St. Johns County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Barge Site 1750 Tons Of Concrete Culverts And Other Precast Concrete.
Date of Deployment: April 16 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 1750
County: ST. JOHNS
Depth: 81 ft

Relief: 8 ft [1]
Tides & Solunars
81 ft 29° 53' 37" N 80° 58' 28" W
Capo Reef North Large Pre-Cast Concrete Boxes 2 Of 2 Deployments This Date
Date of Deployment: June 29 2000
Primary Material: CONCRETE JUNCTION BOXES
Tonnage: 374
County: ST. JOHNS
Depth: 97 ft

Relief: 11 ft [1]
Tides & Solunars
97 ft 29° 51' 4" N 80° 46' 2" W
Capo Reef South Large Pre-Cast Concrete Boxes 1 Of 2 Deployments This Date
Date of Deployment: June 29 2000
Primary Material: CONCRETE JUNCTION BOXES
Tonnage: 374
County: ST. JOHNS
Depth: 97 ft

Relief: 11 ft [1]
Tides & Solunars
97 ft 29° 50' 59" N 80° 46' 1" W
Desco Boat Culverts 2000 Tons Concrete Culverts And Other Pieces
Date of Deployment: December 31 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: ST. JOHNS
Depth: 78 ft
[1]
Tides & Solunars
78 ft 29° 53' 22" N 81° 0' 49" W
Desco Wreck Reef 2000 Tons Of Concrete Culverts And Other Precast Concrete.
Date of Deployment: June 3 1987
Primary Material: CONCRETE CULVERTS
Tonnage: 2000
County: ST. JOHNS
Depth: 85 ft

Relief: 6 ft [1]
Tides & Solunars
85 ft 29° 53' 13" N 81° 0' 41" W
Dorothy Louise Barge 175 Foot Steel Barge
Date of Deployment: December 31 1988
Primary Material: BARGE STEEL 175’
Tonnage: 2000
County: ST. JOHNS
Depth: 70 ft
[1]
Tides & Solunars
70 ft 29° 56' 18" N 80° 57' 24" W
High School Reef Pallet Reef Balls-2000 Pounds
Date of Deployment: June 30 2001
Primary Material: MODULES CONCRETE REEFBALLS (8)
County: ST. JOHNS
Depth: 60 ft

Relief: 4 ft [1]
Tides & Solunars
60 ft 30° 3' 36" N 81° 6' 20" W
High School Reef-2 151 Reefballs High School Project
Date of Deployment: June 24 2003
Primary Material: MODULES CONCREET REEFBALLS(151)
Tonnage: 262.3
County: ST. JOHNS
Depth: 54 ft

Relief: 4 ft [1]
Tides & Solunars
54 ft 30° 3' 38" N 81° 6' 27" W
Inner Airplane Site 2000 Tons Of Concrete Culverts And 35’ Lst Boat.
Date of Deployment: June 23 1988
Primary Material: CONCRETE CULVERTS
Tonnage: 2000
County: ST. JOHNS
Depth: 84 ft

Relief: 8 ft [1]
Tides & Solunars
84 ft 29° 50' 59" N 80° 58' 51" W
Intruder Reef - #1 17 Numbered Pieces Of A-6 Intruder Airplanes 2Nd Of Two Loads
Date of Deployment: June 21 1995
Primary Material: AIRPLANE FRAMES A6’S
County: ST. JOHNS
Depth: 104 ft

Relief: 8 ft [1]
Tides & Solunars
104 ft 29° 54' 20" N 80° 48' 10" W
Intruder Reef - #2 23 Pieces Of A-6 Aircraft 1 1St Of Two Loads 33 Total
Date of Deployment: June 16 1995
Primary Material: AIRPLANE FRAMES A6’S
County: ST. JOHNS
Depth: 105 ft

Relief: 8 ft [1]
Tides & Solunars
105 ft 29° 54' 11" N 80° 45' 1" W
Moody Reef 26 Miles East Of St. Augustine Inlet
Date of Deployment: June 8 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 2500
County: ST. JOHNS
Depth: 100 ft

Relief: 8 ft [1]
Tides & Solunars
100 ft 29° 59' 8" N 80° 51' 16" W
Navy Drydock 615 Foot Long Navy Drydock
Date of Deployment: December 31 1989
Primary Material: STEEL DRYDOCK 615’
Tonnage: 2500
County: ST. JOHNS
Depth: 125 ft
[1]
Tides & Solunars
125 ft 30° 7' 36" N 80° 33' 34" W
Nine Mile North Reef Concrete Culverts
Date of Deployment: December 31 1983
Primary Material: CONCRETE CULVERTS
County: ST. JOHNS
Depth: 56 ft
[1]
Tides & Solunars
56 ft 29° 54' 47" N 81° 7' 1" W
Nine Mile Reef Wreck Of A Small Tugboat The Leon Roddy
Date of Deployment: December 31 1973
Primary Material: SHIP STEEL TUGBOAT
County: ST. JOHNS
Depth: 63 ft
[1]
Tides & Solunars
63 ft 29° 53' 30" N 81° 7' 54" W
North 9 Mile Reef Site 175 Dumpsters 1650 Yards. Concrete Pipes
Date of Deployment: December 1 1983
Primary Material: CONCRETE CULVERTS
County: ST. JOHNS
Depth: 56 ft
[1]
Tides & Solunars
56 ft 29° 53' 58" N 81° 7' 10" W
North Nine Mile Reef - Site 1 450 Tons Of Concrete First Of Two Drops Same Load Same Day
Date of Deployment: June 24 1997
Primary Material: CONCRETE RUBBLE
Tonnage: 450
County: ST. JOHNS
Depth: 80 ft

