x6’ Upright East-West Date of Deployment: June 17 2004 Primary Material: BARGE STEEL 75’ Tonnage: 80 County: PINELLAS Depth: 50 ft Relief: 9 ft [1] Tides & Solunars |
50 ft | 27° 43' 20" N | 82° 58' 29" W |
Pinellas South Reef |
Steel Barge 110X50x10’ Upright Southwest To Northeast Date of Deployment: June 18 2004 Primary Material: BARGE STEEL 110’ Tonnage: 200 County: PINELLAS Depth: 50 ft Relief: 12 ft [1] Tides & Solunars |
50 ft | 27° 43' 22" N | 82° 58' 35" W |
Pinellas South Reef |
Steel Hulled Tugboat Orange 80’ X 20’ X 12’H Resting On Port Side Date of Deployment: April 8 2003 Primary Material: SHIP STEEL TUGBOAT 80’ Tonnage: 148 County: PINELLAS Depth: 45 ft Relief: 20 ft [1] Tides & Solunars |
45 ft | 27° 43' 23" N | 82° 58' 27" W |
Pinellas South Reef |
16 Sinkers Placed Around Corners Of The Site Date of Deployment: April 2 2003 Primary Material: CONCRETE SINKERS (16) Tonnage: 80 County: PINELLAS Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 27° 43' 23" N | 82° 58' 27" W |
Pinellas South Reef |
16 Sinkers Placed Around Corners Of The Site Date of Deployment: April 3 2003 Primary Material: CONCRETE SINKERS (10) Tonnage: 80 County: PINELLAS Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 27° 43' 23" N | 82° 58' 27" W |
Pinellas South Reef |
8 Pieces Of 6X4x5 Concrete Junction Boxes Date of Deployment: March 25 2003 Primary Material: CONCRETE JUNCTION BOXES (8) Tonnage: 32 County: PINELLAS Depth: 41 ft Relief: 6 ft [1] Tides & Solunars |
41 ft | 27° 43' 23" N | 82° 58' 27" W |
Pinellas South Reef |
Steel Barge 114X28x7’ Upright Date of Deployment: June 17 2004 Primary Material: BARGE STEEL 110’ Tonnage: 140 County: PINELLAS Depth: 50 ft Relief: 10 ft [1] Tides & Solunars |
50 ft | 27° 43' 23" N | 82° 58' 37" W |
Pinellas South Reef |
18 And 15 Diameter Culverts At Site -5(1) Date of Deployment: September 30 2004 Primary Material: CONCRETE CULVERTS (29) County: PINELLAS Depth: 46 ft Relief: 11 ft [1] Tides & Solunars |
46 ft | 27° 43' 29" N | 82° 58' 36" W |
Pinellas South Reef |
2418 And 15 Diameter Culverts At Site#5 Date of Deployment: August 26 2004 Primary Material: CONCRETE CULVERTS (41) County: PINELLAS Depth: 46 ft Relief: 20 ft [1] Tides & Solunars |
46 ft | 27° 43' 29" N | 82° 58' 36" W |
Pinellas South Reef |
42 2418 And 15 Diameter Culverts At Site -5(1) Date of Deployment: September 1 2004 Primary Material: CONCRETE CULVERTS (30) County: PINELLAS Depth: 46 ft Relief: 20 ft [1] Tides & Solunars |
46 ft | 27° 43' 30" N | 82° 58' 36" W |
Pinellas South Reefsite-5 |
34 18And 15 Diameter Culverts At Site -5(3) Date of Deployment: November 2 2004 Primary Material: CONCRETE CULVERTS (35) Tonnage: 25.7 County: PINELLAS Depth: 47 ft Relief: 11 ft [1] Tides & Solunars |
47 ft | 27° 43' 29" N | 82° 58' 35" W |
Pinellas South Reefsite-5 |
48And 36 Diameter Culverts At Site -5(2) Date of Deployment: October 26 2004 Primary Material: CONCRETE CULVERTS (9) County: PINELLAS Depth: 48 ft Relief: 9 ft [1] Tides & Solunars |
48 ft | 27° 43' 30" N | 82° 58' 35" W |
Pinellas South Reefsite1 |
Layered Pipes And Poles 34 Feet Se Of Main Pile Date of Deployment: April 2 2002 Primary Material: CONCRETE CULVERTS (17) Tonnage: 34 County: PINELLAS Depth: 48 ft Relief: 14 ft [1] Tides & Solunars |
48 ft | 27° 43' 22" N | 82° 58' 31" W |
Pinellas South Reefsite1 |
24 48 And 15 X 8 Feet Culverts Date of Deployment: November 19 2001 Primary Material: CONCRETE CULVERTS (26) Tonnage: 30 County: PINELLAS Depth: 47 ft Relief: 13 ft [1] Tides & Solunars |
47 ft | 27° 43' 22" N | 82° 58' 33" W |
Pinellas South Reefsite1 |
42 And 18 X 8 Feet Culverts Date of Deployment: December 5 2001 Primary Material: CONCRETE CULVERTS (17) Tonnage: 33.3 County: PINELLAS Depth: 47 ft Relief: 16 ft [1] Tides & Solunars |
47 ft | 27° 43' 22" N | 82° 58' 33" W |
Pinellas South Reefsite1 |
36 Pieces Placed 34 Ft South Of Main Pile Date of Deployment: March 21 2002 Primary Material: CONCRETE CULVERTS (36) Tonnage: 25 County: PINELLAS Depth: 48 ft Relief: 9 ft [1] Tides & Solunars |
48 ft | 27° 43' 22" N | 82° 58' 33" W |
Pinellas South Reefsite1 |
24 48 And 15 Culverts Date of Deployment: November 7 2001 Primary Material: CONCRETE CULVERTS (23) Tonnage: 29.5 County: PINELLAS Depth: 47 ft Relief: 13 ft [1] Tides & Solunars |
47 ft | 27° 43' 22" N | 82° 58' 32" W |
Pinellas South Reefsite1 |
24 48 And 15 Culverts Date of Deployment: October 4 2001 Primary Material: CONCRETE CULVERTS (23) Tonnage: 30.8 County: PINELLAS Depth: 48 ft Relief: 10 ft [1] Tides & Solunars |
48 ft | 27° 43' 23" N | 82° 58' 32" W |
Pinellas South Reefsite1 |
24 48 And 15 X 8 Feet Culverts Date of Deployment: November 8 2001 Primary Material: CONCRETE CULVERTS (23) Tonnage: 29.5 County: PINELLAS Depth: 47 ft Relief: 14 ft [1] Tides & Solunars |
47 ft | 27° 43' 23" N | 82° 58' 33" W |
Pinellas South Reefsite1 |
24 48 And 15 X 8 Feet Culverts Date of Deployment: November 20 2001 Primary Material: CONCRETE CULVERTS (24) Tonnage: 35 County: PINELLAS Depth: 47 ft Relief: 13 ft [1] Tides & Solunars |
47 ft | 27° 43' 23" N | 82° 58' 33" W |
Pinellas South Reefsite1 |
24 Pieces Culverts Various Sizes And 4 Slabs Date of Deployment: June 20 2002 Primary Material: CONCRETE CULVERTS (24) Tonnage: 36.7 County: PINELLAS Depth: 47 ft Relief: 12 ft [1] Tides & Solunars |
47 ft | 27° 43' 23" N | 82° 58' 31" W |
Pinellas South Reefsite1 |
30 24 15 And 18 X 8 Feet Culverts Date of Deployment: December 13 2001 Primary Material: CONCRETE CULVERTS (39) County: PINELLAS Depth: 48 ft Relief: 16 ft [1] Tides & Solunars |
48 ft | 27° 43' 23" N | 82° 58' 32" W |
Pinellas South Reefsite1 |
24 48 And 15 X 8 Feet Culverts Date of Deployment: November 28 2001 Primary Material: CONCRETE CULVERTS (22) Tonnage: 29.5 County: PINELLAS Depth: 48 ft Relief: 16 ft [1] Tides & Solunars |
48 ft | 27° 43' 23" N | 82° 58' 32" W |
Pinellas South Reefsite1 |
26 Pieces Culverts Various Sizes Date of Deployment: June 12 2002 Primary Material: CONCRETE CULVERTS (26) Tonnage: 34 County: PINELLAS Depth: 50 ft Relief: 15 ft [1] Tides & Solunars |
50 ft | 27° 43' 23" N | 82° 58' 33" W |
Port Manatee Reef (Bay) - #1 |
450 Pounds Of Concrete Construction Blocks Date of Deployment: August 16 1997 Primary Material: CONCRETE BLOCKS County: HILLSBOROUGH Depth: 20 ft Relief: 1 ft [1] Tides & Solunars |
20 ft | 27° 39' 42" N | 82° 34' 48" W |
Port Manatee Reef (Bay) - #10 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: March 2 2004 Primary Material: BRIDGE SPANS Tonnage: 489.1 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 44" N | 82° 34' 41" W |
Port Manatee Reef (Bay) - #11 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: February 13 2004 Primary Material: BRIDGE SPANS Tonnage: 225.24 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 50" N | 82° 34' 50" W |
