Tampa Bay
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
1 Mile Reef - Site 01-01 1000 Tons Of Concrete Culverts Bridge Spans
Date of Deployment: November 12 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 1000
County: MANATEE
Depth: 27 ft

Relief: 10 ft [1]
Tides & Solunars
27 ft 27° 29' 30" N 82° 43' 60" W
1 Mile Reef - Site 01-02 Skyway Bridge Materials And Metal Pipes
Date of Deployment: December 31 1976
Primary Material: BRIDGE MATERIAL
Tonnage: 1000
County: MANATEE
Depth: 21 ft
[1]
Tides & Solunars
21 ft 27° 29' 4" N 82° 44' 7" W
1 Mile Reef - Site 03-1 44 Reefballs 6 Of 7 Drops This Grant
Date of Deployment: July 2 2003
Primary Material: MODULES CONCRETE REEFBALLS(44)
County: MANATEE
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 27° 29' 26" N 82° 44' 9" W
1 Mile Reef - Site 03-2 44 Reefballs 7 Of 7 Drops This Grant
Date of Deployment: July 2 2003
Primary Material: MODULES CONCRETE REEFBALLS(44)
County: MANATEE
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 27° 29' 24" N 82° 44' 7" W
1 Mile Reef - Site 03-3 19 Reefballs 5 Of 7 Drops This Grant
Date of Deployment: July 2 2003
Primary Material: MODULES CONCRETE REEFBALLS(19)
County: MANATEE
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 27° 29' 25" N 82° 44' 5" W
1 Mile Reef - Site 05-01 1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 1 Of 7 Drops This Gran
Date of Deployment: June 27 2005
Primary Material: MODULES CONCRETE REEFBALLS(48)
Tonnage: 28.3
County: MANATEE
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 27° 29' 20" N 82° 44' 10" W
1 Mile Reef - Site 05-2 1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 2 Of 7 Drops This Gran
Date of Deployment: June 27 2005
Primary Material: MODULES CONCRETE REEFBALLS(48)
Tonnage: 28.3
County: MANATEE
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 27° 29' 19" N 82° 44' 9" W
1 Mile Reef - Site 05-3 1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 3 Of 7 Drops This Gran
Date of Deployment: June 27 2005
Primary Material: MODULES CONCRETE REEFBALLS(48)
Tonnage: 28.3
County: MANATEE
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 27° 29' 19" N 82° 44' 5" W
1 Mile Reef - Site 05-4 1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 4 Of 7 Drops This Gran
Date of Deployment: June 27 2005
Primary Material: MODULES CONCRETE REEFBALLS(48)
Tonnage: 28.3
County: MANATEE
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 27° 29' 19" N 82° 44' 3" W
1 Mile Reef - Site 05-5 1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 5 Of 7 Drops This Gran
Date of Deployment: June 27 2005
Primary Material: MODULES CONCRETE REEFBALLS(48)
Tonnage: 28.3
County: MANATEE
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 27° 29' 19" N 82° 44' 1" W
1 Mile Reef - Site 05-6 1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 6 Of 7 Drops This Gran
Date of Deployment: June 27 2005
Primary Material: MODULES CONCRETE REEFBALLS(48)
Tonnage: 28.3
County: MANATEE
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 27° 29' 20" N 82° 43' 60" W
1 Mile Reef - Site 05-7 1-Goliath 7 Ultras 13 Pallets And 27 Bay Balls 7 Of 7 Drops This Gran
Date of Deployment: June 27 2005
Primary Material: MODULES CONCRETE REEFBALLS(48)
Tonnage: 28.3
County: MANATEE
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 27° 29' 22" N 82° 44' 5" W
1 Mile Reef - Site 3-10 45 Reefballs 2 Of 7 Drops This Grant
Date of Deployment: June 26 2003
Primary Material: MODULES CONCRETE REEFBALLS(45)
County: MANATEE
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 27° 29' 23" N 82° 44' 5" W
1 Mile Reef - Site 3-12 44 Reefballs 3 Of 7 Drops This Grant
Date of Deployment: June 26 2003
Primary Material: MODULES CONCRETE REEFBALLS(44)
County: MANATEE
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 27° 29' 23" N 82° 44' 2" W
1 Mile Reef - Site 3-13 44 Reefballs 4 Of 7 Drops This Grant
Date of Deployment: June 26 2003
Primary Material: MODULES CONCRETE REEFBALLS(44)
County: MANATEE
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 27° 29' 26" N 82° 43' 60" W
1 Mile Reef - Site 3-8 45 Reefballs 1 Of 7 Drops This Grant
Date of Deployment: June 26 2003
Primary Material: MODULES CONCRETE REEFBALLS(45)
County: MANATEE
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 27° 29' 24" N 82° 44' 7" W
3 Mile Reef - North Tires Concrete Rubble And Tiles
Date of Deployment: December 31 1976
Primary Material: TIRES
County: MANATEE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 27° 29' 34" N 82° 46' 60" W
3 Mile Reef - North (B Reef) 1100 Cubic Yards Of Boat Molds-Concrete Rubble-And Solid Rubber Tires.
Date of Deployment: March 20 1987
Primary Material: FIBERGLASS BOAT MOLDS
County: MANATEE
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 29' 58" N 82° 47' 2" W
7 Mile Reef North - North Tires Concrete Rubble
Date of Deployment: December 31 1976
Primary Material: TIRES
County: MANATEE
Depth: 40 ft
[1]
Tides & Solunars
40 ft 27° 32' 13" N 82° 52' 42" W
Bahia Beach Reef (Bay) - Site 1 463 Tons Of Concrete Forms-Rubble And Stainless Steel Mixers.
Date of Deployment: May 17 1989
Primary Material: MODULES CONCRETE PYRAMIDS
Tonnage: 463
County: HILLSBOROUGH
Depth: 20 ft
[1]
Tides & Solunars
20 ft 27° 44' 56" N 82° 30' 59" W
Bahia Beach Reef (Bay) - Site 10 Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier
Date of Deployment: August 29 2001
Primary Material: BRIDGE SPANS
Tonnage: 345.8
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 50" N 82° 30' 53" W
Bahia Beach Reef (Bay) - Site 11 Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier
Date of Deployment: November 2 2001
Primary Material: BRIDGE SPANS
Tonnage: 217.62
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 56" N 82° 30' 58" W
Bahia Beach Reef (Bay) - Site 12 Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier
Date of Deployment: January 31 2002
Primary Material: BRIDGE SPANS
Tonnage: 454.46
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 56" N 82° 30' 55" W
Bahia Beach Reef (Bay) - Site 13 Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier
Date of Deployment: April 24 2002
Primary Material: BRIDGE SPANS
Tonnage: 465.88
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 49" N 82° 30' 57" W
Bahia Beach Reef (Bay) - Site 14 Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier
Date of Deployment: May 16 2002
Primary Material: BRIDGE SPANS
Tonnage: 386.9
County: HILLSBOROUGH [1]
Tides & Solunars
27° 44' 51" N 82° 30' 56" W
Bahia Beach Reef (Bay) - Site 15 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: February 2 2006
Primary Material: BRIDGE RUBBLE
Tonnage: 180.04
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 56" N 82° 30' 56" W
Bahia Beach Reef (Bay) - Site 16 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: February 15 2006
Primary Material: BRIDGE RUBBLE
Tonnage: 215.81
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 54" N 82° 30' 58" W
Bahia Beach Reef (Bay) - Site 17 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: February 24 2006
Primary Material: BRIDGE RUBBLE
Tonnage: 54.26
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 58" N 82° 30' 55" W
Bahia Beach Reef (Bay) - Site 18 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: March 7 2006
Primary Material: BRIDGE RUBBLE
Tonnage: 210.87
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 56" N 82° 30' 54" W
Bahia Beach Reef (Bay) - Site 19 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: April 4 2006
Primary Material: BRIDGE RUBBLE
Tonnage: 64.13
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 57" N 82° 30' 54" W
Bahia Beach Reef (Bay) - Site 2 Concrete Bridge And Pile Caps
Date of Deployment: December 8 1999
Primary Material: BRIDGE SLABS CONCRETE
Tonnage: 90.5
County: HILLSBOROUGH
Depth: 24 ft

Relief: 6 ft [1]
Tides & Solunars
24 ft 27° 44' 55" N 82° 30' 53" W
Bahia Beach Reef (Bay) - Site 20 Concrete Rubble-Concrete Slab-And Clay Water Pipes.
Date of Deployment: June 29 1993
Primary Material: CONCRETE RUBBLE
Tonnage: 703
County: HILLSBOROUGH
Depth: 21 ft
[1]
Tides & Solunars
21 ft 27° 44' 53" N 82° 30' 58" W
Bahia Beach Reef (Bay) - Site 3 Concrete Bridge Decking Railings And Rubble From Treasure Island Center
Date of Deployment: March 10 2005
Primary Material: BRIDGE PILINGS
Tonnage: 286.39
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 49" N 82° 30' 55" W
Bahia Beach Reef (Bay) - Site 4 Concrete Bridge Decking Railings And Rubble From Treasure Island Center
Date of Deployment: March 25 2005
Primary Material: BRIDGE PILINGS
Tonnage: 351.89
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 49" N 82° 30' 53" W
Bahia Beach Reef (Bay) - Site 5 Concrete Bridge Decking Railings And Rubble From Treasure Island Center
Date of Deployment: April 7 2005
Primary Material: BRIDGE PILINGS
Tonnage: 263.54
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 49" N 82° 30' 53" W
Bahia Beach Reef (Bay) - Site 6 Concrete Bridge Decking Railings And Rubble From Treasure Island Center
Date of Deployment: April 13 2005
Primary Material: BRIDGE PILINGS
Tonnage: 254.4
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 48" N 82° 30' 53" W
Bahia Beach Reef (Bay) - Site 7 Concrete Bridge Decking Railings And Rubble From Treasure Island Center
Date of Deployment: June 22 2005
Primary Material: BRIDGE PILINGS
Tonnage: 423.54
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 56" N 82° 30' 57" W
Bahia Beach Reef (Bay) - Site 8 Concrete Bridge Decking Railings And Rubble From Treasure Island Center
Date of Deployment: March 4 2005
Primary Material: BRIDGE PILINGS
Tonnage: 559.07
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 51" N 82° 30' 55" W
Bahia Beach Reef (Bay) - Site 9 Concrete Bridge Decking Railings And Rubble From Treasure Island Center
Date of Deployment: February 24 2005
Primary Material: BRIDGE PILINGS
Tonnage: 524.03
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 44' 53" N 82° 30' 53" W
Ballast Point Pier (Bay) Modules Of Concrete Pilings Slabs And Culverts Around Pier
Date of Deployment: December 31 1987
Primary Material: CONCRETE PILINGS
County: HILLSBOROUGH
Depth: 8 ft

Relief: 5 ft [1]
Tides & Solunars
8 ft 27° 53' 16" N 82° 28' 45" W
Chamberlain High School (Bay) Annual Deployment On The Chamberlain High School Reef
Date of Deployment: October 10 1996
Primary Material: CONCRETE BLOCKS (75)
Tonnage: 0.3
County: HILLSBOROUGH
Depth: 19 ft
[1]
Tides & Solunars
19 ft 27° 51' 39" N 82° 33' 48" W
Chief Reef (Bay) 50 Concrete Blocks 500 Lbs. By Chamberlain H.S.
Date of Deployment: September 11 1997
Primary Material: CONCRETE BLOCKS (50)
County: HILLSBOROUGH
Depth: 24 ft

Relief: 12 ft [1]
Tides & Solunars
24 ft 27° 51' 38" N 82° 33' 47" W
Clearwater C Site Area Covered 29’ X 45’ 13 Pieces
Date of Deployment: April 13 1999
Primary Material: CONCRETE VAULTS
Tonnage: 24
County: PINELLAS
Depth: 31 ft
[1]
Tides & Solunars
31 ft 28° 0' 51" N 82° 53' 32" W
Clearwater C Site Area Covered 29’ X 45’ 9 Pieces
Date of Deployment: April 12 1999
Primary Material: CONCRETE OVALS
Tonnage: 28
County: PINELLAS
Depth: 31 ft
[1]
Tides & Solunars
31 ft 28° 0' 51" N 82° 53' 32" W
Clearwater C Site 46 Pieces Of Culverts And Boxes
Date of Deployment: March 17 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 76
County: PINELLAS
Depth: 31 ft

Relief: 13 ft [1]
Tides & Solunars
31 ft 28° 0' 51" N 82° 53' 32" W
Clearwater C Site 30 Pieces Of Concrete 18 To 24 Inch Ovals
Date of Deployment: July 26 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 27
County: PINELLAS
Depth: 30 ft

Relief: 8 ft [1]
Tides & Solunars
30 ft 28° 0' 51" N 82° 53' 35" W
Clearwater C Site 17 Pieces Of Concrete 18 To 36 Inches
Date of Deployment: July 30 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 28
County: PINELLAS
Depth: 30 ft

Relief: 14 ft [1]
Tides & Solunars
30 ft 28° 0' 51" N 82° 53' 35" W
Clearwater C Site 29X45 Ovals Stuffed With 18&15 Culverts 17 Pieces
Date of Deployment: May 20 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 40
County: PINELLAS
Depth: 32 ft

Relief: 11 ft [1]
Tides & Solunars
32 ft 28° 0' 51" N 82° 53' 35" W
Clearwater C Site 25 Pieces Of Concrete 12 To 52 Inch Sizes
Date of Deployment: July 7 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 31
County: PINELLAS
Depth: 30 ft

Relief: 12 ft [1]
Tides & Solunars
30 ft 28° 0' 51" N 82° 53' 34" W
Clearwater C Site 29X45 Ovals Stuffed With 18&15 Culverts 30 Pieces
Date of Deployment: May 14 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 34
County: PINELLAS
Depth: 30 ft
[1]
Tides & Solunars
30 ft 28° 0' 51" N 82° 53' 34" W
Clearwater C Site 14 Concrete Culverts From 15 To 54
Date of Deployment: May 18 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 32
County: PINELLAS
Depth: 32 ft

Relief: 13 ft [1]
Tides & Solunars
32 ft 28° 0' 52" N 82° 53' 34" W
Clearwater C Site 54 And 48 Culverts
Date of Deployment: June 29 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 38
County: PINELLAS
Depth: 33 ft

Relief: 13 ft [1]
Tides & Solunars
33 ft 28° 0' 52" N 82° 53' 34" W
Clearwater C Site Area Covered 29’ X 45’ 13 Pieces
Date of Deployment: April 19 1999
Primary Material: CONCRETE OVALS (9)
Tonnage: 28
County: PINELLAS
Depth: 32 ft

Relief: 15 ft [1]
Tides & Solunars
32 ft 28° 0' 52" N 82° 53' 34" W
Clearwater C Site Area Covered 29’ X 45’ 11 Pieces
Date of Deployment: April 14 1999
Primary Material: CONCRETE OVALS (11)
Tonnage: 33
County: PINELLAS
Depth: 32 ft