Port Manatee Reef (Bay) - #12 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: November 14 2001 Primary Material: BRIDGE SPANS Tonnage: 177.58 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 50" N | 82° 34' 40" W |
Port Manatee Reef (Bay) - #13 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: October 25 2001 Primary Material: BRIDGE SPANS Tonnage: 187.44 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 47" N | 82° 34' 48" W |
Port Manatee Reef (Bay) - #14 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: October 19 2001 Primary Material: BRIDGE SPANS Tonnage: 92.49 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 50" N | 82° 34' 48" W |
Port Manatee Reef (Bay) - #15 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: June 11 2003 Primary Material: BRIDGE SPANS Tonnage: 319.9 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 47" N | 82° 34' 40" W |
Port Manatee Reef (Bay) - #16 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: February 19 2004 Primary Material: BRIDGE SPANS Tonnage: 258.63 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 46" N | 82° 34' 48" W |
Port Manatee Reef (Bay) - #17 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: June 3 2003 Primary Material: BRIDGE SPANS Tonnage: 501.01 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 53" N | 82° 34' 48" W |
Port Manatee Reef (Bay) - #18 |
632 Tons Of Concrete Culverts And Pipes. Date of Deployment: September 10 1991 Primary Material: CONCRETE CULVERTS Tonnage: 632 County: HILLSBOROUGH Depth: 17 ft [1] Tides & Solunars |
17 ft | 27° 39' 44" N | 82° 34' 45" W |
Port Manatee Reef (Bay) - #2 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: November 6 2001 Primary Material: BRIDGE SPANS Tonnage: 184.98 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 45" N | 82° 34' 49" W |
Port Manatee Reef (Bay) - #3 |
Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load Date of Deployment: November 26 2001 Primary Material: BRIDGE SPANS Tonnage: 166.48 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 48" N | 82° 34' 47" W |
Port Manatee Reef (Bay) - #4 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: July 1 2003 Primary Material: BRIDGE SPANS Tonnage: 514.55 County: HILLSBOROUGH Depth: 19 ft Relief: 8 ft [1] Tides & Solunars |
19 ft | 27° 39' 50" N | 82° 34' 43" W |
Port Manatee Reef (Bay) - #5 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: February 17 2004 Primary Material: BRIDGE SPANS Tonnage: 266.04 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 47" N | 82° 34' 49" W |
Port Manatee Reef (Bay) - #6 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: February 1 2004 Primary Material: BRIDGE SPANS Tonnage: 150.16 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 51" N | 82° 34' 49" W |
Port Manatee Reef (Bay) - #7 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: January 28 2004 Primary Material: BRIDGE SPANS Tonnage: 354.18 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 46" N | 82° 34' 47" W |
Port Manatee Reef (Bay) - #8 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: January 23 2004 Primary Material: BRIDGE SPANS Tonnage: 408.04 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 52" N | 82° 34' 48" W |
Port Manatee Reef (Bay) - #9 |
Concrete Bridge Decking Railings And Rubble From Treasure Island Causew Date of Deployment: January 20 2004 Primary Material: BRIDGE SPANS Tonnage: 408.04 County: HILLSBOROUGH Depth: 21 ft Relief: 8 ft [1] Tides & Solunars |
21 ft | 27° 39' 44" N | 82° 34' 40" W |
Port Tampa Reef (Bay) - #1 |
Sixty Concrete Half Blocks 7 Inches X 7 Inches X 7 Inches Date of Deployment: October 19 2000 Primary Material: CONCRETE RUBBLE Tonnage: 0.25 County: HILLSBOROUGH Depth: 24 ft Relief: 2 ft [1] Tides & Solunars |
24 ft | 27° 51' 38" N | 82° 33' 47" W |
Port Tampa Reef (Bay) - #2 |
Chamberlain H.S. Chief Reef 17 Modules Limestone Embedded In Concr Date of Deployment: October 17 2002 Primary Material: MODULES LIMESTONE IN CONCRETE (17) Tonnage: 0.85 County: HILLSBOROUGH Depth: 21 ft Relief: 1 ft [1] Tides & Solunars |
21 ft | 27° 51' 42" N | 82° 33' 48" W |
Port Tampa Reef (Bay) - #3 |
Chamberlain High School Modules Project Date of Deployment: September 25 2003 Primary Material: LIMESTONE IMBEDDED IN CONCRETE Tonnage: 0.8 County: HILLSBOROUGH Depth: 24 ft Relief: 1 ft [1] Tides & Solunars |
24 ft | 27° 51' 43" N | 82° 33' 48" W |
Port Tampa Reef (Bay) - #4 |
Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier Date of Deployment: May 28 2002 Primary Material: CONCRETE PILE CUTOFFS Tonnage: 224.4 County: HILLSBOROUGH Depth: 21 ft Relief: 10 ft [1] Tides & Solunars |
21 ft | 27° 51' 44" N | 82° 33' 47" W |
Port Tampa Reef (Bay) - #5 |
4 Steel Barges Bridge Rubble Concrete Pilings Date of Deployment: March 21 1987 Primary Material: BARGES STEEL (4) County: HILLSBOROUGH Depth: 24 ft Relief: 12 ft [1] Tides & Solunars |
24 ft | 27° 51' 39" N | 82° 33' 50" W |
Port Tampa Reef (Bay) - #6 |
Annual Deployment On The Chamberlain High School Reef Date of Deployment: September 22 1999 Primary Material: CONCRETE BLOCKS (50) Tonnage: 0.25 County: HILLSBOROUGH Depth: 24 ft Relief: 12 ft [1] Tides & Solunars |
24 ft | 27° 51' 38" N | 82° 33' 47" W |
Rube Allyn Reef - #1 |
2 Loads From 5/17/83 To 6/7/83 Fiberglass Boat Molds Date of Deployment: June 7 1983 Primary Material: FIBERGLASS BOAT MOLD County: PINELLAS [1] Tides & Solunars |
27° 55' 39" N | 83° 1' 24" W | |
Rube Allyn Reef - #10 |
21.0 Yards. Of Concrete Culverts (6 Of 11 Loads) Date of Deployment: November 27 1990 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 55' 34" N | 83° 1' 27" W | |
Rube Allyn Reef - #11 |
18.0 Yards. Of Concrete Culverts (4 Of 11 Loads) Date of Deployment: November 21 1990 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 55' 34" N | 83° 1' 27" W | |
Rube Allyn Reef - #12 |
One 30’Lx 15’W X 13’H Barge Date of Deployment: June 9 1999 Primary Material: BARGE STEEL 30’ Tonnage: 15 County: PINELLAS Depth: 47 ft Relief: 13 ft [1] Tides & Solunars |
47 ft | 27° 56' 9" N | 83° 1' 21" W |
Rube Allyn Reef - #13 |
16 Pieces Of Concrete 15 To 48 Inch Sizes Date of Deployment: July 23 1999 Primary Material: CONCRETE CULVERTS Tonnage: 31 County: PINELLAS Depth: 48 ft Relief: 14 ft [1] Tides & Solunars |
48 ft | 27° 56' 8" N | 83° 1' 20" W |
Rube Allyn Reef - #14 |
Compacted Tire Units 176 Pieces 30 Tons 1550 Sq. Feet Date of Deployment: August 30 1982 Primary Material: TIRE UNITS COMPACTED (176) Tonnage: 30 County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 56' 8" N | 83° 1' 24" W |
Rube Allyn Reef - #15 |
Compacted Tire Units 500 Sq. Feet Coverage Date of Deployment: February 17 1983 Primary Material: TIRE UNITS County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 42" N | 83° 1' 24" W |
Rube Allyn Reef - #16 |
Compacted Tires Units 1240 Sq. Feet Date of Deployment: August 31 1982 Primary Material: TIRE UNITS COMPACTED County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 39" N | 83° 1' 24" W |
Rube Allyn Reef - #17 |
1000 Square Feet Of Coverage Date of Deployment: September 9 1982 Primary Material: TIRE UNITS COMPACTED County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 43" N | 83° 1' 23" W |
Rube Allyn Reef - #18 |
1000 Square Feet Of Coverage Date of Deployment: September 17 1982 Primary Material: TIRE UNITS COMPACTED County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 43" N | 83° 1' 23" W |
Rube Allyn Reef - #19 |
Compacted Tire Units 600 Sq. Feet Coverage Date of Deployment: February 1 1983 Primary Material: TIRE UNITS COMPACTED County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 42" N | 83° 1' 24" W |
Rube Allyn Reef - #2 |
Boat Molds And Culverts Date of Deployment: July 10 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 44" N | 83° 1' 21" W |
Rube Allyn Reef - #20 |
Compacted Tire Units 650 Sq. Feet Coverage Date of Deployment: April 27 1983 Primary Material: TIRE UNITS COMPACTED County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 45" N | 83° 1' 22" W |
Rube Allyn Reef - #21 |
7 - 12 X 30’ Steel Beams Date of Deployment: October 22 2003 Primary Material: STEEL BEAMS (7) Tonnage: 6 County: PINELLAS Depth: 45 ft Relief: 17 ft [1] Tides & Solunars |
45 ft | 27° 55' 55" N | 83° 1' 26" W |
Rube Allyn Reef - #22 |
Fiberglass Boat Molds 300 Sq. Feet Coverage Date of Deployment: December 20 1982 Primary Material: FIBERGLASS BOAT MOLDS County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 39" N | 83° 1' 24" W |
Rube Allyn Reef - #23 |
2- 41X18x8 1- 33X12x3 1- 41X18x3 100 Sq. Feet Coverage Date of Deployment: June 1 1983 Primary Material: FIBERGLASS BOAT MOLDS (4) County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 41" N | 83° 1' 25" W |
Rube Allyn Reef - #24 |
3 Molds 15X8x1 50X16x8 25X10x2 Date of Deployment: June 1 1983 Primary Material: FIBERGLASS BOAT MOLDS (3) County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 39" N | 83° 1' 23" W |
Rube Allyn Reef - #25 |
37 X 8 X 4 Fiberglass Boat Molds Date of Deployment: May 11 1983 Primary Material: FIBERGLASS BOAT MOLDS County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 43" N | 83° 1' 23" W |
Rube Allyn Reef - #26 |
30 X 10 X 3 Feet Fiberglass Boat Molds Date of Deployment: May 12 1983 Primary Material: FIBERGLASS BOAT MOLDS (3) County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 43" N | 83° 1' 23" W |
Rube Allyn Reef - #27 |
37 X 8 X 4 Feet Fiberglass Boat Molds Date of Deployment: May 18 1983 Primary Material: FIBERGLASS BOAT MOLDS County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 43" N | 83° 1' 23" W |
Rube Allyn Reef - #28 |
50 X 10 X 3 Feet Fiberglass Boat Molds Date of Deployment: May 19 1983 Primary Material: FIBERGLASS BOAT MOLDS (3) County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 43" N | 83° 1' 23" W |
Rube Allyn Reef - #29 |
50 X 12 X 4 Feet 2 Units 75 Sq. Feet Coverage Date of Deployment: May 24 1983 Primary Material: FIBERGLASS BOAT MOLDS (2) County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 43" N | 83° 1' 23" W |
Rube Allyn Reef - #3 |
Cement Sinkers Placed In Scattered Units 3 Feet Profile Date of Deployment: July 3 1985 Primary Material: CONCRETE SINKERS County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 56' 13" N | 83° 1' 17" W |
Rube Allyn Reef - #30 |
50 X 15 X 10 Feet Fiberglass Boat Molds (3) Date of Deployment: May 26 1983 Primary Material: FIBERGLASS BOAT MOLDS (3) County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 27° 55' 39" N | 83° 1' 23" W |
Rube Allyn Reef - #31 |
Concrete Culverts And Concrete Pilings. Date of Deployment: April 4 1988 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 44 ft Relief: 11 ft [1] Tides & Solunars |
44 ft | 27° 55' 17" N | 83° 1' 29" W |
Rube Allyn Reef - #32 |
26 Separate Loads Of Concrete Date of Deployment: April 3 1989 Primary Material: CONCRETE RUBBLE County: PINELLAS Depth: 53 ft [1] Tides & Solunars |
53 ft | 27° 55' 10" N | 83° 1' 33" W |
Rube Allyn Reef - #33 |
431 Culverts Next To Sand Key Bridge 16 Loads Began On 5/23/96 Date of Deployment: November 7 1996 Primary Material: CONCRETE CULVERTS Tonnage: 478 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 18" N | 83° 1' 18" W |
Rube Allyn Reef - #35 |
9 Pieces Culverts Various Sizes Date of Deployment: April 21 2003 Primary Material: CONCRETE CULVERTS (9) Tonnage: 26 County: PINELLAS Depth: 43 ft Relief: 12 ft [1] Tides & Solunars |
43 ft | 27° 55' 55" N | 83° 1' 25" W |
Rube Allyn Reef - #36 |
26 Pieces Culverts Various Sizes Date of Deployment: March 28 2002 Primary Material: CONCRETE CULVERTS (26) Tonnage: 26 County: PINELLAS Depth: 46 ft Relief: 10 ft [1] Tides & Solunars |
46 ft | 27° 55' 57" N | 83° 1' 26" W |
Rube Allyn Reef - #37 |
Placed On Southwest Corner Of Site Date of Deployment: June 4 2002 Primary Material: CONCRETE CULVERTS (27) Tonnage: 30.2 County: PINELLAS Depth: 45 ft Relief: 13 ft [1] Tides & Solunars |
45 ft | 27° 55' 56" N | 83° 1' 26" W |
Rube Allyn Reef - #38 |
Placed On South Side Of Site Date of Deployment: April 10 2002 Primary Material: CONCRETE CULVERTS (25) Tonnage: 29 County: PINELLAS Depth: 45 ft Relief: 4 ft [1] Tides & Solunars |
45 ft | 27° 55' 56" N | 83° 1' 25" W |
Rube Allyn Reef - #39 |
Placed On Southwest Corner Of Site Date of Deployment: April 4 2002 Primary Material: CONCRETE CULVERTS (25) Tonnage: 34.75 County: PINELLAS Depth: 47 ft Relief: 6 ft [1] Tides & Solunars |
47 ft | 27° 55' 55" N | 83° 1' 25" W |
Rube Allyn Reef - #4 |
282 Culverts Next To Sand Key Bridge 9 Loads Began On 11/14/96 Date of Deployment: December 12 1996 Primary Material: CONCRETE CULVERTS Tonnage: 258 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 15" N | 83° 1' 21" W |
Rube Allyn Reef - #40 |
21 Pieces Culverts West Of Previous Drop Date of Deployment: April 1 2002 Primary Material: CONCRETE CULVERTS (21) Tonnage: 36.25 County: PINELLAS Depth: 46 ft [1] Tides & Solunars |
46 ft | 27° 55' 57" N | 83° 1' 26" W |
Rube Allyn Reef - #41 |
24 Pieces Placed South Of Previous Drop Date of Deployment: March 25 2002 Primary Material: CONCRETE CULVERTS OVALS (24) Tonnage: 18 County: PINELLAS Depth: 48 ft Relief: 6 ft [1] Tides & Solunars |
48 ft | 27° 55' 57" N | 83° 1' 25" W |
Rube Allyn Reef - #42 |
30 Pieces Stackedrube Allyn Reef South Side Date of Deployment: March 19 2002 Primary Material: CONCRETE CUTOFFS Tonnage: 21 County: PINELLAS Depth: 48 ft Relief: 5 ft [1] Tides & Solunars |
48 ft | 27° 55' 56" N | 83° 1' 25" W |
Rube Allyn Reef - #5 |
20.2 Yards. Of Concrete Culverts (10 Of 11 Loads) Date of Deployment: December 12 1990 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 55' 33" N | 83° 1' 26" W | |