Relief: 15 ft [1]
Tides & Solunars
32 ft 28° 0' 52" N 82° 53' 34" W
Clearwater Reef 33 X 12 X 3 Fiberglass Boat Mold 20 Sq. Feet Coverage
Date of Deployment: June 1 1983
Primary Material: FIBERGLASS BOAT MOLD (1)
County: PINELLAS
Depth: 29 ft
[1]
Tides & Solunars
29 ft 27° 56' 24" N 82° 47' 56" W
Clearwater Reef Concrete Culverts 496 Sq. Feet Coverage
Date of Deployment: August 25 1982
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 27 ft
[1]
Tides & Solunars
27 ft 28° 0' 37" N 82° 53' 40" W
Clearwater Reef 37 X 18 X 8 Fiberglass Boat Mold 15 Sq. Feet Coverage
Date of Deployment: June 1 1983
Primary Material: FIBERGLASS BOAT MOLD (1)
County: PINELLAS
Depth: 29 ft
[1]
Tides & Solunars
29 ft 28° 0' 49" N 82° 53' 49" W
Clearwater Reef 27 Tons Of Concrete Cutoff Poles
Date of Deployment: January 26 1998
Primary Material: CONCRETE PILINGS
Tonnage: 27
County: PINELLAS
Depth: 32 ft
[1]
Tides & Solunars
32 ft 28° 0' 51" N 82° 53' 31" W
Clearwater Reef Concrete Sinkers Near Sw Buoy 50 Sq. Feet Coverage
Date of Deployment: December 7 1982
Primary Material: CONCRETE SINKERS
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 0' 52" N 82° 53' 43" W
Clearwater Reef Concrete Rubble 496 Sq. Feet Coverage
Date of Deployment: August 19 1982
Primary Material: CONCRETE RUBBLE
County: PINELLAS
Depth: 29 ft
[1]
Tides & Solunars
29 ft 28° 0' 55" N 82° 53' 21" W
Clearwater Reef Concrete Culverts 1500 Sq. Feet Coverage
Date of Deployment: September 16 1982
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 30 ft
[1]
Tides & Solunars
30 ft 28° 0' 57" N 82° 53' 42" W
Clearwater Reef Concrete Pyramids Airplane Concrete Rubble And Barge
Date of Deployment: December 31 1974
Primary Material: CONCRETE RUBBLE
County: PINELLAS
Depth: 27 ft

Relief: 13 ft [1]
Tides & Solunars
27 ft 28° 0' 57" N 82° 53' 42" W
Clearwater Reef Cement Cut Offs And 10 Foot Diameter Steel Pipes 60 Sq. Feet Coverage
Date of Deployment: December 16 1982
Primary Material: CONCRETE CUT OFFS
County: PINELLAS
Depth: 29 ft
[1]
Tides & Solunars
29 ft 28° 1' 34" N 82° 52' 55" W
Clearwater Reef Site C 71 Pieces Culverts Various Sizes
Date of Deployment: February 18 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 79
County: PINELLAS
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 28° 0' 51" N 82° 53' 31" W
Clearwater Reef Site M 56 Pieces Culverts Various Sizes
Date of Deployment: November 24 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 39
County: PINELLAS
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 28° 0' 50" N 82° 53' 32" W
Clearwater Reef Site M 38 Pieces Culverts Various Sizes
Date of Deployment: December 2 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 38
County: PINELLAS
Depth: 31 ft

Relief: 12 ft [1]
Tides & Solunars
31 ft 28° 0' 50" N 82° 53' 31" W
Clearwater Reef Site M 26 Pieces Culverts Various Sizes
Date of Deployment: November 25 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 39
County: PINELLAS
Depth: 30 ft

Relief: 14 ft [1]
Tides & Solunars
30 ft 28° 0' 51" N 82° 53' 31" W
Courtney Campbell Site (Bay) 400 X 200 Yards. Of Concrete Pilings
Date of Deployment: December 31 1991
Primary Material: CONCRETE PILINGS
County: HILLSBOROUGH
Depth: 16 ft

Relief: 8 ft [1]
Tides & Solunars
16 ft 27° 57' 45" N 82° 36' 52" W
Dunedin 1Rst Of 5 Loads This Grant And This Site
Date of Deployment: May 1 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 57' 54" N 82° 54' 32" W
Dunedin 5Th Of 5 Loads This Grant This Site
Date of Deployment: June 20 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 28° 3' 16" N 82° 54' 30" W
Dunedin 2Nd Of 5 Loads This Grant And This Site 3 Piles About 20 Feet Apart
Date of Deployment: May 7 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 28° 3' 20" N 82° 54' 32" W
Dunedin 3Rd Of 5 Loads This Grant And This Site
Date of Deployment: May 16 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 25 ft

Relief: 10 ft [1]
Tides & Solunars
25 ft 28° 3' 23" N 82° 54' 27" W
Dunedin 4Th Of 5 Loads This Grant This Site
Date of Deployment: May 28 1985
Primary Material: FIBERGLASS BOAT MOLDS
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 28° 3' 26" N 82° 54' 36" W
Dunedin 28 Pieces Of Culverts
Date of Deployment: December 24 1997
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 24
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 29" N 82° 54' 57" W
Dunedin 12 Pieces Of Large Oval Culverts
Date of Deployment: October 1 1997
Primary Material: CONCRETE CULVERTS (12)
Tonnage: 25
County: PINELLAS
Depth: 28 ft

Relief: 13 ft [1]
Tides & Solunars
28 ft 28° 3' 29" N 82° 54' 57" W
Dunedin 23 Pieces Of Concrete Culverts
Date of Deployment: December 23 1997
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 33
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 29" N 82° 54' 57" W
Dunedin 18 Pieces Of Boxes And Assorted Concrete
Date of Deployment: January 5 1998
Primary Material: CONCRETE BOXES (18)
Tonnage: 22
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 29" N 82° 54' 57" W
Dunedin 29 Pieces Of Concrete Culverts
Date of Deployment: December 24 1997
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 24
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 29" N 82° 54' 57" W
Dunedin - J Site 14 Culverts And Boxes
Date of Deployment: October 30 1997
Primary Material: CONCRETE CULVERTS (14)
Tonnage: 38
County: PINELLAS
Depth: 28 ft

Relief: 13 ft [1]
Tides & Solunars
28 ft 28° 3' 27" N 82° 54' 56" W
Dunedin - J Site 20 Culverts
Date of Deployment: November 9 1997
Primary Material: CONCRETE CULVERTS (20)
Tonnage: 29
County: PINELLAS
Depth: 28 ft

Relief: 10 ft [1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 29 Pieces Of Concrete Flower Boxes From Courthouse
Date of Deployment: December 17 1997
Primary Material: CONCRETE BOXES (29)
Tonnage: 30
County: PINELLAS
Depth: 29 ft
[1]
Tides & Solunars
29 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 30 Pieces Of Concrete Flower Boxes From Courthouse
Date of Deployment: December 11 1997
Primary Material: CONCRETE BOXES (30)
Tonnage: 23
County: PINELLAS
Depth: 28 ft

Relief: 7 ft [1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 37 Pieces Of Concrete Culverts
Date of Deployment: December 10 1997
Primary Material: CONCRETE CULVERTS (37)
Tonnage: 37
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 23 Pieces Of Concrete Culverts
Date of Deployment: December 8 1997
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 26
County: PINELLAS
Depth: 28 ft

Relief: 14 ft [1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 20 Pieces Of Concrete Culverts
Date of Deployment: November 26 1997
Primary Material: CONCRETE CULVERTS (20)
Tonnage: 29
County: PINELLAS
Depth: 29 ft

Relief: 13 ft [1]
Tides & Solunars
29 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 15 Large Concrete Culverts
Date of Deployment: November 20 1997
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 28
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 33 Culverts And 1 Box
Date of Deployment: November 6 1997
Primary Material: CONCRETE CULVERTS (33)
Tonnage: 32
County: PINELLAS
Depth: 28 ft

Relief: 13 ft [1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 38 Small Pieces Of Concrete Culverts
Date of Deployment: November 4 1997
Primary Material: CONCRETE CULVERTS (38)
Tonnage: 38
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 40 Small Pieces Of Concrete Culverts
Date of Deployment: November 3 1997
Primary Material: CONCRETE CULVERTS (40)
Tonnage: 33
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 11 Large Pieces Of Culverts 12 Foot Long
Date of Deployment: October 29 1997
Primary Material: CONCRETE CULVERTS (11)
Tonnage: 46
County: PINELLAS
Depth: 28 ft

Relief: 13 ft [1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 19 Large Oval Culverts
Date of Deployment: November 21 1997
Primary Material: CONCRETE CULVERTS (19)
Tonnage: 33
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 28" N 82° 54' 56" W
Dunedin - J Site 11 Large Pieces Of Culverts
Date of Deployment: October 27 1997
Primary Material: CONCRETE CULVERTS (11)
Tonnage: 46
County: PINELLAS
Depth: 28 ft

Relief: 7 ft [1]
Tides & Solunars
28 ft 28° 3' 29" N 82° 54' 55" W
Dunedin - J Site 28 Pieces Of Culverts And Boxes
Date of Deployment: December 21 1997
Primary Material: CONCRETE CULVERTS (12)
Tonnage: 28
County: PINELLAS
Depth: 30 ft

Relief: 11 ft [1]
Tides & Solunars
30 ft 28° 3' 31" N 82° 54' 56" W
Dunedin Reef 22 Pieces Of Concrete Culverts And Rubble
Date of Deployment: January 6 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 22
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 27° 52' 37" N 83° 11' 12" W
Dunedin Reef Concrete Culvert And Pyramids
Date of Deployment: December 31 1975
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 28° 3' 12" N 82° 54' 33" W
Dunedin Reef Concrete Culverts 744 Sq. Feet Coverage
Date of Deployment: August 23 1982
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 30 ft
[1]
Tides & Solunars
30 ft 28° 3' 15" N 82° 54' 39" W
Dunedin Reef 20 Tons Of 36 Culverts
Date of Deployment: January 7 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 20
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 3' 20" N 82° 54' 34" W
Dunedin Reef Concrete Culverts 496 Sq. Feet Coverage
Date of Deployment: August 25 1982
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 30 ft
[1]
Tides & Solunars
30 ft 28° 3' 20" N 82° 54' 38" W
Dunedin Reef Concrete Culverts 750 Sq. Feet Coverage
Date of Deployment: August 24 1982
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 30 ft
[1]
Tides & Solunars
30 ft 28° 3' 20" N 82° 54' 38" W
Dunedin Reef 20.0 Yards. Of Rubble (2 Of 11 Loads)
Date of Deployment: November 19 1990
Primary Material: CONCRETE RUBBLE
County: PINELLAS [1]
Tides & Solunars
28° 3' 25" N 82° 54' 40" W
Dunedin Reef 20.0 Yards. Of Rubble (1 Of 11 Loads)
Date of Deployment: November 13 1990
Primary Material: CONCRETE RUBBLE
County: PINELLAS [1]
Tides & Solunars
28° 3' 25" N 82° 54' 39" W
Dunedin Reef 25.0 Yards. Of Rubble (5 Of 11 Loads)
Date of Deployment: November 26 1990
Primary Material: CONCRETE RUBBLE
County: PINELLAS [1]
Tides & Solunars
28° 3' 25" N 82° 54' 39" W
Dunedin Reef 10.6 Yards. Of Rubble (3 Of 11 Loads)
Date of Deployment: November 20 1990
Primary Material: CONCRETE RUBBLE
County: PINELLAS [1]
Tides & Solunars
28° 3' 25" N 82° 54' 39" W
Dunedin Reef Concrete Rubble
Date of Deployment: December 31 1990
Primary Material: CONCRETE RUBBLE
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 28° 3' 25" N 82° 54' 39" W
Dunedin Reef Site 'J' 12 Pieces Culverts Various Sizes
Date of Deployment: January 27 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 32
County: PINELLAS
Depth: 29 ft

Relief: 10 ft [1]
Tides & Solunars
29 ft 28° 3' 20" N 82° 54' 34" W
Egmont Key Reef 350 Pieces Of Pipe And 22 Concrete Pyramids (6’H X 8’B)
Date of Deployment: June 26 1999
Primary Material: MODULES CONCRETE PYRAMIDS (22)
Tonnage: 513
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 34' 60" N 82° 44' 36" W
Egmont Key Reef (Bay) #1 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: August 6 2001
Primary Material: BRIDGE SPANS
Tonnage: 224
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 4" N 82° 44' 39" W
Egmont Key Reef (Bay) #10 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: September 25 2001
Primary Material: BRIDGE SPANS
Tonnage: 178.81
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 34' 55" N 82° 44' 40" W
Egmont Key Reef (Bay) #11 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: September 26 2001
Primary Material: BRIDGE SPANS
Tonnage: 309.84
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 34' 57" N 82° 44' 40" W
Egmont Key Reef (Bay) #12 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: October 1 2001
Primary Material: BRIDGE SPANS
Tonnage: 190.12
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 34' 56" N 82° 44' 40" W
Egmont Key Reef (Bay) #2 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: August 9 2001
Primary Material: BRIDGE SPANS
Tonnage: 185
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 4" N 82° 44' 32" W
Egmont Key Reef (Bay) #3 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: August 15 2001
Primary Material: BRIDGE SPANS
Tonnage: 184.98
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 2" N 82° 44' 34" W
Egmont Key Reef (Bay) #4 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: August 20 2001
Primary Material: BRIDGE SPANS
Tonnage: 208.41
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 3" N 82° 44' 32" W
Egmont Key Reef (Bay) #5 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: August 24 2001
Primary Material: BRIDGE SPANS
Tonnage: 265.13
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 2" N 82° 44' 37" W
Egmont Key Reef (Bay) #6 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: August 30 2001
Primary Material: BRIDGE SPANS
Tonnage: 180.04
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 1" N 82° 44' 38" W
Egmont Key Reef (Bay) #7 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: September 6 2001
Primary Material: BRIDGE SPANS
Tonnage: 220.74
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 2" N 82° 44' 38" W
Egmont Key Reef (Bay) #9 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: September 19 2001
Primary Material: BRIDGE SPANS
Tonnage: 258.97
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 4" N 82° 44' 39" W
Egmont Key Reef (Bay)#13 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: October 4 2001
Primary Material: BRIDGE SPANS
Tonnage: 309.84
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 34' 57" N 82° 44' 41" W
Egmont Key Reef (Bay)#14 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: October 8 2001
Primary Material: BRIDGE SPANS
Tonnage: 309.8
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 35' 2" N 82° 44' 36" W
Egmont Key Reef (Bay)#15 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: October 12 2001
Primary Material: BRIDGE SPANS
Tonnage: 361.48
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 35' 5" N 82° 44' 35" W
Egmont Key Reef (Bay)#16 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: October 16 2001
Primary Material: BRIDGE SPANS
Tonnage: 277.47
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 35' 4" N 82° 44' 33" W
Egmont Key Reef (Bay)#22 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: November 27 2001
Primary Material: BRIDGE SPANS
Tonnage: 577.53
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 35' 4" N 82° 44' 41" W
Egmont Key Reef (Bay)#23 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: December 4 2001
Primary Material: BRIDGE SPANS
Tonnage: 172.65
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 35' 5" N 82° 44' 32" W
Egmont Key Reef (Bay)#24 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: December 7 2001
Primary Material: BRIDGE SPANS
Tonnage: 277.47
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 35' 5" N 82° 44' 35" W
Egmont Key Reef (Bay)#25 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: December 21 2001
Primary Material: BRIDGE SPANS
Tonnage: 331.73
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 35' 1" N 82° 44' 31" W
Egmont Key Reef (Bay)#26 Gulf Pier -Ft. Desoto Pile Cutoffs
Date of Deployment: May 17 2002
Primary Material: CONCRETE PILE CUTOFFS
Tonnage: 44.4
County: HILLSBOROUGH
Depth: 18 ft