Rube Allyn Reef - #6 |
21 Yd. Of Concrete Culvert (11Th Of 11 Loads) Date of Deployment: December 13 1990 Primary Material: CONCRETE RUBBLE County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 32" N | 83° 1' 27" W |
Rube Allyn Reef - #7 |
20.0 Yards. Of Concrete Culverts (9 Of 11 Loads) Date of Deployment: December 11 1990 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 55' 34" N | 83° 1' 27" W | |
Rube Allyn Reef - #8 |
16.0 Yards. Of Concrete Culverts (8 Of 11 Loads) Date of Deployment: December 10 1990 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 55' 34" N | 83° 1' 27" W | |
Rube Allyn Reef - #9 |
20.0 Yards. Of Concrete Culverts (7 Of 11 Loads) Date of Deployment: November 29 1990 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 55' 34" N | 83° 1' 27" W | |
Rube Allyn Reef - Sand Key Bridge |
One Of Four Loads Of Sand Key Bridge Non Grant 70000 Tons Total Date of Deployment: December 31 1996 Primary Material: BRIDGE RUBBLE CONCRETE County: PINELLAS Depth: 43 ft Relief: 25 ft [1] Tides & Solunars |
43 ft | 27° 55' 15" N | 83° 1' 25" W |
Rube Allyn Reef - Zone F |
173 Culverts In Sub Zone F Seven Loads Began On 2/12/96 Date of Deployment: February 21 1996 Primary Material: CONCRETE CULVERTS Tonnage: 135 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 15" N | 83° 1' 29" W |
Rube Allyn Reef - Zone F #2 |
67 Large Concrete Pieces Sub Zone F One Load Date of Deployment: January 30 1996 Primary Material: CONCRETE PIECES Tonnage: 353 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 15" N | 83° 1' 29" W |
Rube Allyn Reef - Zone F #3 |
14 Concrete Pilings Sub Zone F Date of Deployment: November 7 1995 Primary Material: CONCRETE PILINGS Tonnage: 23 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 19" N | 83° 1' 29" W |
Rube Allyn Reef - Zone F #4 |
14 Concrete Pilings Sub Zone F Date of Deployment: November 2 1995 Primary Material: CONCRETE PILINGS Tonnage: 23 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 19" N | 83° 1' 29" W |
Rube Allyn Reef - Zone F #5 |
21 Concrete Culverts Sub Zone F Date of Deployment: April 9 1994 Primary Material: CONCRETE CULVERTS Tonnage: 37 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 19" N | 83° 1' 29" W |
Rube Allyn Reef - Zone G |
38 Culverts In Sub Zone G Date of Deployment: February 29 1996 Primary Material: CONCRETE CULVERTS Tonnage: 30 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 20" N | 83° 1' 26" W |
Rube Allyn Reef - Zone I |
21 Concrete Culverts Sub Zone I Date of Deployment: May 23 1994 Primary Material: CONCRETE CULVERTS Tonnage: 28 County: PINELLAS Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 55' 17" N | 83° 1' 19" W |
Sand Key Nourishment Reef #2 - 1 |
50 Pieces Culverts Various Sizes Date of Deployment: March 17 2004 Primary Material: CONCRETE CULVERTS (50) Tonnage: 25.83 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 27" N | 82° 51' 14" W |
Sand Key Nourishment Reef #2 - 10 |
34 Pieces Concrete Culverts Various Sizes Date of Deployment: May 30 2004 Primary Material: CONCRETE CULVERTS (34) Tonnage: 32 County: PINELLAS Depth: 14 ft Relief: 5 ft [1] Tides & Solunars |
14 ft | 27° 53' 28" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 11 |
15 Pieces Power Poles Various Sizes Date of Deployment: May 20 2004 Primary Material: CONCRETE POLES (15) Tonnage: 24.5 County: PINELLAS Depth: 15 ft Relief: 2 ft [1] Tides & Solunars |
15 ft | 27° 53' 29" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 12 |
30 Pieces Power Poles Various Sizes Date of Deployment: May 17 2004 Primary Material: CONCRETE CUTOFFS (30) Tonnage: 31.7 County: PINELLAS Depth: 14 ft Relief: 2 ft [1] Tides & Solunars |
14 ft | 27° 53' 28" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 13 |
31 Pieces Culverts Various Sizes Date of Deployment: May 13 2004 Primary Material: CONCRETE CULVERTS (31) Tonnage: 17 County: PINELLAS Depth: 16 ft Relief: 4 ft [1] Tides & Solunars |
16 ft | 27° 53' 29" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 14 |
18 Pieces Culverts Various Sizes Date of Deployment: April 29 2004 Primary Material: CONCRETE CULVERTS (18) Tonnage: 16.5 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 29" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 15 |
5 Pieces Culverts 54 X 8’ Date of Deployment: April 22 2004 Primary Material: CONCRETE CULVERTS (5) Tonnage: 22 County: PINELLAS Depth: 15 ft Relief: 6 ft [1] Tides & Solunars |
15 ft | 27° 53' 29" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 16 |
27 Pieces Culverts Various Sizes Date of Deployment: April 6 2004 Primary Material: CONCRETE CULVERTS (27) Tonnage: 14.3 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 29" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 17 |
4 Pieces Large Concrete Boxes Date of Deployment: June 14 2004 Primary Material: CONCRETE BOXES (4) Tonnage: 8 County: PINELLAS Depth: 18 ft Relief: 5 ft [1] Tides & Solunars |
18 ft | 27° 53' 25" N | 82° 51' 14" W |
Sand Key Nourishment Reef #2 - 2 |
15 Pieces Culverts Various Sizes Date of Deployment: February 3 2004 Primary Material: CONCRETE CULVERTS (15) Tonnage: 21.91 County: PINELLAS Depth: 16 ft Relief: 5 ft [1] Tides & Solunars |
16 ft | 27° 53' 28" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 3 |
42 Pieces Culverts Various Sizes Date of Deployment: March 1 2004 Primary Material: CONCRETE CULVERTS (42) Tonnage: 30.5 County: PINELLAS Depth: 15 ft Relief: 6 ft [1] Tides & Solunars |
15 ft | 27° 53' 29" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 4 |
29 Pieces Culverts Various Sizes Date of Deployment: February 23 2004 Primary Material: CONCRETE CULVERTS (29) Tonnage: 19.86 County: PINELLAS Depth: 15 ft Relief: 4 ft [1] Tides & Solunars |
15 ft | 27° 53' 28" N | 82° 51' 14" W |
Sand Key Nourishment Reef #2 - 5 |
27 Pieces Culverts Various Sizes Date of Deployment: February 10 2004 Primary Material: CONCRETE CULVERTS (27) Tonnage: 22.5 County: PINELLAS Depth: 15 ft Relief: 4 ft [1] Tides & Solunars |
15 ft | 27° 53' 28" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 6 |
24 Pieces Culverts Various Sizes Date of Deployment: February 4 2004 Primary Material: CONCRETE CULVERTS (24) Tonnage: 27 County: PINELLAS Depth: 16 ft Relief: 5 ft [1] Tides & Solunars |
16 ft | 27° 53' 28" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 7 |
24 Pieces Culverts Various Sizes Date of Deployment: February 5 2004 Primary Material: CONCRETE CULVERTS (24) Tonnage: 18.5 County: PINELLAS Depth: 16 ft Relief: 4 ft [1] Tides & Solunars |
16 ft | 27° 53' 28" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 8 |
3 Large 4X4x4 Concrete Boxes Date of Deployment: March 19 2004 Primary Material: CONCRETE BOXES (3) Tonnage: 3 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 28" N | 82° 51' 13" W |
Sand Key Nourishment Reef #2 - 9 |
20 Pieces Culverts Various Sizes Date of Deployment: March 16 2004 Primary Material: CONCRETE CULVERTS (20) Tonnage: 21 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 29" N | 82° 51' 14" W |
Sand Key Nourishment Reef #3 - 1 |
21 Pieces Culverts Various Sizes Date of Deployment: August 21 2003 Primary Material: CONCRETE CULVERTS (21) Tonnage: 30.5 County: PINELLAS Depth: 16 ft Relief: 5 ft [1] Tides & Solunars |
16 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 10 |
29 Pieces Culverts Various Sizes Date of Deployment: August 11 2003 Primary Material: CONCRETE CULVERTS (29) Tonnage: 22 County: PINELLAS Depth: 18 ft Relief: 5 ft [1] Tides & Solunars |
18 ft | 27° 53' 32" N | 82° 51' 12" W |
Sand Key Nourishment Reef #3 - 11 |
21 Pieces Culverts Various Sizes Date of Deployment: August 1 2003 Primary Material: CONCRETE CULVERTS (21) Tonnage: 27.5 County: PINELLAS Depth: 17 ft Relief: 6 ft [1] Tides & Solunars |
17 ft | 27° 53' 30" N | 82° 51' 12" W |
Sand Key Nourishment Reef #3 - 12 |
30 Pieces Culverts Various Sizes Date of Deployment: September 2 2003 Primary Material: CONCRETE CULVERTS (30) Tonnage: 21.64 County: PINELLAS Depth: 16 ft Relief: 4 ft [1] Tides & Solunars |
16 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 13 |
28 Pieces Culverts Various Sizes Date of Deployment: October 8 2003 Primary Material: CONCRETE CULVERTS (28) Tonnage: 27 County: PINELLAS Depth: 17 ft Relief: 5 ft [1] Tides & Solunars |
17 ft | 27° 53' 30" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 14 |
28 Pieces Culverts Various Sizes Date of Deployment: September 29 2003 Primary Material: CONCRETE CULVERTS (28) Tonnage: 30.4 County: PINELLAS Depth: 17 ft Relief: 5 ft [1] Tides & Solunars |
17 ft | 27° 53' 30" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 15 |
24 Pieces Culverts Various Sizes Date of Deployment: September 26 2003 Primary Material: CONCRETE CULVERTS (24) Tonnage: 14 County: PINELLAS Depth: 18 ft Relief: 4 ft [1] Tides & Solunars |
18 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 2 |
34 Pieces Concrete Cutoffs Various Sizes Date of Deployment: September 17 2003 Primary Material: CONCRETE CUTOFFS (34) Tonnage: 25 County: PINELLAS Depth: 16 ft Relief: 4 ft [1] Tides & Solunars |
16 ft | 27° 53' 30" N | 82° 51' 14" W |
Sand Key Nourishment Reef #3 - 3 |
11 Pieces Culverts Various Sizes Date of Deployment: September 23 2003 Primary Material: CONCRETE CULVERTS (11) Tonnage: 31 County: PINELLAS Depth: 17 ft Relief: 5 ft [1] Tides & Solunars |
17 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 4 |
26 Pieces Culverts Various Sizes Date of Deployment: August 26 2003 Primary Material: CONCRETE CULVERTS (26) County: PINELLAS Depth: 18 ft Relief: 4 ft [1] Tides & Solunars |
18 ft | 27° 53' 31" N | 82° 51' 14" W |
Sand Key Nourishment Reef #3 - 5 |
15 Pieces Culverts Various Sizes Date of Deployment: September 24 2003 Primary Material: CONCRETE CULVERTS (15) Tonnage: 25 County: PINELLAS Depth: 17 ft Relief: 5 ft [1] Tides & Solunars |
17 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 6 |
24 Pieces Culverts Various Sizes Date of Deployment: August 20 2003 Primary Material: CONCRETE CULVERTS (24) Tonnage: 30.6 County: PINELLAS Depth: 16 ft Relief: 5 ft [1] Tides & Solunars |
16 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 7 |
26 Pieces Culverts Various Sizes Date of Deployment: August 18 2003 Primary Material: CONCRETE CULVERTS (26) Tonnage: 21.2 County: PINELLAS Depth: 15 ft Relief: 6 ft [1] Tides & Solunars |
15 ft | 27° 53' 32" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 8 |
30 Pieces Culverts Various Sizes Date of Deployment: August 13 2003 Primary Material: CONCRETE CULVERTS (30) Tonnage: 34.25 County: PINELLAS Depth: 16 ft Relief: 6 ft [1] Tides & Solunars |
16 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #3 - 9 |
35 Pieces Culverts Various Sizes Date of Deployment: August 12 2003 Primary Material: CONCRETE CULVERTS (35) Tonnage: 32.5 County: PINELLAS Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 53' 32" N | 82° 51' 13" W |
Sand Key Nourishment Reef #5 - 1 |
15 Steel Boxes 4’X2’x2’ 4 Pieces Culverts Various Sizes Date of Deployment: July 10 2002 Primary Material: STEEL BOXES (15) Tonnage: 9 County: PINELLAS Depth: 20 ft Relief: 4 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 10 |
Sand Key Nourishment Reef Project- Date of Deployment: December 6 2001 Primary Material: CONCRETE CULVERTS (16) Tonnage: 25.7 County: PINELLAS Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 27° 53' 41" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 11 |
26 Pieces Culverts Various Sizes Date of Deployment: July 1 2002 Primary Material: CONCRETE CULVERTS (26) Tonnage: 22.2 County: PINELLAS Depth: 20 ft Relief: 6 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 12 |
Sand Key Nourishment Reef Project- Date of Deployment: December 17 2001 Primary Material: CONCRETE CULVERTS (24) Tonnage: 22.25 County: PINELLAS Depth: 17 ft Relief: 5 ft [1] Tides & Solunars |
17 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 13 |
Sand Key Nourishment Reef Project- Date of Deployment: December 11 2001 Primary Material: CONCRETE CULVERTS (28) Tonnage: 30.5 County: PINELLAS Depth: 17 ft Relief: 6 ft [1] Tides & Solunars |
17 ft | 27° 53' 42" N | 82° 51' 10" W |
Sand Key Nourishment Reef #5 - 14 |
29 Pieces Culverts Various Sizes Date of Deployment: June 14 2002 Primary Material: CONCRETE CULVERTS (29) Tonnage: 35 County: PINELLAS Depth: 20 ft Relief: 6 ft [1] Tides & Solunars |
20 ft | 27° 53' 41" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 15 |
Sand Key Nourishment Reef Project- Date of Deployment: December 7 2001 Primary Material: CONCRETE PILINGS (24) Tonnage: 37 County: PINELLAS Depth: 17 ft Relief: 3 ft [1] Tides & Solunars |
17 ft | 27° 53' 41" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 16 |
Sand Key Nourishment Reef Project- Date of Deployment: November 30 2001 Primary Material: CONCRETE CULVERTS (12) Tonnage: 27.5 County: PINELLAS Depth: 20 ft Relief: 4 ft [1] Tides & Solunars |
20 ft | 27° 53' 43" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 17 |
Sand Key Nourishment Reef Project- Date of Deployment: November 29 2001 Primary Material: CONCRETE CULVERTS (12) Tonnage: 36.15 County: PINELLAS Depth: 20 ft Relief: 6 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 10" W |
Sand Key Nourishment Reef #5 - 18 |
Sand Key Nourishment Reef Project- Date of Deployment: November 21 2001 Primary Material: CONCRETE CULVERTS (21) Tonnage: 28.22 County: PINELLAS Depth: 18 ft Relief: 5 ft [1] Tides & Solunars |
18 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 19 |
Sand Key Nourishment Reef Project- Date of Deployment: November 1 2001 Primary Material: CONCRETE CULVERTS (37) Tonnage: 32.8 County: PINELLAS Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 2 |