Relief: 8 ft [1]
Tides & Solunars
18 ft 27° 34' 59" N 82° 44' 38" W
Egmont Key Reef (Bay)#8 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: September 12 2001
Primary Material: BRIDGE SPANS
Tonnage: 246.64
County: HILLSBOROUGH
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 35' 3" N 82° 44' 41" W
Howard Franklin Site (Bay) 400 X 200 Yards. Of Bridge Rubble And Pilings
Date of Deployment: December 31 1991
Primary Material: BRIDGE RUBBLE
County: HILLSBOROUGH
Depth: 16 ft

Relief: 8 ft [1]
Tides & Solunars
16 ft 27° 54' 38" N 82° 33' 14" W
Indian Shores Reef - Site 1 2 Boat Molds Secured Together And Laying On Starboard Side
Date of Deployment: July 9 1985
Primary Material: FIBERGLASS BOAT MOLDS (2)
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 51' 29" N 83° 1' 45" W
Indian Shores Reef - Site 10 24 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1
Date of Deployment: March 19 2003
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 32.5
County: PINELLAS
Depth: 40 ft

Relief: 10 ft [1]
Tides & Solunars
40 ft 27° 51' 42" N 83° 1' 52" W
Indian Shores Reef - Site 11 14 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1
Date of Deployment: March 13 2003
Primary Material: CONCRETE CULVERTS (14)
Tonnage: 25
County: PINELLAS
Depth: 40 ft

Relief: 7 ft [1]
Tides & Solunars
40 ft 27° 51' 42" N 83° 1' 51" W
Indian Shores Reef - Site 12 22 Pieces Culverts 15 X 8 Ft. Long
Date of Deployment: March 10 2003
Primary Material: CONCRETE CULVERTS (22)
Tonnage: 13
County: PINELLAS
Depth: 40 ft

Relief: 8 ft [1]
Tides & Solunars
40 ft 27° 51' 41" N 83° 1' 52" W
Indian Shores Reef - Site 13 21 Pieces Culverts Various Sizes
Date of Deployment: July 29 2002
Primary Material: CONCRETE CULVERTS (21)
Tonnage: 37.5
County: PINELLAS
Depth: 40 ft

Relief: 17 ft [1]
Tides & Solunars
40 ft 27° 51' 42" N 83° 1' 52" W
Indian Shores Reef - Site 14 17 Pieces Culverts Various Sizes
Date of Deployment: July 24 2002
Primary Material: CONCRETE CULVERTS (17)
Tonnage: 27.8
County: PINELLAS
Depth: 41 ft

Relief: 12 ft [1]
Tides & Solunars
41 ft 27° 51' 42" N 83° 1' 51" W
Indian Shores Reef - Site 15 28 Pieces Culverts Various Sizes
Date of Deployment: May 29 2003
Primary Material: CONCRETE CULVERTS (28)
Tonnage: 33
County: PINELLAS
Depth: 40 ft

Relief: 13 ft [1]
Tides & Solunars
40 ft 27° 51' 41" N 83° 1' 52" W
Indian Shores Reef - Site 16 Concrete Culverts Various Sizes-21 Total - 6 Of 10 Drops This Grant
Date of Deployment: February 17 2005
Primary Material: CONCRETE CULVERTS (21)
Tonnage: 22
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 55" W
Indian Shores Reef - Site 17 Concrete Culverts Various Sizes-10 Total - 5 Of 10 Drops This Grant
Date of Deployment: February 16 2005
Primary Material: CONCRETE CULVERTS (10)
Tonnage: 24
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 18 Concrete Culverts Various Sizes-29 Total - 4 Of 10 Drops This Grant
Date of Deployment: February 15 2005
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 29.5
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 55" W
Indian Shores Reef - Site 19 Concrete Culverts 12 To 24’X 8’’ -24 Total - 2 Of 10 Drops This Gran
Date of Deployment: January 27 2005
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 24.8
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 2 64 Pieces Culverts Various Sizes Two Dates Also 7/22/03
Date of Deployment: July 21 2003
Primary Material: CONCRETE CULVERTS (64)
Tonnage: 42
County: PINELLAS
Depth: 40 ft

Relief: 15 ft [1]
Tides & Solunars
40 ft 27° 51' 41" N 83° 1' 52" W
Indian Shores Reef - Site 20 Concrete Pier Slabs 10’X2’ -22 Total -1 Of 10 Drops This Grant
Date of Deployment: January 21 2005
Primary Material: CONCRETE RUBBLE
Tonnage: 29.4
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 55" W
Indian Shores Reef - Site 21 Concrete Culverts Various Sizes-25 Total - 3 Of 10 Drops This Grant
Date of Deployment: February 3 2005
Primary Material: CONCRETE CULVERTS (25)
Tonnage: 33.9
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 49" N 83° 1' 55" W
Indian Shores Reef - Site 22 16 Pieces Culverts Various Sizes
Date of Deployment: July 8 2002
Primary Material: CONCRETE CULVERTS (16)
Tonnage: 36.4
County: PINELLAS
Depth: 40 ft

Relief: 10 ft [1]
Tides & Solunars
40 ft 27° 51' 42" N 83° 1' 52" W
Indian Shores Reef - Site 23 2 Loads Form 1/5/83 To 6/23/83 Three Other Sites Same Grant
Date of Deployment: June 28 1983
Primary Material: TIRES UNITS
County: PINELLAS [1]
Tides & Solunars
27° 51' 24" N 83° 1' 48" W
Indian Shores Reef - Site 24 Concrete Slabs Various Sizes
Date of Deployment: May 2 2006
Primary Material: CONCRETE SLABS(23)
Tonnage: 24.39
County: PINELLAS
Depth: 39 ft

Relief: 5 ft [1]
Tides & Solunars
39 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 25 Concrete Culverts Various Sizes
Date of Deployment: May 15 2006
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 25
County: PINELLAS
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 26 Concrete Slabs 10’X4’x10’
Date of Deployment: May 10 2006
Primary Material: CONCRETE SLABS (19)
Tonnage: 30.78
County: PINELLAS
Depth: 41 ft

Relief: 6 ft [1]
Tides & Solunars
41 ft 27° 51' 48" N 83° 1' 55" W
Indian Shores Reef - Site 27 Concrete Culverts
Date of Deployment: May 9 2006
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 26.7
County: PINELLAS
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 28 Concrete Culverts Various Sizes-30 Total - 9 Of 10 Drops This Grant
Date of Deployment: March 11 2005
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 34.5
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 29 Concrete Culverts Various Sizes-24 Total - 8 Of 10 Drops This Grant
Date of Deployment: March 7 2005
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 28.6
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 3 33 Pieces Culverts Various Sizes
Date of Deployment: May 27 2003
Primary Material: CONCRETE CULVERTS (33)
Tonnage: 36.9
County: PINELLAS
Depth: 40 ft

Relief: 15 ft [1]
Tides & Solunars
40 ft 27° 51' 41" N 83° 1' 52" W
Indian Shores Reef - Site 30 Concrete Culverts Various Sizes-26 Total - 7 Of 10 Drops This Grant
Date of Deployment: February 24 2005
Primary Material: CONCRETE CULVERTS (26)
Tonnage: 36.2
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 31 Concrete Culverts Various Sizes-24 Total - 10 Of 10 Drops This Grant
Date of Deployment: March 14 2005
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 34.9
County: PINELLAS
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 27° 51' 48" N 83° 1' 54" W
Indian Shores Reef - Site 32 Concrete Culverts Various Sizes-30 Total -County Match To Grant Load 1
Date of Deployment: September 14 2005
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 30.5
County: PINELLAS
Depth: 35 ft

Relief: 4 ft [1]
Tides & Solunars
35 ft 27° 51' 46" N 83° 1' 55" W
Indian Shores Reef - Site 33 Concrete Culverts Various Sizes-36 Total - County Match To Grant Load
Date of Deployment: August 22 2005
Primary Material: CONCRETE CULVERTS (36)
Tonnage: 35.5
County: PINELLAS
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 27° 53' 36" N 83° 1' 54" W
Indian Shores Reef - Site 34 Concrete Culverts Various Sizes-30 Total -County Match To Grant Load 1
Date of Deployment: October 18 2005
Primary Material: CONCRETE CULVERTS (18)
Tonnage: 24.39
County: PINELLAS
Depth: 40 ft

Relief: 5 ft [1]
Tides & Solunars
40 ft 27° 51' 47" N 83° 1' 55" W
Indian Shores Reef - Site 35 Concrete Culverts Various Sizes-30 Total -County Match To Grant Load 1
Date of Deployment: September 26 2005
Primary Material: CONCRETE CULVERTS (11)
Tonnage: 32.74
County: PINELLAS
Depth: 40 ft

Relief: 8 ft [1]
Tides & Solunars
40 ft 27° 51' 48" N 83° 1' 55" W
Indian Shores Reef - Site 36 Concrete Slabs Various Sizes
Date of Deployment: May 3 2006
Primary Material: CONCRETE BRIDGE RUBBLE (98)
Tonnage: 628
County: PINELLAS
Depth: 44 ft

Relief: 14 ft [1]
Tides & Solunars
44 ft 27° 51' 46" N 83° 1' 44" W
Indian Shores Reef - Site 4 27 Pieces Culverts Various Sizes
Date of Deployment: July 18 2002
Primary Material: CONCRETE CULVERTS (27)
Tonnage: 26.2
County: PINELLAS
Depth: 38 ft

Relief: 15 ft [1]
Tides & Solunars
38 ft 27° 51' 53" N 83° 1' 52" W
Indian Shores Reef - Site 5 20 Pieces Culverts Various Sizes
Date of Deployment: July 17 2002
Primary Material: CONCRETE CULVERTS (20)
Tonnage: 26.3
County: PINELLAS
Depth: 40 ft

Relief: 10 ft [1]
Tides & Solunars
40 ft 27° 51' 53" N 83° 1' 52" W
Indian Shores Reef - Site 6 22 Pieces Culverts Various Sizes
Date of Deployment: June 11 2003
Primary Material: CONCRETE CULVERTS (22)
Tonnage: 22.4
County: PINELLAS
Depth: 40 ft

Relief: 15 ft [1]
Tides & Solunars
40 ft 27° 51' 41" N 83° 1' 52" W
Indian Shores Reef - Site 7 15 Pieces Culverts Various Sizes
Date of Deployment: April 24 2003
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 32.3
County: PINELLAS
Depth: 39 ft

Relief: 10 ft [1]
Tides & Solunars
39 ft 27° 51' 42" N 83° 1' 53" W
Indian Shores Reef - Site 8 17 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1
Date of Deployment: April 16 2003
Primary Material: CONCRETE CULVERTS (17)
Tonnage: 32.5
County: PINELLAS
Depth: 41 ft

Relief: 10 ft [1]
Tides & Solunars
41 ft 27° 51' 42" N 83° 1' 52" W
Indian Shores Reef - Site 9 17 Pieces Culverts Various Sizes And Concrete Barriers 4X4x1
Date of Deployment: April 14 2003
Primary Material: CONCRETE CULVERTS (17)
Tonnage: 21
County: PINELLAS
Depth: 38 ft

Relief: 8 ft [1]
Tides & Solunars
38 ft 27° 51' 41" N 83° 1' 52" W
Little Bird Key Oyster Reef - Site 1 350 Bags Of Fossilized Locally Mined Shell Near Shore About 125 Feet L
Date of Deployment: January 28 2005
Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS
County: PINELLAS
Depth: 1 ft

Relief: 2 ft [1]
Tides & Solunars
1 ft 27° 41' 8" N 82° 43' 1" W
Little Bird Key Oyster Reef - Site 2 125 Bags Of Fossilized Locally Mined Shell Near Shore About 50 Feet Lo
Date of Deployment: January 28 2005
Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS
County: PINELLAS
Depth: 1 ft

Relief: 2 ft [1]
Tides & Solunars
1 ft 27° 41' 7" N 82° 43' 3" W
Little Bird Key Oyster Reef - Site 3 125 Bags Of Fossilized Locally Mined Shell Near Shore About 50 Feet Lo
Date of Deployment: January 28 2005
Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS
County: PINELLAS
Depth: 1 ft

Relief: 2 ft [1]
Tides & Solunars
1 ft 27° 41' 6" N 82° 43' 4" W
Madeira Reef - Site 1 29 Loads From 11/09/82 To 04/21/83 686 Yards. Total
Date of Deployment: March 15 1983
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 46' 18" N 82° 54' 54" W
Madeira Reef - Site 2 2Nd Of 4 Loads This Site
Date of Deployment: June 26 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 46' 26" N 82° 54' 54" W
Madeira Reef - Site 3 Two Groups About 40 Feet Apart 4Th Of 4 Loads
Date of Deployment: July 25 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 46' 21" N 82° 54' 54" W
Madeira Reef - Site 4 3Rd Of 4 Loads This Site
Date of Deployment: June 27 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 46' 14" N 82° 54' 56" W
Madeira Reef - Site 5 1Rst Of 4 Loads This Site
Date of Deployment: June 23 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 46' 19" N 82° 54' 51" W
Manatee River-Emerson Point04-18 Bay Mini.Lo-Pro And Table Top Balls
Date of Deployment: February 6 2004
Primary Material: MODULES CONCRETE REEFBALLS(81)
Tonnage: 20.03
County: MANATEE
Depth: 10 ft

Relief: 3 ft [1]
Tides & Solunars
10 ft 27° 31' 50" N 82° 38' 46" W
Misener Barge 100 X 35 X 8 Foot Barge Accidentally Sunk By Misener Marine
Date of Deployment: December 19 1985
Primary Material: BARGE STEEL 100
County: MANATEE
Depth: 25 ft

Relief: 8 ft [1]
Tides & Solunars
25 ft 27° 32' 41" N 82° 50' 42" W
North County Reef (Center) 9 Pieces Of Concrete Culverts 42 And 48 Inch Sizes (Ovals)
Date of Deployment: January 27 2000
Primary Material: CONCRETE CULVERTS (9)
Tonnage: 34
County: PINELLAS
Depth: 47 ft
[1]
Tides & Solunars
47 ft 28° 0' 1" N 83° 0' 46" W
North County Reef (Center) Steel Barge 150X45x10h Upright South Of The Other Two
Date of Deployment: August 31 1999
Primary Material: BARGE STEEL 150’
Tonnage: 130
County: PINELLAS
Depth: 42 ft