24 Pieces Culverts Various Sizes And Slabs Date of Deployment: July 11 2002 Primary Material: CONCRETE CULVERTS (24) Tonnage: 30 County: PINELLAS Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 20 |
Sand Key Nourishment Reef Project- Date of Deployment: October 15 2001 Primary Material: CONCRETE CULVERTS (24) Tonnage: 33.2 County: PINELLAS Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 21 |
Sand Key Nourishment Reef Project- Date of Deployment: October 25 2001 Primary Material: CONCRETE CULVERTS (23) Tonnage: 33.5 County: PINELLAS Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 22 |
Sand Key Nourishment Reef Project- Date of Deployment: November 6 2001 Primary Material: CONCRETE CULVERTS (16) Tonnage: 19.36 County: PINELLAS Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 23 |
Sand Key Nourishment Reef Project- Date of Deployment: November 2 2001 Primary Material: CONCRETE CULVERTS (8) Tonnage: 16.55 County: PINELLAS Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 3 |
25 Pieces Culverts Various Sizes Date of Deployment: July 23 2002 Primary Material: CONCRETE CULVERTS (25) Tonnage: 22.5 County: PINELLAS Depth: 20 ft Relief: 6 ft [1] Tides & Solunars |
20 ft | 27° 53' 41" N | 82° 51' 11" W |
Sand Key Nourishment Reef #5 - 4 |
22 Pieces Culverts Various Sizes Date of Deployment: May 22 2003 Primary Material: CONCRETE CULVERTS (22) Tonnage: 30 County: PINELLAS Depth: 16 ft Relief: 5 ft [1] Tides & Solunars |
16 ft | 27° 53' 31" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 5 |
20 Pieces Culverts Various Sizes Date of Deployment: May 21 2003 Primary Material: CONCRETE CULVERTS (20) Tonnage: 28 County: PINELLAS Depth: 16 ft Relief: 4 ft [1] Tides & Solunars |
16 ft | 27° 53' 31" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 6 |
20 Pieces Culverts Various Sizes Date of Deployment: April 28 2003 Primary Material: CONCRETE CULVERTS (20) Tonnage: 10 County: PINELLAS Depth: 17 ft Relief: 3 ft [1] Tides & Solunars |
17 ft | 27° 53' 31" N | 82° 51' 13" W |
Sand Key Nourishment Reef #5 - 7 |
19 Pieces Culverts Various Sizes Date of Deployment: August 1 2002 Primary Material: CONCRETE CULVERTS (19) Tonnage: 25.7 County: PINELLAS Depth: 17 ft Relief: 6 ft [1] Tides & Solunars |
17 ft | 27° 53' 41" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 8 |
34 Pieces Culverts Various Sizes Date of Deployment: June 13 2002 Primary Material: CONCRETE CULVERTS (34) Tonnage: 37.9 County: PINELLAS Depth: 20 ft Relief: 6 ft [1] Tides & Solunars |
20 ft | 27° 53' 42" N | 82° 51' 12" W |
Sand Key Nourishment Reef #5 - 9 |
34 Pieces Culverts Various Sizes Date of Deployment: June 11 2002 Primary Material: CONCRETE CULVERTS (34) Tonnage: 41 County: PINELLAS Depth: 19 ft Relief: 6 ft [1] Tides & Solunars |
19 ft | 27° 53' 42" N | 82° 51' 12" W |
Sand Key Nourishment Reef - #1 |
Sand Key Nourishment Reef Project Date of Deployment: September 20 2001 Primary Material: CONCRETE CULVERTS (10) Tonnage: 14.1 County: PINELLAS Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 27° 53' 49" N | 82° 51' 10" W |
Sand Key Nourishment Reef - #10 |
3630 2418 And 12 Diameter Culverts At Site Imr#1 Date of Deployment: November 1 2004 Primary Material: CONCRETE CULVERTS (28) Tonnage: 24.2 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 25" N | 82° 51' 14" W |
Sand Key Nourishment Reef - #12 |
Sand Key Nourishment Reef Project- Date of Deployment: October 8 2001 Primary Material: CONCRETE CULVERTS (25) Tonnage: 27.79 County: PINELLAS Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 27° 53' 42" N | 82° 51' 11" W |
Sand Key Nourishment Reef - #2 |
Sand Key Nourishment Reef Project Date of Deployment: September 24 2001 Primary Material: CONCRETE CULVERTS (8) Tonnage: 20 County: PINELLAS Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 27° 53' 49" N | 82° 51' 10" W |
Sand Key Nourishment Reef - #3 |
Sand Key Nourishment Reef Project-1Mr6 Date of Deployment: September 26 2001 Primary Material: CONCRETE CULVERTS (24) County: PINELLAS Depth: 18 ft Relief: 5 ft [1] Tides & Solunars |
18 ft | 27° 53' 48" N | 82° 51' 11" W |
Sand Key Nourishment Reef - #4 |
Three Loads Same Numbers Also 11/9/2004 And 11/10/2004 Date of Deployment: November 8 2004 Primary Material: CONCRETE CULVERTS (65) Tonnage: 69.59 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 25" N | 82° 51' 14" W |
Sand Key Nourishment Reef - #5 |
3630 Diameter Culverts At Site Imr#1 Date of Deployment: October 29 2004 Primary Material: CONCRETE CULVERTS (12) Tonnage: 25 County: PINELLAS Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 53' 25" N | 82° 51' 14" W |
Sand Key Nourishment Reef - #6 |
4 Deployment Dates Same Location Also 8-19 8-23 And 8-24 Date of Deployment: August 25 2004 Primary Material: CONCRETE POWER POLES (105) Tonnage: 100.25 County: PINELLAS Depth: 20 ft Relief: 4 ft [1] Tides & Solunars |
20 ft | 27° 53' 25" N | 82° 51' 14" W |
Sand Key Nourishment Reef - #7 |
3630 Diameter Culverts At Site Imr#1 Date of Deployment: October 21 2004 Primary Material: CONCRETE CULVERTS (13) Tonnage: 16.4 County: PINELLAS Depth: 18 ft Relief: 5 ft [1] Tides & Solunars |
18 ft | 27° 53' 25" N | 82° 51' 14" W |
Sand Key Nourishment Reef - #8 |
3630 2418 And 15 Diameter Culverts At Site Imr#1 Date of Deployment: August 31 2004 Primary Material: CONCRETE CULVERTS (27) Tonnage: 23.36 County: PINELLAS Depth: 18 ft Relief: 5 ft [1] Tides & Solunars |
18 ft | 27° 53' 24" N | 82° 51' 15" W |
Sand Key Nourishment Reef - #9 |
2418 And 15 Diameter Culverts At Site Imr#1 Date of Deployment: August 30 2004 Primary Material: CONCRETE CULVERTS (40) Tonnage: 24.8 County: PINELLAS Depth: 18 ft Relief: 4 ft [1] Tides & Solunars |
18 ft | 27° 53' 24" N | 82° 51' 15" W |
Shrimp Boat Reef |
Steel Hulled Shrimpboat And Concrete Sinkers 80 X 25 X 29 Tall Date of Deployment: December 8 2004 Primary Material: SHIP STEEL SHRIMPBOAT 80’ County: PINELLAS Depth: 97 ft Relief: 39 ft [1] Tides & Solunars |
97 ft | 27° 41' 45" N | 83° 17' 33" W |
Southeast Tampa 04-12 |
Bay Mini.Lo-Pro And Table Top Balls Date of Deployment: February 6 2004 Primary Material: MODULES CONCRETE REEFBALLS(81) Tonnage: 32.9 County: MANATEE Depth: 14 ft Relief: 3 ft [1] Tides & Solunars |
14 ft | 27° 32' 55" N | 82° 40' 17" W |
St. Pete Beach Site |
3 Loads From 3/7/83 To 4/6/83 Three Other Sites Same Grant Date of Deployment: April 6 1983 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 40' 36" N | 82° 51' 45" W | |
St. Pete Beach Site |
Pinellas Tank #10 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 37" N | 82° 51' 48" W |
St. Pete Beach Site |
Pinellas Tank #6 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 41" N | 82° 51' 49" W |
St. Pete Beach Site |
Pinellas Tank #5 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 41" N | 82° 51' 49" W |