Relief: 10 ft [1]
Tides & Solunars
42 ft 28° 2' 59" N 83° 0' 44" W
North County Reef (Center) Steel Barge 120X30x7h Facing East -West Upright
Date of Deployment: August 2 1999
Primary Material: BARGE STEEL 120’
Tonnage: 120
County: PINELLAS
Depth: 45 ft

Relief: 7 ft [1]
Tides & Solunars
45 ft 28° 2' 59" N 83° 0' 45" W
North County Reef (Ne-Corner) Concrete Junction Box 6X4x4’-Sinker For Corner Buoys
Date of Deployment: July 6 1999
Primary Material: CONCRETE JUNCTION BOX ANCHOR
Tonnage: 3
County: PINELLAS
Depth: 44 ft

Relief: 4 ft [1]
Tides & Solunars
44 ft 28° 3' 30" N 83° 0' 38" W
North County Reef (Ne)-A Tetrahedrons 40’X32’x18’h 270 Ft. Ne Of Barges
Date of Deployment: September 1 1999
Primary Material: MODULES CONCRETE TETRAHEDRONS
County: PINELLAS
Depth: 45 ft

Relief: 18 ft [1]
Tides & Solunars
45 ft 28° 3' 1" N 83° 0' 43" W
North County Reef (Ne)-A 18 Pieces Of Concrete Culverts 18 24 And 30 Inch Sizes (Ovals)
Date of Deployment: December 3 1999
Primary Material: CONCRETE CULVERTS (19)
Tonnage: 30
County: PINELLAS
Depth: 49 ft

Relief: 11 ft [1]
Tides & Solunars
49 ft 28° 3' 28" N 83° 0' 29" W
North County Reef (Ne)-A 13 Pieces Of Concrete Culverts 36 Inch Sizes
Date of Deployment: January 7 2000
Primary Material: CONCRETE CULVERTS (13)
Tonnage: 29.5
County: PINELLAS
Depth: 47 ft

Relief: 12 ft [1]
Tides & Solunars
47 ft 28° 3' 29" N 83° 0' 37" W
North County Reef (Ne)-A 27 Pieces Of Concrete Culverts 18 24 And 30 Inch Sizes (Ovals)
Date of Deployment: November 29 1999
Primary Material: CONCRETE CULVERTS (27)
Tonnage: 26
County: PINELLAS
Depth: 46 ft

Relief: 5 ft [1]
Tides & Solunars
46 ft 28° 3' 29" N 83° 0' 36" W
North County Reef (Ne)-A 18 Pieces Of Concrete Culverts 12 18 24 And 30 Inch Sizes
Date of Deployment: November 30 1999
Primary Material: CONCRETE CULVERTS (18)
Tonnage: 26
County: PINELLAS
Depth: 47 ft

Relief: 8 ft [1]
Tides & Solunars
47 ft 28° 3' 29" N 83° 0' 37" W
North County Reef (Ne)-A 20 Pieces Of Concrete Culverts 30 Inch Sizes
Date of Deployment: December 10 1999
Primary Material: CONCRETE CULVERTS (20)
Tonnage: 35
County: PINELLAS
Depth: 48 ft

Relief: 16 ft [1]
Tides & Solunars
48 ft 28° 3' 29" N 83° 0' 37" W
North County Reef (Ne)-A 7 Pieces Of Concrete Culverts 54 To 48 Inch Sizes
Date of Deployment: September 9 1999
Primary Material: CONCRETE CULVERTS (7)
Tonnage: 30
County: PINELLAS
Depth: 44 ft

Relief: 5 ft [1]
Tides & Solunars
44 ft 28° 3' 30" N 83° 0' 37" W
North County Reef (Ne)-A 29 Pieces Of Concrete Culverts 18 Inch Sizes
Date of Deployment: December 22 1999
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 23
County: PINELLAS
Depth: 47 ft

Relief: 10 ft [1]
Tides & Solunars
47 ft 28° 3' 30" N 83° 0' 36" W
North County Reef (Ne)-A 19 Pieces Of Concrete Culverts 18 24 And 30 Inch Sizes
Date of Deployment: November 24 1999
Primary Material: CONCRETE CULVERTS (19)
Tonnage: 26
County: PINELLAS
Depth: 48 ft

Relief: 5 ft [1]
Tides & Solunars
48 ft 28° 3' 30" N 83° 0' 37" W
North County Reef (Ne)-A 17 Pieces Of Concrete Culverts 30 Inch Sizes
Date of Deployment: December 13 1999
Primary Material: CONCRETE CULVERTS (17)
Tonnage: 27
County: PINELLAS
Depth: 47 ft

Relief: 17 ft [1]
Tides & Solunars
47 ft 28° 3' 30" N 83° 0' 38" W
North County Reef (Ne)-A 23 Concrete Slabs 27-47 X118 Inch-On Top Of Culverts
Date of Deployment: December 20 1999
Primary Material: CONCRETE SLABS (23)
Tonnage: 28
County: PINELLAS
Depth: 47 ft

Relief: 17 ft [1]
Tides & Solunars
47 ft 28° 3' 30" N 83° 0' 36" W
North County Reef (Ne)-A 18 Pieces Of Concrete Culverts 19 X 30 And 14 X 23 Inch Sizes (Ovals)
Date of Deployment: December 6 1999
Primary Material: CONCRETE CULVERTS (21)
Tonnage: 24
County: PINELLAS
Depth: 48 ft

Relief: 12 ft [1]
Tides & Solunars
48 ft 28° 3' 30" N 83° 0' 35" W
North County Reef (Ne)-A 24 Concrete Slabs 27-47 X118 Inch-On Top Of Culverts
Date of Deployment: December 21 1999
Primary Material: CONCRETE SLABS (24)
Tonnage: 27
County: PINELLAS
Depth: 48 ft

Relief: 17 ft [1]
Tides & Solunars
48 ft 28° 3' 30" N 83° 0' 36" W
North County Reef (Ne)-A 29 Concrete Slabs And 2 Boxes
Date of Deployment: January 10 2000
Primary Material: CONCRETE SLABS (27)
Tonnage: 31.5
County: PINELLAS
Depth: 48 ft

Relief: 15 ft [1]
Tides & Solunars
48 ft 28° 3' 35" N 83° 0' 36" W
North County Reef (Nw-Corner) Concrete Junction Box 6X4x4’-Sinker For Corner Buoys
Date of Deployment: July 6 1999
Primary Material: CONCRETE JUNCTION BOX ANCHOR
Tonnage: 3
County: PINELLAS
Depth: 44 ft

Relief: 4 ft [1]
Tides & Solunars
44 ft 28° 3' 30" N 83° 0' 52" W
North County Reef (Nw) Two N-W Rows Of Polygonals 50 6-Ft. And 50 4.5- Ft Tall Nw Of Barges
Date of Deployment: August 17 1999
Primary Material: CONCRETE POLYGONALS (100)
Tonnage: 50
County: PINELLAS
Depth: 42 ft

Relief: 6 ft [1]
Tides & Solunars
42 ft 28° 3' 1" N 83° 0' 46" W
North County Reef (Se-Corner) Concrete Junction Box 6X4x4’-Sinker For Corner Buoys
Date of Deployment: July 6 1999
Primary Material: CONCRETE JUNCTION BOX ANCHOR
Tonnage: 3
County: PINELLAS
Depth: 44 ft

Relief: 4 ft [1]
Tides & Solunars
44 ft 28° 2' 30" N 83° 0' 37" W
North County Reef (South) Limestone Boulders About 190 Ft. South Of Barges
Date of Deployment: September 3 1999
Primary Material: ROCK LIMESTONE
County: PINELLAS
Depth: 45 ft
[1]
Tides & Solunars
45 ft 28° 2' 56" N 83° 0' 45" W
North County Reef (Sw-Corner) Concrete Junction Box 6X4x4’-Sinker For Corner Buoys
Date of Deployment: July 6 1999
Primary Material: CONCRETE JUNCTION BOX ANCHOR
Tonnage: 3
County: PINELLAS
Depth: 44 ft

Relief: 4 ft [1]
Tides & Solunars
44 ft 28° 2' 29" N 83° 0' 52" W
Picnic Island Pier Reef (Bay) Concrete Pyramid Modules Placed 75’ From The End Of The Picnic Pier.
Date of Deployment: July 15 1991
Primary Material: MODULES CONCRETE PYRAMIDS
Tonnage: 54
County: HILLSBOROUGH [1]
Tides & Solunars
27° 51' 23" N 82° 33' 12" W
Picnic Island Reef (Bay) 830 Cubic Yards Of Concrete And Misc. Fittings.
Date of Deployment: May 28 1987
Primary Material: CONCRETE CULVERTS
County: HILLSBOROUGH
Depth: 26 ft
[1]
Tides & Solunars
26 ft 27° 49' 58" N 82° 33' 36" W
Pier-60 Concrete Material Placed Around Pilings Off Pier 60 In Clearwater.
Date of Deployment: October 28 1986
Primary Material: CONCRETE CULVERTS
Tonnage: 481
County: PINELLAS [1]
Tides & Solunars
27° 58' 38" N 82° 49' 50" W
Pinellas Ii Large Bait Fish School Adjacent To Tires
Date of Deployment: June 25 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 44" N 83° 11' 6" W
Pinellas Ii Tight But Unstable Patch 17 Foot Profile
Date of Deployment: June 4 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft

Relief: 17 ft [1]
Tides & Solunars
80 ft 27° 52' 46" N 83° 11' 6" W
Pinellas Ii Compact Configuration With About 10 Foot Profile
Date of Deployment: July 24 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft

Relief: 10 ft [1]
Tides & Solunars
80 ft 27° 52' 47" N 83° 11' 9" W
Pinellas Ii Near Older Tire Units
Date of Deployment: July 17 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 47" N 83° 11' 7" W
Pinellas Ii Near Older Tire Units
Date of Deployment: July 2 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 47" N 83° 11' 7" W
Pinellas Ii Good Small Patch
Date of Deployment: June 11 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 49" N 83° 11' 11" W
Pinellas Ii Scattered About The Bottom Minimum Profile
Date of Deployment: May 2 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft

Relief: 15 ft [1]
Tides & Solunars
80 ft 27° 52' 49" N 83° 11' 9" W
Pinellas Ii Boat Mold Adjacent To Tires
Date of Deployment: May 29 1985
Primary Material: FIBERGLASS BOAT MOLD
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 49" N 83° 11' 9" W
Pinellas Ii Tires Placed In Tight Patch 15 Foot Profile
Date of Deployment: April 30 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft

Relief: 15 ft [1]
Tides & Solunars
80 ft 27° 52' 50" N 83° 11' 7" W
Pinellas Ii Highly Scattered Due To Rough Seas
Date of Deployment: May 22 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 50" N 83° 11' 11" W
Pinellas Ii Two Piles 30 Feet Apart 15 Foot Profile
Date of Deployment: May 21 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft

Relief: 15 ft [1]
Tides & Solunars
80 ft 27° 52' 51" N 83° 11' 1" W
Pinellas Ii Highly Scattered Due To Rough Seas
Date of Deployment: May 8 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft

Relief: 3 ft [1]
Tides & Solunars
80 ft 27° 52' 52" N 83° 11' 5" W
Pinellas Ii Tires Placed In Tight Patch 15 Foot Profile
Date of Deployment: April 23 1985
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft

Relief: 15 ft [1]
Tides & Solunars
80 ft 27° 52' 52" N 83° 11' 5" W
Pinellas Ii-Buoy Site 4 Large Culverts 54
Date of Deployment: May 4 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 18
County: PINELLAS
Depth: 81 ft

Relief: 12 ft [1]
Tides & Solunars
81 ft 27° 52' 38" N 83° 11' 16" W
Pinellas Ii - Blackthorn 180 Foot Coast Guard Cutter The Blackthorn
Date of Deployment: December 31 1982
Primary Material: SHIP STEEL
County: PINELLAS
Depth: 80 ft

Relief: 30 ft [1]
Tides & Solunars
80 ft 27° 52' 34" N 83° 11' 17" W
Pinellas Ii Reef Compacted Tire Units 80 Sq. Feet Coverage
Date of Deployment: June 23 1983
Primary Material: TIRE UNITS COMPACTED
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 31" N 83° 11' 16" W
Pinellas Ii Reef Compacted Tire Units 150 Sq. Feet Coverage
Date of Deployment: April 13 1983
Primary Material: TIRE UNITS COMPACTED
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 44" N 83° 11' 14" W
Pinellas Ii Reef Tire Units 175 Sq. Feet Coverage
Date of Deployment: April 26 1983
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 47" N 83° 11' 12" W
Pinellas Ii Reef Banded Split Tire Units 100 Sq. Feet Coverage
Date of Deployment: June 21 1983
Primary Material: TIRE UNITS SPLIT AND BANDED
County: PINELLAS
Depth: 80 ft
[1]
Tides & Solunars
80 ft 27° 52' 47" N 83° 11' 9" W
Pinellas South Reef Steel Barge 75X24x6’ Upright East-West
Date of Deployment: June 17 2004
Primary Material: BARGE STEEL 75’
Tonnage: 80
County: PINELLAS
Depth: 50 ft

Relief: 9 ft [1]
Tides & Solunars
50 ft 27° 43' 20" N 82° 58' 29" W
Pinellas South Reef Steel Barge 110X50x10’ Upright Southwest To Northeast
Date of Deployment: June 18 2004
Primary Material: BARGE STEEL 110’
Tonnage: 200
County: PINELLAS
Depth: 50 ft

Relief: 12 ft [1]
Tides & Solunars
50 ft 27° 43' 22" N 82° 58' 35" W
Pinellas South Reef Steel Hulled Tugboat Orange 80’ X 20’ X 12’H Resting On Port Side
Date of Deployment: April 8 2003
Primary Material: SHIP STEEL TUGBOAT 80’
Tonnage: 148
County: PINELLAS
Depth: 45 ft

Relief: 20 ft [1]
Tides & Solunars
45 ft 27° 43' 23" N 82° 58' 27" W
Pinellas South Reef 16 Sinkers Placed Around Corners Of The Site
Date of Deployment: April 2 2003
Primary Material: CONCRETE SINKERS (16)
Tonnage: 80
County: PINELLAS
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 27° 43' 23" N 82° 58' 27" W
Pinellas South Reef 16 Sinkers Placed Around Corners Of The Site
Date of Deployment: April 3 2003
Primary Material: CONCRETE SINKERS (10)
Tonnage: 80
County: PINELLAS
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 27° 43' 23" N 82° 58' 27" W
Pinellas South Reef 8 Pieces Of 6X4x5 Concrete Junction Boxes
Date of Deployment: March 25 2003
Primary Material: CONCRETE JUNCTION BOXES (8)
Tonnage: 32
County: PINELLAS
Depth: 41 ft

Relief: 6 ft [1]
Tides & Solunars
41 ft 27° 43' 23" N 82° 58' 27" W
Pinellas South Reef Steel Barge 114X28x7’ Upright
Date of Deployment: June 17 2004
Primary Material: BARGE STEEL 110’
Tonnage: 140
County: PINELLAS
Depth: 50 ft

Relief: 10 ft [1]
Tides & Solunars
50 ft 27° 43' 23" N 82° 58' 37" W
Pinellas South Reef 18 And 15 Diameter Culverts At Site -5(1)
Date of Deployment: September 30 2004
Primary Material: CONCRETE CULVERTS (29)
County: PINELLAS
Depth: 46 ft

Relief: 11 ft [1]
Tides & Solunars
46 ft 27° 43' 29" N 82° 58' 36" W
Pinellas South Reef 2418 And 15 Diameter Culverts At Site#5
Date of Deployment: August 26 2004
Primary Material: CONCRETE CULVERTS (41)
County: PINELLAS
Depth: 46 ft

Relief: 20 ft [1]
Tides & Solunars
46 ft 27° 43' 29" N 82° 58' 36" W
Pinellas South Reef 42 2418 And 15 Diameter Culverts At Site -5(1)
Date of Deployment: September 1 2004
Primary Material: CONCRETE CULVERTS (30)
County: PINELLAS
Depth: 46 ft

Relief: 20 ft [1]
Tides & Solunars
46 ft 27° 43' 30" N 82° 58' 36" W
Pinellas South Reefsite-5 34 18And 15 Diameter Culverts At Site -5(3)
Date of Deployment: November 2 2004
Primary Material: CONCRETE CULVERTS (35)
Tonnage: 25.7
County: PINELLAS
Depth: 47 ft

Relief: 11 ft [1]
Tides & Solunars
47 ft 27° 43' 29" N 82° 58' 35" W
Pinellas South Reefsite-5 48And 36 Diameter Culverts At Site -5(2)
Date of Deployment: October 26 2004
Primary Material: CONCRETE CULVERTS (9)
County: PINELLAS
Depth: 48 ft

Relief: 9 ft [1]
Tides & Solunars
48 ft 27° 43' 30" N 82° 58' 35" W
Pinellas South Reefsite1 Layered Pipes And Poles 34 Feet Se Of Main Pile
Date of Deployment: April 2 2002
Primary Material: CONCRETE CULVERTS (17)
Tonnage: 34
County: PINELLAS
Depth: 48 ft

Relief: 14 ft [1]
Tides & Solunars
48 ft 27° 43' 22" N 82° 58' 31" W
Pinellas South Reefsite1 24 48 And 15 X 8 Feet Culverts
Date of Deployment: November 19 2001
Primary Material: CONCRETE CULVERTS (26)
Tonnage: 30
County: PINELLAS
Depth: 47 ft

Relief: 13 ft [1]
Tides & Solunars
47 ft 27° 43' 22" N 82° 58' 33" W
Pinellas South Reefsite1 42 And 18 X 8 Feet Culverts
Date of Deployment: December 5 2001
Primary Material: CONCRETE CULVERTS (17)
Tonnage: 33.3
County: PINELLAS
Depth: 47 ft

Relief: 16 ft [1]
Tides & Solunars
47 ft 27° 43' 22" N 82° 58' 33" W
Pinellas South Reefsite1 36 Pieces Placed 34 Ft South Of Main Pile
Date of Deployment: March 21 2002
Primary Material: CONCRETE CULVERTS (36)
Tonnage: 25
County: PINELLAS
Depth: 48 ft

Relief: 9 ft [1]
Tides & Solunars
48 ft 27° 43' 22" N 82° 58' 33" W
Pinellas South Reefsite1 24 48 And 15 Culverts
Date of Deployment: November 7 2001
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 29.5
County: PINELLAS
Depth: 47 ft

Relief: 13 ft [1]
Tides & Solunars
47 ft 27° 43' 22" N 82° 58' 32" W
Pinellas South Reefsite1 24 48 And 15 Culverts
Date of Deployment: October 4 2001
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 30.8
County: PINELLAS
Depth: 48 ft

Relief: 10 ft [1]
Tides & Solunars
48 ft 27° 43' 23" N 82° 58' 32" W
Pinellas South Reefsite1 24 48 And 15 X 8 Feet Culverts
Date of Deployment: November 8 2001
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 29.5
County: PINELLAS
Depth: 47 ft

Relief: 14 ft [1]
Tides & Solunars
47 ft 27° 43' 23" N 82° 58' 33" W
Pinellas South Reefsite1 24 48 And 15 X 8 Feet Culverts
Date of Deployment: November 20 2001
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 35
County: PINELLAS
Depth: 47 ft

Relief: 13 ft [1]
Tides & Solunars
47 ft 27° 43' 23" N 82° 58' 33" W
Pinellas South Reefsite1 24 Pieces Culverts Various Sizes And 4 Slabs
Date of Deployment: June 20 2002
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 36.7
County: PINELLAS
Depth: 47 ft

Relief: 12 ft [1]
Tides & Solunars
47 ft 27° 43' 23" N 82° 58' 31" W
Pinellas South Reefsite1 30 24 15 And 18 X 8 Feet Culverts
Date of Deployment: December 13 2001
Primary Material: CONCRETE CULVERTS (39)
County: PINELLAS
Depth: 48 ft

Relief: 16 ft [1]
Tides & Solunars
48 ft 27° 43' 23" N 82° 58' 32" W
Pinellas South Reefsite1 24 48 And 15 X 8 Feet Culverts
Date of Deployment: November 28 2001
Primary Material: CONCRETE CULVERTS (22)
Tonnage: 29.5
County: PINELLAS
Depth: 48 ft

Relief: 16 ft [1]
Tides & Solunars
48 ft 27° 43' 23" N 82° 58' 32" W
Pinellas South Reefsite1 26 Pieces Culverts Various Sizes
Date of Deployment: June 12 2002
Primary Material: CONCRETE CULVERTS (26)
Tonnage: 34
County: PINELLAS
Depth: 50 ft

Relief: 15 ft [1]
Tides & Solunars
50 ft 27° 43' 23" N 82° 58' 33" W
Port Manatee Reef (Bay) - #1 450 Pounds Of Concrete Construction Blocks
Date of Deployment: August 16 1997
Primary Material: CONCRETE BLOCKS
County: HILLSBOROUGH
Depth: 20 ft

Relief: 1 ft [1]
Tides & Solunars
20 ft 27° 39' 42" N 82° 34' 48" W
Port Manatee Reef (Bay) - #10 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: March 2 2004
Primary Material: BRIDGE SPANS
Tonnage: 489.1
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 44" N 82° 34' 41" W
Port Manatee Reef (Bay) - #11 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: February 13 2004
Primary Material: BRIDGE SPANS
Tonnage: 225.24
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 50" N 82° 34' 50" W
Port Manatee Reef (Bay) - #12 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: November 14 2001
Primary Material: BRIDGE SPANS
Tonnage: 177.58
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 50" N 82° 34' 40" W
Port Manatee Reef (Bay) - #13 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: October 25 2001
Primary Material: BRIDGE SPANS
Tonnage: 187.44
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 47" N 82° 34' 48" W
Port Manatee Reef (Bay) - #14 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: October 19 2001
Primary Material: BRIDGE SPANS
Tonnage: 92.49
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 50" N 82° 34' 48" W
Port Manatee Reef (Bay) - #15 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: June 11 2003
Primary Material: BRIDGE SPANS
Tonnage: 319.9
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 47" N 82° 34' 40" W
Port Manatee Reef (Bay) - #16 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: February 19 2004
Primary Material: BRIDGE SPANS
Tonnage: 258.63
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 46" N 82° 34' 48" W
Port Manatee Reef (Bay) - #17 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: June 3 2003
Primary Material: BRIDGE SPANS
Tonnage: 501.01
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 53" N 82° 34' 48" W
Port Manatee Reef (Bay) - #18 632 Tons Of Concrete Culverts And Pipes.
Date of Deployment: September 10 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 632
County: HILLSBOROUGH
Depth: 17 ft
[1]
Tides & Solunars
17 ft 27° 39' 44" N 82° 34' 45" W
Port Manatee Reef (Bay) - #2 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: November 6 2001
Primary Material: BRIDGE SPANS
Tonnage: 184.98
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 45" N 82° 34' 49" W
Port Manatee Reef (Bay) - #3 Concrete Bridge Decking Railings And Rubble From Pinellas Bayway Load
Date of Deployment: November 26 2001
Primary Material: BRIDGE SPANS
Tonnage: 166.48
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 48" N 82° 34' 47" W
Port Manatee Reef (Bay) - #4 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: July 1 2003
Primary Material: BRIDGE SPANS
Tonnage: 514.55
County: HILLSBOROUGH
Depth: 19 ft

Relief: 8 ft [1]
Tides & Solunars
19 ft 27° 39' 50" N 82° 34' 43" W
Port Manatee Reef (Bay) - #5 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: February 17 2004
Primary Material: BRIDGE SPANS
Tonnage: 266.04
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 47" N 82° 34' 49" W
Port Manatee Reef (Bay) - #6 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: February 1 2004
Primary Material: BRIDGE SPANS
Tonnage: 150.16
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 51" N 82° 34' 49" W
Port Manatee Reef (Bay) - #7 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: January 28 2004
Primary Material: BRIDGE SPANS
Tonnage: 354.18
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 46" N 82° 34' 47" W
Port Manatee Reef (Bay) - #8 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: January 23 2004
Primary Material: BRIDGE SPANS
Tonnage: 408.04
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 52" N 82° 34' 48" W
Port Manatee Reef (Bay) - #9 Concrete Bridge Decking Railings And Rubble From Treasure Island Causew
Date of Deployment: January 20 2004
Primary Material: BRIDGE SPANS
Tonnage: 408.04
County: HILLSBOROUGH
Depth: 21 ft

Relief: 8 ft [1]
Tides & Solunars
21 ft 27° 39' 44" N 82° 34' 40" W
Port Tampa Reef (Bay) - #1 Sixty Concrete Half Blocks 7 Inches X 7 Inches X 7 Inches
Date of Deployment: October 19 2000
Primary Material: CONCRETE RUBBLE
Tonnage: 0.25
County: HILLSBOROUGH
Depth: 24 ft

Relief: 2 ft [1]
Tides & Solunars
24 ft 27° 51' 38" N 82° 33' 47" W
Port Tampa Reef (Bay) - #2 Chamberlain H.S. Chief Reef 17 Modules Limestone Embedded In Concr
Date of Deployment: October 17 2002
Primary Material: MODULES LIMESTONE IN CONCRETE (17)
Tonnage: 0.85
County: HILLSBOROUGH
Depth: 21 ft

Relief: 1 ft [1]
Tides & Solunars
21 ft 27° 51' 42" N 82° 33' 48" W
Port Tampa Reef (Bay) - #3 Chamberlain High School Modules Project
Date of Deployment: September 25 2003
Primary Material: LIMESTONE IMBEDDED IN CONCRETE
Tonnage: 0.8
County: HILLSBOROUGH
Depth: 24 ft

Relief: 1 ft [1]
Tides & Solunars
24 ft 27° 51' 43" N 82° 33' 48" W
Port Tampa Reef (Bay) - #4 Concrete Bridge Decking Railings And Rubble From St. Pete Municpal Pier
Date of Deployment: May 28 2002
Primary Material: CONCRETE PILE CUTOFFS
Tonnage: 224.4
County: HILLSBOROUGH
Depth: 21 ft

Relief: 10 ft [1]
Tides & Solunars
21 ft 27° 51' 44" N 82° 33' 47" W
Port Tampa Reef (Bay) - #5 4 Steel Barges Bridge Rubble Concrete Pilings
Date of Deployment: March 21 1987
Primary Material: BARGES STEEL (4)
County: HILLSBOROUGH
Depth: 24 ft

Relief: 12 ft [1]
Tides & Solunars
24 ft 27° 51' 39" N 82° 33' 50" W
Port Tampa Reef (Bay) - #6 Annual Deployment On The Chamberlain High School Reef
Date of Deployment: September 22 1999
Primary Material: CONCRETE BLOCKS (50)
Tonnage: 0.25
County: HILLSBOROUGH
Depth: 24 ft

Relief: 12 ft [1]
Tides & Solunars
24 ft 27° 51' 38" N 82° 33' 47" W
Rube Allyn Reef - #1 2 Loads From 5/17/83 To 6/7/83 Fiberglass Boat Molds
Date of Deployment: June 7 1983
Primary Material: FIBERGLASS BOAT MOLD
County: PINELLAS [1]
Tides & Solunars
27° 55' 39" N 83° 1' 24" W
Rube Allyn Reef - #10 21.0 Yards. Of Concrete Culverts (6 Of 11 Loads)
Date of Deployment: November 27 1990
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 55' 34" N 83° 1' 27" W
Rube Allyn Reef - #11 18.0 Yards. Of Concrete Culverts (4 Of 11 Loads)
Date of Deployment: November 21 1990
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 55' 34" N 83° 1' 27" W
Rube Allyn Reef - #12 One 30’Lx 15’W X 13’H Barge
Date of Deployment: June 9 1999
Primary Material: BARGE STEEL 30’
Tonnage: 15
County: PINELLAS
Depth: 47 ft

Relief: 13 ft [1]
Tides & Solunars
47 ft 27° 56' 9" N 83° 1' 21" W
Rube Allyn Reef - #13 16 Pieces Of Concrete 15 To 48 Inch Sizes
Date of Deployment: July 23 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 31
County: PINELLAS
Depth: 48 ft

Relief: 14 ft [1]
Tides & Solunars
48 ft 27° 56' 8" N 83° 1' 20" W
Rube Allyn Reef - #14 Compacted Tire Units 176 Pieces 30 Tons 1550 Sq. Feet
Date of Deployment: August 30 1982
Primary Material: TIRE UNITS COMPACTED (176)
Tonnage: 30
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 56' 8" N 83° 1' 24" W
Rube Allyn Reef - #15 Compacted Tire Units 500 Sq. Feet Coverage
Date of Deployment: February 17 1983
Primary Material: TIRE UNITS
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 42" N 83° 1' 24" W
Rube Allyn Reef - #16 Compacted Tires Units 1240 Sq. Feet
Date of Deployment: August 31 1982
Primary Material: TIRE UNITS COMPACTED
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 39" N 83° 1' 24" W
Rube Allyn Reef - #17 1000 Square Feet Of Coverage
Date of Deployment: September 9 1982
Primary Material: TIRE UNITS COMPACTED
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 43" N 83° 1' 23" W
Rube Allyn Reef - #18 1000 Square Feet Of Coverage
Date of Deployment: September 17 1982
Primary Material: TIRE UNITS COMPACTED
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 43" N 83° 1' 23" W
Rube Allyn Reef - #19 Compacted Tire Units 600 Sq. Feet Coverage
Date of Deployment: February 1 1983
Primary Material: TIRE UNITS COMPACTED
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 42" N 83° 1' 24" W
Rube Allyn Reef - #2 Boat Molds And Culverts
Date of Deployment: July 10 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 44" N 83° 1' 21" W
Rube Allyn Reef - #20 Compacted Tire Units 650 Sq. Feet Coverage
Date of Deployment: April 27 1983
Primary Material: TIRE UNITS COMPACTED
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 45" N 83° 1' 22" W
Rube Allyn Reef - #21 7 - 12 X 30’ Steel Beams
Date of Deployment: October 22 2003
Primary Material: STEEL BEAMS (7)
Tonnage: 6
County: PINELLAS
Depth: 45 ft