St. Pete Beach Site |
Pinellas Tank #9 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 43" N | 82° 51' 50" W |
St. Pete Beach Site |
Pinellas Tank #4 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 43" N | 82° 51' 50" W |
St. Pete Beach Site |
Pinellas Tank #7 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 43" N | 82° 51' 49" W |
St. Pete Beach Site |
Pinellas Tank #3 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 43" N | 82° 51' 50" W |
St. Pete Beach Site |
Pinellas Tank #8 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 43" N | 82° 51' 49" W |
St. Pete Beach Site |
Pinellas Tank #2 Date of Deployment: April 22 1995 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: PINELLAS Depth: 25 ft [1] Tides & Solunars |
25 ft | 27° 40' 44" N | 82° 51' 50" W |
St. Petersburg Bay Reef |
Portions Of Gandy Bridge Boat Hulls And Concrete Debris Date of Deployment: December 31 1995 Primary Material: BRIDGE RUBBLE County: PINELLAS Depth: 34 ft Relief: 14 ft [1] Tides & Solunars |
34 ft | 27° 47' 8" N | 82° 35' 52" W |
Tarpon Key Oyster Reef - Site 1 |
980 Bags Of Fossilized Locally Mined Shell Near Shore ~ 255 Ft 2/19/05 Date of Deployment: February 18 2005 Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS County: PINELLAS Depth: 1 ft Relief: 2 ft [1] Tides & Solunars |
1 ft | 27° 39' 56" N | 82° 41' 43" W |
Tarpon Key Oyster Reef - Site 2 |
535 Bags Of Fossilized Locally Mined Shell Near Shore ~ 275 Ft 3/5/05 Date of Deployment: March 5 2005 Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS County: PINELLAS Depth: 1 ft Relief: 2 ft [1] Tides & Solunars |
1 ft | 27° 40' 4" N | 82° 41' 24" W |
Tarpon Key Oyster Reef - Site 3 |
535 Bags Of Fossilized Locally Mined Shell Near Shore ~ 275 Ft 3/5/05 Date of Deployment: March 4 2005 Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS County: PINELLAS Depth: 1 ft Relief: 2 ft [1] Tides & Solunars |
1 ft | 27° 40' 4" N | 82° 41' 24" W |
Tarpon Springs Reef - Site 1 |
Fiberglass Boat Molds 350 Sq. Feet Coverage Date of Deployment: December 14 1982 Primary Material: FIBERGLASS BOAT MOLDS County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 8' 7" N | 82° 55' 57" W |
Tarpon Springs Reef - Site 10 |
7Th Of 8 Loads This Grant And This Site Date of Deployment: July 1 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 15" N | 82° 55' 45" W |
Tarpon Springs Reef - Site 11 |
2Nd Of 8 Loads This Grant And This Site Date of Deployment: June 3 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 8" N | 82° 55' 52" W |
Tarpon Springs Reef - Site 2 |
Fiberglass Boat Molds 350 Sq. Feet Coverage Date of Deployment: December 9 1982 Primary Material: FIBERGLASS BOAT MOLDS County: PINELLAS Depth: 28 ft [1] Tides & Solunars |
28 ft | 28° 8' 11" N | 82° 55' 48" W |
Tarpon Springs Reef - Site 3 |
1Rst Of 8 Loads This Grant And This Site Date of Deployment: April 24 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 31" N | 82° 56' 7" W |
Tarpon Springs Reef - Site 4 |
Concrete Culverts And Pyramids Date of Deployment: December 31 1987 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 15" N | 82° 55' 49" W |
Tarpon Springs Reef - Site 5 |
8Th Of 8 Loads This Grant And This Site Date of Deployment: July 8 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 14" N | 82° 55' 45" W |
Tarpon Springs Reef - Site 6 |
6Th Of 8 Loads This Grant And This Site Date of Deployment: June 24 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 12" N | 82° 55' 46" W |
Tarpon Springs Reef - Site 8 |
4Th Of 8 Loads This Grant And This Site Date of Deployment: June 10 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 15" N | 82° 55' 44" W |
Tarpon Springs Reef - Site 9 |
3Rd Of 8 Loads This Grant And This Site Date of Deployment: June 6 1985 Primary Material: CONCRETE SINKERS County: PINELLAS Depth: 26 ft [1] Tides & Solunars |
26 ft | 28° 8' 12" N | 82° 55' 46" W |
The Bulkhead Reef04-12 |
Bay Mini.Lo-Pro And Table Top Balls Date of Deployment: February 6 2004 Primary Material: MODULES CONCRETE REEFBALLS(85) Tonnage: 33.86 County: MANATEE Depth: 15 ft Relief: 3 ft [1] Tides & Solunars |
15 ft | 27° 33' 12" N | 82° 42' 22" W |
Treasure Island Reef - #1 |
New Area Will Monitor Progress 1Rst Of 3 Loads This Site Date of Deployment: May 6 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 45' 8" N | 82° 53' 14" W | |
Treasure Island Reef - #2 |
New Area Will Monitor Progress 2Nd Of 3 Loads This Site Date of Deployment: June 5 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS [1] Tides & Solunars |
27° 46' 35" N | 82° 54' 46" W | |
Treasure Island Reef - #3 |
New Area Will Monitor Progress 3Rd Of 3 Loads This Site Date of Deployment: June 17 1985 Primary Material: CONCRETE CULVERTS County: PINELLAS Depth: 29 ft [1] Tides & Solunars |
29 ft | 27° 45' 10" N | 82° 53' 14" W |
Veterans Reef - Reef Center |
Steel Barge Upright 14 Feet East Of 8-2-99 Barge Date of Deployment: August 4 1999 Primary Material: BARGE STEEL County: PINELLAS Depth: 42 ft Relief: 7 ft [1] Tides & Solunars |
42 ft | 28° 2' 59" N | 83° 0' 44" W |
Veterans Reef - Site 1 |
1 Large 1 Small Steel Cargo Boxes With 4 Pieces 24 X 4’ Culvert Date of Deployment: January 17 2000 Primary Material: STEEL CONTAINERS Tonnage: 8 County: PINELLAS Depth: 44 ft Relief: 8 ft [1] Tides & Solunars |
44 ft | 28° 2' 38" N | 83° 0' 45" W |
Veterans Reef - Site 10 |
27Pieces Concrete Manholes Various Sizes Date of Deployment: September 10 2003 Primary Material: CONCRETE MANHOLES (27) Tonnage: 23.5 County: PINELLAS Depth: 44 ft Relief: 5 ft [1] Tides & Solunars |
44 ft | 28° 2' 55" N | 83° 0' 49" W |
Veterans Reef - Site 11 |
28 Pieces Culverts Various Sizes Date of Deployment: September 9 2003 Primary Material: CONCRETE CULVERTS (28) Tonnage: 32 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 50" W |
Veterans Reef - Site 12 |
16 Pieces Of Concrete Pilings Various Sizes Date of Deployment: February 11 2004 Primary Material: CONCRETE PILINGS (16) Tonnage: 21.2 County: PINELLAS Depth: 43 ft Relief: 7 ft [1] Tides & Solunars |
43 ft | 28° 2' 55" N | 83° 0' 48" W |
Veterans Reef - Site 13 |
18 Pieces Concrete Cutoffs Various Sizes Date of Deployment: September 22 2003 Primary Material: CONCRETE CUTOFFS (18) Tonnage: 29 County: PINELLAS Depth: 44 ft Relief: 5 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 49" W |
Veterans Reef - Site 14 |
29 Pieces Culverts Various Sizes Date of Deployment: November 24 2003 Primary Material: CONCRETE CULVERTS (29) Tonnage: 26.12 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 49" W |
Veterans Reef - Site 15 |
25 Pieces Concrete Culverts And 8 Slabs Various Sizes Date of Deployment: November 5 2003 Primary Material: CONCRETE CULVERTS (25) Tonnage: 30.7 County: PINELLAS Depth: 44 ft Relief: 7 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 50" W |