Relief: 17 ft [1]
Tides & Solunars
45 ft 27° 55' 55" N 83° 1' 26" W
Rube Allyn Reef - #22 Fiberglass Boat Molds 300 Sq. Feet Coverage
Date of Deployment: December 20 1982
Primary Material: FIBERGLASS BOAT MOLDS
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 39" N 83° 1' 24" W
Rube Allyn Reef - #23 2- 41X18x8 1- 33X12x3 1- 41X18x3 100 Sq. Feet Coverage
Date of Deployment: June 1 1983
Primary Material: FIBERGLASS BOAT MOLDS (4)
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 41" N 83° 1' 25" W
Rube Allyn Reef - #24 3 Molds 15X8x1 50X16x8 25X10x2
Date of Deployment: June 1 1983
Primary Material: FIBERGLASS BOAT MOLDS (3)
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 39" N 83° 1' 23" W
Rube Allyn Reef - #25 37 X 8 X 4 Fiberglass Boat Molds
Date of Deployment: May 11 1983
Primary Material: FIBERGLASS BOAT MOLDS
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 43" N 83° 1' 23" W
Rube Allyn Reef - #26 30 X 10 X 3 Feet Fiberglass Boat Molds
Date of Deployment: May 12 1983
Primary Material: FIBERGLASS BOAT MOLDS (3)
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 43" N 83° 1' 23" W
Rube Allyn Reef - #27 37 X 8 X 4 Feet Fiberglass Boat Molds
Date of Deployment: May 18 1983
Primary Material: FIBERGLASS BOAT MOLDS
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 43" N 83° 1' 23" W
Rube Allyn Reef - #28 50 X 10 X 3 Feet Fiberglass Boat Molds
Date of Deployment: May 19 1983
Primary Material: FIBERGLASS BOAT MOLDS (3)
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 43" N 83° 1' 23" W
Rube Allyn Reef - #29 50 X 12 X 4 Feet 2 Units 75 Sq. Feet Coverage
Date of Deployment: May 24 1983
Primary Material: FIBERGLASS BOAT MOLDS (2)
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 43" N 83° 1' 23" W
Rube Allyn Reef - #3 Cement Sinkers Placed In Scattered Units 3 Feet Profile
Date of Deployment: July 3 1985
Primary Material: CONCRETE SINKERS
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 56' 13" N 83° 1' 17" W
Rube Allyn Reef - #30 50 X 15 X 10 Feet Fiberglass Boat Molds (3)
Date of Deployment: May 26 1983
Primary Material: FIBERGLASS BOAT MOLDS (3)
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 27° 55' 39" N 83° 1' 23" W
Rube Allyn Reef - #31 Concrete Culverts And Concrete Pilings.
Date of Deployment: April 4 1988
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 44 ft

Relief: 11 ft [1]
Tides & Solunars
44 ft 27° 55' 17" N 83° 1' 29" W
Rube Allyn Reef - #32 26 Separate Loads Of Concrete
Date of Deployment: April 3 1989
Primary Material: CONCRETE RUBBLE
County: PINELLAS
Depth: 53 ft
[1]
Tides & Solunars
53 ft 27° 55' 10" N 83° 1' 33" W
Rube Allyn Reef - #33 431 Culverts Next To Sand Key Bridge 16 Loads Began On 5/23/96
Date of Deployment: November 7 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 478
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 18" N 83° 1' 18" W
Rube Allyn Reef - #35 9 Pieces Culverts Various Sizes
Date of Deployment: April 21 2003
Primary Material: CONCRETE CULVERTS (9)
Tonnage: 26
County: PINELLAS
Depth: 43 ft

Relief: 12 ft [1]
Tides & Solunars
43 ft 27° 55' 55" N 83° 1' 25" W
Rube Allyn Reef - #36 26 Pieces Culverts Various Sizes
Date of Deployment: March 28 2002
Primary Material: CONCRETE CULVERTS (26)
Tonnage: 26
County: PINELLAS
Depth: 46 ft

Relief: 10 ft [1]
Tides & Solunars
46 ft 27° 55' 57" N 83° 1' 26" W
Rube Allyn Reef - #37 Placed On Southwest Corner Of Site
Date of Deployment: June 4 2002
Primary Material: CONCRETE CULVERTS (27)
Tonnage: 30.2
County: PINELLAS
Depth: 45 ft

Relief: 13 ft [1]
Tides & Solunars
45 ft 27° 55' 56" N 83° 1' 26" W
Rube Allyn Reef - #38 Placed On South Side Of Site
Date of Deployment: April 10 2002
Primary Material: CONCRETE CULVERTS (25)
Tonnage: 29
County: PINELLAS
Depth: 45 ft

Relief: 4 ft [1]
Tides & Solunars
45 ft 27° 55' 56" N 83° 1' 25" W
Rube Allyn Reef - #39 Placed On Southwest Corner Of Site
Date of Deployment: April 4 2002
Primary Material: CONCRETE CULVERTS (25)
Tonnage: 34.75
County: PINELLAS
Depth: 47 ft

Relief: 6 ft [1]
Tides & Solunars
47 ft 27° 55' 55" N 83° 1' 25" W
Rube Allyn Reef - #4 282 Culverts Next To Sand Key Bridge 9 Loads Began On 11/14/96
Date of Deployment: December 12 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 258
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 15" N 83° 1' 21" W
Rube Allyn Reef - #40 21 Pieces Culverts West Of Previous Drop
Date of Deployment: April 1 2002
Primary Material: CONCRETE CULVERTS (21)
Tonnage: 36.25
County: PINELLAS
Depth: 46 ft
[1]
Tides & Solunars
46 ft 27° 55' 57" N 83° 1' 26" W
Rube Allyn Reef - #41 24 Pieces Placed South Of Previous Drop
Date of Deployment: March 25 2002
Primary Material: CONCRETE CULVERTS OVALS (24)
Tonnage: 18
County: PINELLAS
Depth: 48 ft

Relief: 6 ft [1]
Tides & Solunars
48 ft 27° 55' 57" N 83° 1' 25" W
Rube Allyn Reef - #42 30 Pieces Stackedrube Allyn Reef South Side
Date of Deployment: March 19 2002
Primary Material: CONCRETE CUTOFFS
Tonnage: 21
County: PINELLAS
Depth: 48 ft

Relief: 5 ft [1]
Tides & Solunars
48 ft 27° 55' 56" N 83° 1' 25" W
Rube Allyn Reef - #5 20.2 Yards. Of Concrete Culverts (10 Of 11 Loads)
Date of Deployment: December 12 1990
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 55' 33" N 83° 1' 26" W
Rube Allyn Reef - #6 21 Yd. Of Concrete Culvert (11Th Of 11 Loads)
Date of Deployment: December 13 1990
Primary Material: CONCRETE RUBBLE
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 32" N 83° 1' 27" W
Rube Allyn Reef - #7 20.0 Yards. Of Concrete Culverts (9 Of 11 Loads)
Date of Deployment: December 11 1990
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 55' 34" N 83° 1' 27" W
Rube Allyn Reef - #8 16.0 Yards. Of Concrete Culverts (8 Of 11 Loads)
Date of Deployment: December 10 1990
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 55' 34" N 83° 1' 27" W
Rube Allyn Reef - #9 20.0 Yards. Of Concrete Culverts (7 Of 11 Loads)
Date of Deployment: November 29 1990
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 55' 34" N 83° 1' 27" W
Rube Allyn Reef - Sand Key Bridge One Of Four Loads Of Sand Key Bridge Non Grant 70000 Tons Total
Date of Deployment: December 31 1996
Primary Material: BRIDGE RUBBLE CONCRETE
County: PINELLAS
Depth: 43 ft

Relief: 25 ft [1]
Tides & Solunars
43 ft 27° 55' 15" N 83° 1' 25" W
Rube Allyn Reef - Zone F 173 Culverts In Sub Zone F Seven Loads Began On 2/12/96
Date of Deployment: February 21 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 135
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 15" N 83° 1' 29" W
Rube Allyn Reef - Zone F #2 67 Large Concrete Pieces Sub Zone F One Load
Date of Deployment: January 30 1996
Primary Material: CONCRETE PIECES
Tonnage: 353
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 15" N 83° 1' 29" W
Rube Allyn Reef - Zone F #3 14 Concrete Pilings Sub Zone F
Date of Deployment: November 7 1995
Primary Material: CONCRETE PILINGS
Tonnage: 23
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 19" N 83° 1' 29" W
Rube Allyn Reef - Zone F #4 14 Concrete Pilings Sub Zone F
Date of Deployment: November 2 1995
Primary Material: CONCRETE PILINGS
Tonnage: 23
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 19" N 83° 1' 29" W
Rube Allyn Reef - Zone F #5 21 Concrete Culverts Sub Zone F
Date of Deployment: April 9 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 37
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 19" N 83° 1' 29" W
Rube Allyn Reef - Zone G 38 Culverts In Sub Zone G
Date of Deployment: February 29 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 30
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 20" N 83° 1' 26" W
Rube Allyn Reef - Zone I 21 Concrete Culverts Sub Zone I
Date of Deployment: May 23 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 28
County: PINELLAS
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 55' 17" N 83° 1' 19" W
Sand Key Nourishment Reef #2 - 1 50 Pieces Culverts Various Sizes
Date of Deployment: March 17 2004
Primary Material: CONCRETE CULVERTS (50)
Tonnage: 25.83
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 27" N 82° 51' 14" W
Sand Key Nourishment Reef #2 - 10 34 Pieces Concrete Culverts Various Sizes
Date of Deployment: May 30 2004
Primary Material: CONCRETE CULVERTS (34)
Tonnage: 32
County: PINELLAS
Depth: 14 ft

Relief: 5 ft [1]
Tides & Solunars
14 ft 27° 53' 28" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 11 15 Pieces Power Poles Various Sizes
Date of Deployment: May 20 2004
Primary Material: CONCRETE POLES (15)
Tonnage: 24.5
County: PINELLAS
Depth: 15 ft

Relief: 2 ft [1]
Tides & Solunars
15 ft 27° 53' 29" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 12 30 Pieces Power Poles Various Sizes
Date of Deployment: May 17 2004
Primary Material: CONCRETE CUTOFFS (30)
Tonnage: 31.7
County: PINELLAS
Depth: 14 ft

Relief: 2 ft [1]
Tides & Solunars
14 ft 27° 53' 28" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 13 31 Pieces Culverts Various Sizes
Date of Deployment: May 13 2004
Primary Material: CONCRETE CULVERTS (31)
Tonnage: 17
County: PINELLAS
Depth: 16 ft

Relief: 4 ft [1]
Tides & Solunars
16 ft 27° 53' 29" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 14 18 Pieces Culverts Various Sizes
Date of Deployment: April 29 2004
Primary Material: CONCRETE CULVERTS (18)
Tonnage: 16.5
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 29" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 15 5 Pieces Culverts 54 X 8’
Date of Deployment: April 22 2004
Primary Material: CONCRETE CULVERTS (5)
Tonnage: 22
County: PINELLAS
Depth: 15 ft

Relief: 6 ft [1]
Tides & Solunars
15 ft 27° 53' 29" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 16 27 Pieces Culverts Various Sizes
Date of Deployment: April 6 2004
Primary Material: CONCRETE CULVERTS (27)
Tonnage: 14.3
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 29" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 17 4 Pieces Large Concrete Boxes
Date of Deployment: June 14 2004
Primary Material: CONCRETE BOXES (4)
Tonnage: 8
County: PINELLAS
Depth: 18 ft

Relief: 5 ft [1]
Tides & Solunars
18 ft 27° 53' 25" N 82° 51' 14" W
Sand Key Nourishment Reef #2 - 2 15 Pieces Culverts Various Sizes
Date of Deployment: February 3 2004
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 21.91
County: PINELLAS
Depth: 16 ft

Relief: 5 ft [1]
Tides & Solunars
16 ft 27° 53' 28" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 3 42 Pieces Culverts Various Sizes
Date of Deployment: March 1 2004
Primary Material: CONCRETE CULVERTS (42)
Tonnage: 30.5
County: PINELLAS
Depth: 15 ft

Relief: 6 ft [1]
Tides & Solunars
15 ft 27° 53' 29" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 4 29 Pieces Culverts Various Sizes
Date of Deployment: February 23 2004
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 19.86
County: PINELLAS
Depth: 15 ft

Relief: 4 ft [1]
Tides & Solunars
15 ft 27° 53' 28" N 82° 51' 14" W
Sand Key Nourishment Reef #2 - 5 27 Pieces Culverts Various Sizes
Date of Deployment: February 10 2004
Primary Material: CONCRETE CULVERTS (27)
Tonnage: 22.5
County: PINELLAS
Depth: 15 ft

Relief: 4 ft [1]
Tides & Solunars
15 ft 27° 53' 28" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 6 24 Pieces Culverts Various Sizes
Date of Deployment: February 4 2004
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 27
County: PINELLAS
Depth: 16 ft

Relief: 5 ft [1]
Tides & Solunars
16 ft 27° 53' 28" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 7 24 Pieces Culverts Various Sizes
Date of Deployment: February 5 2004
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 18.5
County: PINELLAS
Depth: 16 ft

Relief: 4 ft [1]
Tides & Solunars
16 ft 27° 53' 28" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 8 3 Large 4X4x4 Concrete Boxes
Date of Deployment: March 19 2004
Primary Material: CONCRETE BOXES (3)
Tonnage: 3
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 28" N 82° 51' 13" W
Sand Key Nourishment Reef #2 - 9 20 Pieces Culverts Various Sizes
Date of Deployment: March 16 2004
Primary Material: CONCRETE CULVERTS (20)
Tonnage: 21
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 29" N 82° 51' 14" W
Sand Key Nourishment Reef #3 - 1 21 Pieces Culverts Various Sizes
Date of Deployment: August 21 2003
Primary Material: CONCRETE CULVERTS (21)
Tonnage: 30.5
County: PINELLAS
Depth: 16 ft

Relief: 5 ft [1]
Tides & Solunars
16 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 10 29 Pieces Culverts Various Sizes
Date of Deployment: August 11 2003
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 22
County: PINELLAS
Depth: 18 ft

Relief: 5 ft [1]
Tides & Solunars
18 ft 27° 53' 32" N 82° 51' 12" W
Sand Key Nourishment Reef #3 - 11 21 Pieces Culverts Various Sizes
Date of Deployment: August 1 2003
Primary Material: CONCRETE CULVERTS (21)
Tonnage: 27.5
County: PINELLAS
Depth: 17 ft

Relief: 6 ft [1]
Tides & Solunars
17 ft 27° 53' 30" N 82° 51' 12" W
Sand Key Nourishment Reef #3 - 12 30 Pieces Culverts Various Sizes
Date of Deployment: September 2 2003
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 21.64
County: PINELLAS
Depth: 16 ft

Relief: 4 ft [1]
Tides & Solunars
16 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 13 28 Pieces Culverts Various Sizes
Date of Deployment: October 8 2003
Primary Material: CONCRETE CULVERTS (28)
Tonnage: 27
County: PINELLAS
Depth: 17 ft

Relief: 5 ft [1]
Tides & Solunars
17 ft 27° 53' 30" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 14 28 Pieces Culverts Various Sizes
Date of Deployment: September 29 2003
Primary Material: CONCRETE CULVERTS (28)
Tonnage: 30.4
County: PINELLAS
Depth: 17 ft

Relief: 5 ft [1]
Tides & Solunars
17 ft 27° 53' 30" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 15 24 Pieces Culverts Various Sizes
Date of Deployment: September 26 2003
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 14
County: PINELLAS
Depth: 18 ft

Relief: 4 ft [1]
Tides & Solunars
18 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 2 34 Pieces Concrete Cutoffs Various Sizes
Date of Deployment: September 17 2003
Primary Material: CONCRETE CUTOFFS (34)
Tonnage: 25
County: PINELLAS
Depth: 16 ft

Relief: 4 ft [1]
Tides & Solunars
16 ft 27° 53' 30" N 82° 51' 14" W
Sand Key Nourishment Reef #3 - 3 11 Pieces Culverts Various Sizes
Date of Deployment: September 23 2003
Primary Material: CONCRETE CULVERTS (11)
Tonnage: 31
County: PINELLAS
Depth: 17 ft

Relief: 5 ft [1]
Tides & Solunars
17 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 4 26 Pieces Culverts Various Sizes
Date of Deployment: August 26 2003
Primary Material: CONCRETE CULVERTS (26)
County: PINELLAS
Depth: 18 ft

Relief: 4 ft [1]
Tides & Solunars
18 ft 27° 53' 31" N 82° 51' 14" W
Sand Key Nourishment Reef #3 - 5 15 Pieces Culverts Various Sizes
Date of Deployment: September 24 2003
Primary Material: CONCRETE CULVERTS (15)
Tonnage: 25
County: PINELLAS
Depth: 17 ft

Relief: 5 ft [1]
Tides & Solunars
17 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 6 24 Pieces Culverts Various Sizes
Date of Deployment: August 20 2003
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 30.6
County: PINELLAS
Depth: 16 ft

Relief: 5 ft [1]
Tides & Solunars
16 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 7 26 Pieces Culverts Various Sizes
Date of Deployment: August 18 2003
Primary Material: CONCRETE CULVERTS (26)
Tonnage: 21.2
County: PINELLAS
Depth: 15 ft

Relief: 6 ft [1]
Tides & Solunars
15 ft 27° 53' 32" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 8 30 Pieces Culverts Various Sizes
Date of Deployment: August 13 2003
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 34.25
County: PINELLAS
Depth: 16 ft

Relief: 6 ft [1]
Tides & Solunars
16 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #3 - 9 35 Pieces Culverts Various Sizes
Date of Deployment: August 12 2003
Primary Material: CONCRETE CULVERTS (35)
Tonnage: 32.5
County: PINELLAS
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 53' 32" N 82° 51' 13" W
Sand Key Nourishment Reef #5 - 1 15 Steel Boxes 4’X2’x2’ 4 Pieces Culverts Various Sizes
Date of Deployment: July 10 2002
Primary Material: STEEL BOXES (15)
Tonnage: 9
County: PINELLAS
Depth: 20 ft

Relief: 4 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 10 Sand Key Nourishment Reef Project-
Date of Deployment: December 6 2001
Primary Material: CONCRETE CULVERTS (16)
Tonnage: 25.7
County: PINELLAS
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 27° 53' 41" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 11 26 Pieces Culverts Various Sizes
Date of Deployment: July 1 2002
Primary Material: CONCRETE CULVERTS (26)
Tonnage: 22.2
County: PINELLAS
Depth: 20 ft

Relief: 6 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 12 Sand Key Nourishment Reef Project-
Date of Deployment: December 17 2001
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 22.25
County: PINELLAS
Depth: 17 ft

Relief: 5 ft [1]
Tides & Solunars
17 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 13 Sand Key Nourishment Reef Project-
Date of Deployment: December 11 2001
Primary Material: CONCRETE CULVERTS (28)
Tonnage: 30.5
County: PINELLAS
Depth: 17 ft

Relief: 6 ft [1]
Tides & Solunars
17 ft 27° 53' 42" N 82° 51' 10" W
Sand Key Nourishment Reef #5 - 14 29 Pieces Culverts Various Sizes
Date of Deployment: June 14 2002
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 35
County: PINELLAS
Depth: 20 ft

Relief: 6 ft [1]
Tides & Solunars
20 ft 27° 53' 41" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 15 Sand Key Nourishment Reef Project-
Date of Deployment: December 7 2001
Primary Material: CONCRETE PILINGS (24)
Tonnage: 37
County: PINELLAS
Depth: 17 ft

Relief: 3 ft [1]
Tides & Solunars
17 ft 27° 53' 41" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 16 Sand Key Nourishment Reef Project-
Date of Deployment: November 30 2001
Primary Material: CONCRETE CULVERTS (12)
Tonnage: 27.5
County: PINELLAS
Depth: 20 ft

Relief: 4 ft [1]
Tides & Solunars
20 ft 27° 53' 43" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 17 Sand Key Nourishment Reef Project-
Date of Deployment: November 29 2001
Primary Material: CONCRETE CULVERTS (12)
Tonnage: 36.15
County: PINELLAS
Depth: 20 ft

Relief: 6 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 10" W
Sand Key Nourishment Reef #5 - 18 Sand Key Nourishment Reef Project-
Date of Deployment: November 21 2001
Primary Material: CONCRETE CULVERTS (21)
Tonnage: 28.22
County: PINELLAS
Depth: 18 ft

Relief: 5 ft [1]
Tides & Solunars
18 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 19 Sand Key Nourishment Reef Project-
Date of Deployment: November 1 2001
Primary Material: CONCRETE CULVERTS (37)
Tonnage: 32.8
County: PINELLAS
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 2 24 Pieces Culverts Various Sizes And Slabs
Date of Deployment: July 11 2002
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 30
County: PINELLAS
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 20 Sand Key Nourishment Reef Project-
Date of Deployment: October 15 2001
Primary Material: CONCRETE CULVERTS (24)
Tonnage: 33.2
County: PINELLAS
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 21 Sand Key Nourishment Reef Project-
Date of Deployment: October 25 2001
Primary Material: CONCRETE CULVERTS (23)
Tonnage: 33.5
County: PINELLAS
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 22 Sand Key Nourishment Reef Project-
Date of Deployment: November 6 2001
Primary Material: CONCRETE CULVERTS (16)
Tonnage: 19.36
County: PINELLAS
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 23 Sand Key Nourishment Reef Project-
Date of Deployment: November 2 2001
Primary Material: CONCRETE CULVERTS (8)
Tonnage: 16.55
County: PINELLAS
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 3 25 Pieces Culverts Various Sizes
Date of Deployment: July 23 2002
Primary Material: CONCRETE CULVERTS (25)
Tonnage: 22.5
County: PINELLAS
Depth: 20 ft

Relief: 6 ft [1]
Tides & Solunars
20 ft 27° 53' 41" N 82° 51' 11" W
Sand Key Nourishment Reef #5 - 4 22 Pieces Culverts Various Sizes
Date of Deployment: May 22 2003
Primary Material: CONCRETE CULVERTS (22)
Tonnage: 30
County: PINELLAS
Depth: 16 ft

Relief: 5 ft [1]
Tides & Solunars
16 ft 27° 53' 31" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 5 20 Pieces Culverts Various Sizes
Date of Deployment: May 21 2003
Primary Material: CONCRETE CULVERTS (20)
Tonnage: 28
County: PINELLAS
Depth: 16 ft

Relief: 4 ft [1]
Tides & Solunars
16 ft 27° 53' 31" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 6 20 Pieces Culverts Various Sizes
Date of Deployment: April 28 2003
Primary Material: CONCRETE CULVERTS (20)
Tonnage: 10
County: PINELLAS
Depth: 17 ft

Relief: 3 ft [1]
Tides & Solunars
17 ft 27° 53' 31" N 82° 51' 13" W
Sand Key Nourishment Reef #5 - 7 19 Pieces Culverts Various Sizes
Date of Deployment: August 1 2002
Primary Material: CONCRETE CULVERTS (19)
Tonnage: 25.7
County: PINELLAS
Depth: 17 ft

Relief: 6 ft [1]
Tides & Solunars
17 ft 27° 53' 41" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 8 34 Pieces Culverts Various Sizes
Date of Deployment: June 13 2002
Primary Material: CONCRETE CULVERTS (34)
Tonnage: 37.9
County: PINELLAS
Depth: 20 ft

Relief: 6 ft [1]
Tides & Solunars
20 ft 27° 53' 42" N 82° 51' 12" W
Sand Key Nourishment Reef #5 - 9 34 Pieces Culverts Various Sizes
Date of Deployment: June 11 2002
Primary Material: CONCRETE CULVERTS (34)
Tonnage: 41
County: PINELLAS
Depth: 19 ft

Relief: 6 ft [1]
Tides & Solunars
19 ft 27° 53' 42" N 82° 51' 12" W
Sand Key Nourishment Reef - #1 Sand Key Nourishment Reef Project
Date of Deployment: September 20 2001
Primary Material: CONCRETE CULVERTS (10)
Tonnage: 14.1
County: PINELLAS
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 27° 53' 49" N 82° 51' 10" W
Sand Key Nourishment Reef - #10 3630 2418 And 12 Diameter Culverts At Site Imr#1
Date of Deployment: November 1 2004
Primary Material: CONCRETE CULVERTS (28)
Tonnage: 24.2
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 25" N 82° 51' 14" W
Sand Key Nourishment Reef - #12 Sand Key Nourishment Reef Project-
Date of Deployment: October 8 2001
Primary Material: CONCRETE CULVERTS (25)
Tonnage: 27.79
County: PINELLAS
Depth: 18 ft

Relief: 6 ft [1]
Tides & Solunars
18 ft 27° 53' 42" N 82° 51' 11" W
Sand Key Nourishment Reef - #2 Sand Key Nourishment Reef Project
Date of Deployment: September 24 2001
Primary Material: CONCRETE CULVERTS (8)
Tonnage: 20
County: PINELLAS
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 27° 53' 49" N 82° 51' 10" W
Sand Key Nourishment Reef - #3 Sand Key Nourishment Reef Project-1Mr6
Date of Deployment: September 26 2001
Primary Material: CONCRETE CULVERTS (24)
County: PINELLAS
Depth: 18 ft

Relief: 5 ft [1]
Tides & Solunars
18 ft 27° 53' 48" N 82° 51' 11" W
Sand Key Nourishment Reef - #4 Three Loads Same Numbers Also 11/9/2004 And 11/10/2004
Date of Deployment: November 8 2004
Primary Material: CONCRETE CULVERTS (65)
Tonnage: 69.59
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 25" N 82° 51' 14" W
Sand Key Nourishment Reef - #5 3630 Diameter Culverts At Site Imr#1
Date of Deployment: October 29 2004
Primary Material: CONCRETE CULVERTS (12)
Tonnage: 25
County: PINELLAS
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 53' 25" N 82° 51' 14" W
Sand Key Nourishment Reef - #6 4 Deployment Dates Same Location Also 8-19 8-23 And 8-24
Date of Deployment: August 25 2004
Primary Material: CONCRETE POWER POLES (105)
Tonnage: 100.25
County: PINELLAS
Depth: 20 ft

Relief: 4 ft [1]
Tides & Solunars
20 ft 27° 53' 25" N 82° 51' 14" W
Sand Key Nourishment Reef - #7 3630 Diameter Culverts At Site Imr#1
Date of Deployment: October 21 2004
Primary Material: CONCRETE CULVERTS (13)
Tonnage: 16.4
County: PINELLAS
Depth: 18 ft

Relief: 5 ft [1]
Tides & Solunars
18 ft 27° 53' 25" N 82° 51' 14" W
Sand Key Nourishment Reef - #8 3630 2418 And 15 Diameter Culverts At Site Imr#1
Date of Deployment: August 31 2004
Primary Material: CONCRETE CULVERTS (27)
Tonnage: 23.36
County: PINELLAS
Depth: 18 ft

Relief: 5 ft [1]
Tides & Solunars
18 ft 27° 53' 24" N 82° 51' 15" W
Sand Key Nourishment Reef - #9 2418 And 15 Diameter Culverts At Site Imr#1
Date of Deployment: August 30 2004
Primary Material: CONCRETE CULVERTS (40)
Tonnage: 24.8
County: PINELLAS
Depth: 18 ft

Relief: 4 ft [1]
Tides & Solunars
18 ft 27° 53' 24" N 82° 51' 15" W
Shrimp Boat Reef Steel Hulled Shrimpboat And Concrete Sinkers 80 X 25 X 29 Tall
Date of Deployment: December 8 2004
Primary Material: SHIP STEEL SHRIMPBOAT 80’
County: PINELLAS
Depth: 97 ft

Relief: 39 ft [1]
Tides & Solunars
97 ft 27° 41' 45" N 83° 17' 33" W
Southeast Tampa 04-12 Bay Mini.Lo-Pro And Table Top Balls
Date of Deployment: February 6 2004
Primary Material: MODULES CONCRETE REEFBALLS(81)
Tonnage: 32.9
County: MANATEE
Depth: 14 ft

Relief: 3 ft [1]
Tides & Solunars
14 ft 27° 32' 55" N 82° 40' 17" W
St. Pete Beach Site 3 Loads From 3/7/83 To 4/6/83 Three Other Sites Same Grant
Date of Deployment: April 6 1983
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 40' 36" N 82° 51' 45" W
St. Pete Beach Site Pinellas Tank #10
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 37" N 82° 51' 48" W
St. Pete Beach Site Pinellas Tank #6
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 41" N 82° 51' 49" W
St. Pete Beach Site Pinellas Tank #5
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 41" N 82° 51' 49" W
St. Pete Beach Site Pinellas Tank #9
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 43" N 82° 51' 50" W
St. Pete Beach Site Pinellas Tank #4
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 43" N 82° 51' 50" W
St. Pete Beach Site Pinellas Tank #7
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 43" N 82° 51' 49" W
St. Pete Beach Site Pinellas Tank #3
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 43" N 82° 51' 50" W
St. Pete Beach Site Pinellas Tank #8
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 43" N 82° 51' 49" W
St. Pete Beach Site Pinellas Tank #2
Date of Deployment: April 22 1995
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: PINELLAS
Depth: 25 ft
[1]
Tides & Solunars
25 ft 27° 40' 44" N 82° 51' 50" W
St. Petersburg Bay Reef Portions Of Gandy Bridge Boat Hulls And Concrete Debris
Date of Deployment: December 31 1995
Primary Material: BRIDGE RUBBLE
County: PINELLAS
Depth: 34 ft

Relief: 14 ft [1]
Tides & Solunars
34 ft 27° 47' 8" N 82° 35' 52" W
Tarpon Key Oyster Reef - Site 1 980 Bags Of Fossilized Locally Mined Shell Near Shore ~ 255 Ft 2/19/05
Date of Deployment: February 18 2005
Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS
County: PINELLAS
Depth: 1 ft