Veterans Reef - Site 16 |
22 Pieces Concrete Slabs Various Sizes Date of Deployment: October 27 2003 Primary Material: CONCRETE SLABS (22) Tonnage: 29.4 County: PINELLAS Depth: 44 ft Relief: 7 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 49" W |
Veterans Reef - Site 17 |
34 Pieces Concrete Culverts Various Sizes Date of Deployment: October 21 2003 Primary Material: CONCRETE CULVERTS (34) Tonnage: 32.7 County: PINELLAS Depth: 44 ft Relief: 7 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 50" W |
Veterans Reef - Site 18 |
41 Pieces Concrete Culverts Various Sizes Date of Deployment: October 14 2003 Primary Material: CONCRETE CUTOFFS (41) Tonnage: 33.6 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 49" W |
Veterans Reef - Site 19 |
17 Pieces Concrete Boxes Date of Deployment: May 5 2004 Primary Material: CONCRETE BOXES (17) Tonnage: 24 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 51" W |
Veterans Reef - Site 2 |
2 Steel Cargo Boxes (Roll-Off Containers) Date of Deployment: January 26 2000 Primary Material: STEEL CONTAINERS Tonnage: 8 County: PINELLAS Depth: 44 ft Relief: 8 ft [1] Tides & Solunars |
44 ft | 28° 2' 38" N | 83° 0' 45" W |
Veterans Reef - Site 20 |
29 Pieces Concrete Culverts Various Sizes Concrete Cut Offs Date of Deployment: June 10 2004 Primary Material: CONCRETE CULVERTS (29) Tonnage: 25 County: PINELLAS Depth: 45 ft Relief: 6 ft [1] Tides & Solunars |
45 ft | 28° 2' 55" N | 83° 0' 50" W |
Veterans Reef - Site 21 |
25 Pieces Concrete Culverts Various Sizes Concrete Slabs Date of Deployment: June 9 2004 Primary Material: CONCRETE CULVERTS (25) Tonnage: 33 County: PINELLAS Depth: 42 ft Relief: 8 ft [1] Tides & Solunars |
42 ft | 28° 2' 57" N | 83° 0' 50" W |
Veterans Reef - Site 22 |
28 Pieces Concrete Culverts Various Sizes Date of Deployment: June 3 2004 Primary Material: CONCRETE CULVERTS (28) Tonnage: 22 County: PINELLAS Depth: 45 ft Relief: 8 ft [1] Tides & Solunars |
45 ft | 28° 2' 57" N | 83° 0' 49" W |
Veterans Reef - Site 23 |
17 Pieces Culverts Various Sizes Date of Deployment: May 10 2004 Primary Material: CONCRETE CULVERTS (11) Tonnage: 23.2 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 55" N | 83° 0' 50" W |
Veterans Reef - Site 24 |
8 Pieces Concrete Cutoffs And Slabs Date of Deployment: April 23 2004 Primary Material: CONCRETE PILINGS (8) Tonnage: 31.95 County: PINELLAS Depth: 44 ft Relief: 7 ft [1] Tides & Solunars |
44 ft | 28° 1' 60" N | 83° 0' 0" W |
Veterans Reef - Site 25 |
14 Pieces Of Concrete Pilings And 2 Junction Boxes Date of Deployment: April 20 2004 Primary Material: CONCRETE PILINGS (14) Tonnage: 26.3 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 49" W |
Veterans Reef - Site 26 |
32 Pieces Of Concrete Pilings Various Sizes Date of Deployment: April 19 2004 Primary Material: CONCRETE PILINGS (32) Tonnage: 35.5 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 55" N | 83° 0' 49" W |
Veterans Reef - Site 27 |
29 Pieces Culverts Various Sizes Date of Deployment: April 8 2004 Primary Material: CONCRETE CULVERTS (29) Tonnage: 22 County: PINELLAS Depth: 44 ft Relief: 9 ft [1] Tides & Solunars |
44 ft | 28° 2' 55" N | 83° 0' 48" W |
Veterans Reef - Site 28 |
14 Pieces Culverts Various Sizes And 8 Concrete Slabs Date of Deployment: May 11 2004 Primary Material: CONCRETE CULVERTS (14) Tonnage: 28 County: PINELLAS Depth: 42 ft Relief: 6 ft [1] Tides & Solunars |
42 ft | 28° 2' 57" N | 83° 0' 50" W |
Veterans Reef - Site 29 |
17 Poles And 2 Boxes Date of Deployment: August 18 2000 Primary Material: CONCRETE POWER POLES Tonnage: 21.5 County: PINELLAS Depth: 44 ft Relief: 5 ft [1] Tides & Solunars |
44 ft | 28° 2' 52" N | 83° 0' 43" W |
Veterans Reef - Site 3 |
2 Cargo Boxes 7.5’ H X 22’L X 8’ W Date of Deployment: January 29 2001 Primary Material: STEEL CONTAINERS Tonnage: 8 County: PINELLAS Depth: 44 ft Relief: 8 ft [1] Tides & Solunars |
44 ft | 28° 2' 40" N | 83° 0' 44" W |
Veterans Reef - Site 30 |
4 Large Pieces Of Culverts Date of Deployment: September 11 2000 Primary Material: CONCRETE CULVERT Tonnage: 29 County: PINELLAS Depth: 44 ft Relief: 5 ft [1] Tides & Solunars |
44 ft | 28° 3' 2" N | 83° 0' 44" W |
Veterans Reef - Site 31 |
Various Sizes Of Culverts Date of Deployment: September 12 2000 Primary Material: CONCRETE CULVERT Tonnage: 35.5 County: PINELLAS Depth: 44 ft Relief: 11 ft [1] Tides & Solunars |
44 ft | 28° 3' 1" N | 83° 0' 44" W |
Veterans Reef - Site 32 |
18 Pieces Of Oval Culverts 18 X 36 And 12 X 18 Date of Deployment: September 21 2000 Primary Material: CONCRETE CULVERT Tonnage: 22 County: PINELLAS Depth: 44 ft Relief: 12 ft [1] Tides & Solunars |
44 ft | 28° 3' 2" N | 83° 0' 45" W |
Veterans Reef - Site 33 |
20 Pieces Of Culvert On Top Of Single Aircraft Wing Date of Deployment: October 5 2000 Primary Material: CONCRETE CULVERT Tonnage: 19 County: PINELLAS Depth: 44 ft Relief: 10 ft [1] Tides & Solunars |
44 ft | 28° 2' 52" N | 83° 0' 45" W |
Veterans Reef - Site 4 |
2 Small Steel Cargo Boxes And 2 Rubble Boxes Date of Deployment: November 16 2000 Primary Material: STEEL CONTAINERS Tonnage: 15 County: PINELLAS Depth: 44 ft Relief: 8 ft [1] Tides & Solunars |
44 ft | 28° 2' 39" N | 83° 0' 44" W |
Veterans Reef - Site 5 |
Steel Hulled Lash Barge And Misc Concrete Date of Deployment: November 30 2004 Primary Material: BARGE STEEL 60’ Tonnage: 7.5 County: PINELLAS Depth: 40 ft Relief: 14 ft [1] Tides & Solunars |
40 ft | 28° 2' 58" N | 83° 0' 51" W |
Veterans Reef - Site 6 |
180’ X 30’ X 10’ Barge With P2v-3 Bomber Cabled To It Date of Deployment: July 2 2000 Primary Material: BARGE Tonnage: 270 County: PINELLAS Depth: 44 ft [1] Tides & Solunars |
44 ft | 28° 2' 51" N | 83° 0' 43" W |
Veterans Reef - Site 7 |
16Pieces Concrete Manholes Various Sizes Date of Deployment: September 16 2003 Primary Material: CONCRETE MANHOLES (16) Tonnage: 20.3 County: PINELLAS Depth: 43 ft Relief: 8 ft [1] Tides & Solunars |
43 ft | 28° 2' 56" N | 83° 0' 50" W |
Veterans Reef - Site 8 |
31 Pieces Concrete Cutoffs Various Sizes Date of Deployment: September 15 2003 Primary Material: CONCRETE CUTOFFS (31) Tonnage: 25 County: PINELLAS Depth: 44 ft Relief: 4 ft [1] Tides & Solunars |
44 ft | 28° 2' 56" N | 83° 0' 50" W |
Veterans Reef - Site 9 |
14 Pieces Concrete Manholes Various Sizes Date of Deployment: September 12 2003 Primary Material: CONCRETE MANHOLES (14) Tonnage: 25 County: PINELLAS Depth: 44 ft Relief: 6 ft [1] Tides & Solunars |
44 ft | 28° 2' 54" N | 83° 0' 49" W |
Whiskey Stump Key |
Oyster Reef Covering 250’ L X 5’ ’W X 1.3’ H Of Shoreline Date of Deployment: April 23 2005 Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS Tonnage: 23 County: HILLSBOROUGH Depth: 3 ft Relief: 1 ft [1] Tides & Solunars |
3 ft | 27° 48' 53" N | 82° 24' 7" W |