Relief: 2 ft [1]
Tides & Solunars
1 ft 27° 39' 56" N 82° 41' 43" W
Tarpon Key Oyster Reef - Site 2 535 Bags Of Fossilized Locally Mined Shell Near Shore ~ 275 Ft 3/5/05
Date of Deployment: March 5 2005
Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS
County: PINELLAS
Depth: 1 ft

Relief: 2 ft [1]
Tides & Solunars
1 ft 27° 40' 4" N 82° 41' 24" W
Tarpon Key Oyster Reef - Site 3 535 Bags Of Fossilized Locally Mined Shell Near Shore ~ 275 Ft 3/5/05
Date of Deployment: March 4 2005
Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS
County: PINELLAS
Depth: 1 ft

Relief: 2 ft [1]
Tides & Solunars
1 ft 27° 40' 4" N 82° 41' 24" W
Tarpon Springs Reef - Site 1 Fiberglass Boat Molds 350 Sq. Feet Coverage
Date of Deployment: December 14 1982
Primary Material: FIBERGLASS BOAT MOLDS
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 8' 7" N 82° 55' 57" W
Tarpon Springs Reef - Site 10 7Th Of 8 Loads This Grant And This Site
Date of Deployment: July 1 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 15" N 82° 55' 45" W
Tarpon Springs Reef - Site 11 2Nd Of 8 Loads This Grant And This Site
Date of Deployment: June 3 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 8" N 82° 55' 52" W
Tarpon Springs Reef - Site 2 Fiberglass Boat Molds 350 Sq. Feet Coverage
Date of Deployment: December 9 1982
Primary Material: FIBERGLASS BOAT MOLDS
County: PINELLAS
Depth: 28 ft
[1]
Tides & Solunars
28 ft 28° 8' 11" N 82° 55' 48" W
Tarpon Springs Reef - Site 3 1Rst Of 8 Loads This Grant And This Site
Date of Deployment: April 24 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 31" N 82° 56' 7" W
Tarpon Springs Reef - Site 4 Concrete Culverts And Pyramids
Date of Deployment: December 31 1987
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 15" N 82° 55' 49" W
Tarpon Springs Reef - Site 5 8Th Of 8 Loads This Grant And This Site
Date of Deployment: July 8 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 14" N 82° 55' 45" W
Tarpon Springs Reef - Site 6 6Th Of 8 Loads This Grant And This Site
Date of Deployment: June 24 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 12" N 82° 55' 46" W
Tarpon Springs Reef - Site 8 4Th Of 8 Loads This Grant And This Site
Date of Deployment: June 10 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 15" N 82° 55' 44" W
Tarpon Springs Reef - Site 9 3Rd Of 8 Loads This Grant And This Site
Date of Deployment: June 6 1985
Primary Material: CONCRETE SINKERS
County: PINELLAS
Depth: 26 ft
[1]
Tides & Solunars
26 ft 28° 8' 12" N 82° 55' 46" W
The Bulkhead Reef04-12 Bay Mini.Lo-Pro And Table Top Balls
Date of Deployment: February 6 2004
Primary Material: MODULES CONCRETE REEFBALLS(85)
Tonnage: 33.86
County: MANATEE
Depth: 15 ft

Relief: 3 ft [1]
Tides & Solunars
15 ft 27° 33' 12" N 82° 42' 22" W
Treasure Island Reef - #1 New Area Will Monitor Progress 1Rst Of 3 Loads This Site
Date of Deployment: May 6 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 45' 8" N 82° 53' 14" W
Treasure Island Reef - #2 New Area Will Monitor Progress 2Nd Of 3 Loads This Site
Date of Deployment: June 5 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS [1]
Tides & Solunars
27° 46' 35" N 82° 54' 46" W
Treasure Island Reef - #3 New Area Will Monitor Progress 3Rd Of 3 Loads This Site
Date of Deployment: June 17 1985
Primary Material: CONCRETE CULVERTS
County: PINELLAS
Depth: 29 ft
[1]
Tides & Solunars
29 ft 27° 45' 10" N 82° 53' 14" W
Veterans Reef - Reef Center Steel Barge Upright 14 Feet East Of 8-2-99 Barge
Date of Deployment: August 4 1999
Primary Material: BARGE STEEL
County: PINELLAS
Depth: 42 ft

Relief: 7 ft [1]
Tides & Solunars
42 ft 28° 2' 59" N 83° 0' 44" W
Veterans Reef - Site 1 1 Large 1 Small Steel Cargo Boxes With 4 Pieces 24 X 4’ Culvert
Date of Deployment: January 17 2000
Primary Material: STEEL CONTAINERS
Tonnage: 8
County: PINELLAS
Depth: 44 ft

Relief: 8 ft [1]
Tides & Solunars
44 ft 28° 2' 38" N 83° 0' 45" W
Veterans Reef - Site 10 27Pieces Concrete Manholes Various Sizes
Date of Deployment: September 10 2003
Primary Material: CONCRETE MANHOLES (27)
Tonnage: 23.5
County: PINELLAS
Depth: 44 ft

Relief: 5 ft [1]
Tides & Solunars
44 ft 28° 2' 55" N 83° 0' 49" W
Veterans Reef - Site 11 28 Pieces Culverts Various Sizes
Date of Deployment: September 9 2003
Primary Material: CONCRETE CULVERTS (28)
Tonnage: 32
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 50" W
Veterans Reef - Site 12 16 Pieces Of Concrete Pilings Various Sizes
Date of Deployment: February 11 2004
Primary Material: CONCRETE PILINGS (16)
Tonnage: 21.2
County: PINELLAS
Depth: 43 ft

Relief: 7 ft [1]
Tides & Solunars
43 ft 28° 2' 55" N 83° 0' 48" W
Veterans Reef - Site 13 18 Pieces Concrete Cutoffs Various Sizes
Date of Deployment: September 22 2003
Primary Material: CONCRETE CUTOFFS (18)
Tonnage: 29
County: PINELLAS
Depth: 44 ft

Relief: 5 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 49" W
Veterans Reef - Site 14 29 Pieces Culverts Various Sizes
Date of Deployment: November 24 2003
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 26.12
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 49" W
Veterans Reef - Site 15 25 Pieces Concrete Culverts And 8 Slabs Various Sizes
Date of Deployment: November 5 2003
Primary Material: CONCRETE CULVERTS (25)
Tonnage: 30.7
County: PINELLAS
Depth: 44 ft

Relief: 7 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 50" W
Veterans Reef - Site 16 22 Pieces Concrete Slabs Various Sizes
Date of Deployment: October 27 2003
Primary Material: CONCRETE SLABS (22)
Tonnage: 29.4
County: PINELLAS
Depth: 44 ft

Relief: 7 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 49" W
Veterans Reef - Site 17 34 Pieces Concrete Culverts Various Sizes
Date of Deployment: October 21 2003
Primary Material: CONCRETE CULVERTS (34)
Tonnage: 32.7
County: PINELLAS
Depth: 44 ft

Relief: 7 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 50" W
Veterans Reef - Site 18 41 Pieces Concrete Culverts Various Sizes
Date of Deployment: October 14 2003
Primary Material: CONCRETE CUTOFFS (41)
Tonnage: 33.6
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 49" W
Veterans Reef - Site 19 17 Pieces Concrete Boxes
Date of Deployment: May 5 2004
Primary Material: CONCRETE BOXES (17)
Tonnage: 24
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 51" W
Veterans Reef - Site 2 2 Steel Cargo Boxes (Roll-Off Containers)
Date of Deployment: January 26 2000
Primary Material: STEEL CONTAINERS
Tonnage: 8
County: PINELLAS
Depth: 44 ft

Relief: 8 ft [1]
Tides & Solunars
44 ft 28° 2' 38" N 83° 0' 45" W
Veterans Reef - Site 20 29 Pieces Concrete Culverts Various Sizes Concrete Cut Offs
Date of Deployment: June 10 2004
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 25
County: PINELLAS
Depth: 45 ft

Relief: 6 ft [1]
Tides & Solunars
45 ft 28° 2' 55" N 83° 0' 50" W
Veterans Reef - Site 21 25 Pieces Concrete Culverts Various Sizes Concrete Slabs
Date of Deployment: June 9 2004
Primary Material: CONCRETE CULVERTS (25)
Tonnage: 33
County: PINELLAS
Depth: 42 ft

Relief: 8 ft [1]
Tides & Solunars
42 ft 28° 2' 57" N 83° 0' 50" W
Veterans Reef - Site 22 28 Pieces Concrete Culverts Various Sizes
Date of Deployment: June 3 2004
Primary Material: CONCRETE CULVERTS (28)
Tonnage: 22
County: PINELLAS
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 28° 2' 57" N 83° 0' 49" W
Veterans Reef - Site 23 17 Pieces Culverts Various Sizes
Date of Deployment: May 10 2004
Primary Material: CONCRETE CULVERTS (11)
Tonnage: 23.2
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 55" N 83° 0' 50" W
Veterans Reef - Site 24 8 Pieces Concrete Cutoffs And Slabs
Date of Deployment: April 23 2004
Primary Material: CONCRETE PILINGS (8)
Tonnage: 31.95
County: PINELLAS
Depth: 44 ft

Relief: 7 ft [1]
Tides & Solunars
44 ft 28° 1' 60" N 83° 0' 0" W
Veterans Reef - Site 25 14 Pieces Of Concrete Pilings And 2 Junction Boxes
Date of Deployment: April 20 2004
Primary Material: CONCRETE PILINGS (14)
Tonnage: 26.3
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 49" W
Veterans Reef - Site 26 32 Pieces Of Concrete Pilings Various Sizes
Date of Deployment: April 19 2004
Primary Material: CONCRETE PILINGS (32)
Tonnage: 35.5
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 55" N 83° 0' 49" W
Veterans Reef - Site 27 29 Pieces Culverts Various Sizes
Date of Deployment: April 8 2004
Primary Material: CONCRETE CULVERTS (29)
Tonnage: 22
County: PINELLAS
Depth: 44 ft

Relief: 9 ft [1]
Tides & Solunars
44 ft 28° 2' 55" N 83° 0' 48" W
Veterans Reef - Site 28 14 Pieces Culverts Various Sizes And 8 Concrete Slabs
Date of Deployment: May 11 2004
Primary Material: CONCRETE CULVERTS (14)
Tonnage: 28
County: PINELLAS
Depth: 42 ft

Relief: 6 ft [1]
Tides & Solunars
42 ft 28° 2' 57" N 83° 0' 50" W
Veterans Reef - Site 29 17 Poles And 2 Boxes
Date of Deployment: August 18 2000
Primary Material: CONCRETE POWER POLES
Tonnage: 21.5
County: PINELLAS
Depth: 44 ft

Relief: 5 ft [1]
Tides & Solunars
44 ft 28° 2' 52" N 83° 0' 43" W
Veterans Reef - Site 3 2 Cargo Boxes 7.5’ H X 22’L X 8’ W
Date of Deployment: January 29 2001
Primary Material: STEEL CONTAINERS
Tonnage: 8
County: PINELLAS
Depth: 44 ft

Relief: 8 ft [1]
Tides & Solunars
44 ft 28° 2' 40" N 83° 0' 44" W
Veterans Reef - Site 30 4 Large Pieces Of Culverts
Date of Deployment: September 11 2000
Primary Material: CONCRETE CULVERT
Tonnage: 29
County: PINELLAS
Depth: 44 ft

Relief: 5 ft [1]
Tides & Solunars
44 ft 28° 3' 2" N 83° 0' 44" W
Veterans Reef - Site 31 Various Sizes Of Culverts
Date of Deployment: September 12 2000
Primary Material: CONCRETE CULVERT
Tonnage: 35.5
County: PINELLAS
Depth: 44 ft

Relief: 11 ft [1]
Tides & Solunars
44 ft 28° 3' 1" N 83° 0' 44" W
Veterans Reef - Site 32 18 Pieces Of Oval Culverts 18 X 36 And 12 X 18
Date of Deployment: September 21 2000
Primary Material: CONCRETE CULVERT
Tonnage: 22
County: PINELLAS
Depth: 44 ft

Relief: 12 ft [1]
Tides & Solunars
44 ft 28° 3' 2" N 83° 0' 45" W
Veterans Reef - Site 33 20 Pieces Of Culvert On Top Of Single Aircraft Wing
Date of Deployment: October 5 2000
Primary Material: CONCRETE CULVERT
Tonnage: 19
County: PINELLAS
Depth: 44 ft

Relief: 10 ft [1]
Tides & Solunars
44 ft 28° 2' 52" N 83° 0' 45" W
Veterans Reef - Site 4 2 Small Steel Cargo Boxes And 2 Rubble Boxes
Date of Deployment: November 16 2000
Primary Material: STEEL CONTAINERS
Tonnage: 15
County: PINELLAS
Depth: 44 ft

Relief: 8 ft [1]
Tides & Solunars
44 ft 28° 2' 39" N 83° 0' 44" W
Veterans Reef - Site 5 Steel Hulled Lash Barge And Misc Concrete
Date of Deployment: November 30 2004
Primary Material: BARGE STEEL 60’
Tonnage: 7.5
County: PINELLAS
Depth: 40 ft

Relief: 14 ft [1]
Tides & Solunars
40 ft 28° 2' 58" N 83° 0' 51" W
Veterans Reef - Site 6 180’ X 30’ X 10’ Barge With P2v-3 Bomber Cabled To It
Date of Deployment: July 2 2000
Primary Material: BARGE
Tonnage: 270
County: PINELLAS
Depth: 44 ft
[1]
Tides & Solunars
44 ft 28° 2' 51" N 83° 0' 43" W
Veterans Reef - Site 7 16Pieces Concrete Manholes Various Sizes
Date of Deployment: September 16 2003
Primary Material: CONCRETE MANHOLES (16)
Tonnage: 20.3
County: PINELLAS
Depth: 43 ft

Relief: 8 ft [1]
Tides & Solunars
43 ft 28° 2' 56" N 83° 0' 50" W
Veterans Reef - Site 8 31 Pieces Concrete Cutoffs Various Sizes
Date of Deployment: September 15 2003
Primary Material: CONCRETE CUTOFFS (31)
Tonnage: 25
County: PINELLAS
Depth: 44 ft

Relief: 4 ft [1]
Tides & Solunars
44 ft 28° 2' 56" N 83° 0' 50" W
Veterans Reef - Site 9 14 Pieces Concrete Manholes Various Sizes
Date of Deployment: September 12 2003
Primary Material: CONCRETE MANHOLES (14)
Tonnage: 25
County: PINELLAS
Depth: 44 ft

Relief: 6 ft [1]
Tides & Solunars
44 ft 28° 2' 54" N 83° 0' 49" W
Whiskey Stump Key Oyster Reef Covering 250’ L X 5’ ’W X 1.3’ H Of Shoreline
Date of Deployment: April 23 2005
Primary Material: FOSSILIZED LOCALLY MINED SHELL BAGS
Tonnage: 23
County: HILLSBOROUGH
Depth: 3 ft

Relief: 1 ft [1]
Tides & Solunars
3 ft 27° 48' 53" N 82° 24' 7" W