Relief: 10 ft [1]
Tides & Solunars
80 ft 29° 54' 40" N 81° 7' 11" W
North Nine Mile Reef - Site 2 450 Tons Of Concrete Second Of Two Drops Same Load Same Day
Date of Deployment: June 24 1997
Primary Material: CONCRETE RUBBLE
Tonnage: 450
County: ST. JOHNS
Depth: 80 ft

Relief: 10 ft [1]
Tides & Solunars
80 ft 29° 54' 43" N 81° 7' 15" W
North Nine Mile Reef - Site 3 Metal Dumpsters Second Of Three Drops Same Day
Date of Deployment: July 27 1982
Primary Material: STEEL DUMPSTERS
County: ST. JOHNS [1]
Tides & Solunars
29° 54' 40" N 81° 7' 29" W
North Nine Mile Reef - Site 4 Metal Dumpsters Third Of Three Drops Same Day
Date of Deployment: July 27 1982
Primary Material: STEEL DUMPSTERS
County: ST. JOHNS [1]
Tides & Solunars
29° 54' 0" N 81° 7' 25" W
North Nine Mile Reef - Site 5 Metal Dumpsters First Of Three Drops This Load Day
Date of Deployment: July 27 1982
Primary Material: STEEL DUMPSTERS
County: ST. JOHNS [1]
Tides & Solunars
29° 54' 6" N 81° 7' 24" W
North Nine Mile Reef - Site 6 Metal Dumpsters
Date of Deployment: July 28 1982
Primary Material: STEEL DUMPSTERS
County: ST. JOHNS [1]
Tides & Solunars
29° 54' 0" N 81° 7' 25" W
North Nine Mile Reef - Site 7 Concrete Culverts
Date of Deployment: December 31 1983
Primary Material: CONCRETE CULVERTS
County: ST. JOHNS
Depth: 56 ft
[1]
Tides & Solunars
56 ft 29° 54' 43" N 81° 7' 22" W
Osj Site - Drydocks 615 Feet Long By 127 Ft. Wide And 57 Feet Tall Wood And Steel Drydocks
Date of Deployment: September 13 1989
Primary Material: STEEL DRYDOCK
County: DUVAL
Depth: 125 ft
[1]
Tides & Solunars
125 ft 30° 7' 4" N 80° 33' 34" W
Outer Plane Reef-Boat Molds Fiberglass Boat Molds Deployed Sometime In 1993
Date of Deployment: December 31 1993
Primary Material: FIBERGLASS BOAT MOLDS
County: ST. JOHNS
Depth: 85 ft
[1]
Tides & Solunars
85 ft 29° 49' 46" N 80° 56' 26" W
Outer Plane Reef-Boat Molds Fiberglass Boat Molds Deployed Sometime In 1991
Date of Deployment: December 31 1991
Primary Material: FIBERGLASS BOAT MOLDS
County: ST. JOHNS
Depth: 78 ft
[1]
Tides & Solunars
78 ft 29° 50' 44" N 80° 57' 7" W
Outer Plane Reef-Boat Molds Fiberglass Boat Molds Deployed Sometime In 1991
Date of Deployment: December 31 1991
Primary Material: FIBERGLASS BOAT MOLDS
County: ST. JOHNS
Depth: 78 ft
[1]
Tides & Solunars
78 ft 29° 50' 45" N 80° 56' 55" W
Outer Plane Reef-Plane Old Small Airplane In 1987 Only Engine And Propeller
Date of Deployment:
Primary Material: AIRPLANE
County: ST. JOHNS
Depth: 78 ft

Relief: 4 ft [1]
Tides & Solunars
78 ft 29° 50' 4" N 80° 57' 39" W
Outer Plane Reef-Ship 65 Feet Long Steel Boat Sunk In 1987(0)
Date of Deployment: December 31 1987
Primary Material: SHIP STEEL 65’
County: ST. JOHNS
Depth: 78 ft

Relief: 12 ft [1]
Tides & Solunars
78 ft 29° 50' 47" N 80° 56' 52" W
Outer-Plane 3800 Cubic Feet Of Large Concrete Junction Boxes And Culverts
Date of Deployment: July 2 1996
Primary Material: CONCRETE CULVERTS
Tonnage: 1400
County: ST. JOHNS
Depth: 82 ft

Relief: 6 ft [1]
Tides & Solunars
82 ft 29° 50' 19" N 80° 57' 1" W
Pop Warner Reef Tires Fiberglass Boats
Date of Deployment: December 31 1976
Primary Material: TIRES
County: ST. JOHNS
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 56' 23" N 81° 5' 31" W
Pop Warner Site 2000 Tons Of Concrete Culverts.
Date of Deployment: September 22 1990
Primary Material: CONCRETE CULVERTS
Tonnage: 2000
County: ST. JOHNS
Depth: 66 ft

Relief: 8 ft [1]
Tides & Solunars
66 ft 29° 56' 29" N 81° 5' 36" W
Shipwreck Reef 2500 Tons Of Concrete Culverts And Other Precast Concrete.
Date of Deployment: April 14 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 2500
County: ST. JOHNS
Depth: 70 ft

Relief: 6 ft [1]
Tides & Solunars
70 ft 29° 46' 23" N 80° 55' 58" W
South Nine Mile Site 2500 Tons Of Concrete Culverts And Other Precast Concrete.
Date of Deployment: July 19 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 2500
County: ST. JOHNS
Depth: 70 ft

Relief: 6 ft [1]
Tides & Solunars
70 ft 29° 52' 18" N 81° 2' 44" W
Standish Reef Large Junction Boxes Second Of Two Loads This Date
Date of Deployment: June 22 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 658
County: ST. JOHNS
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 30° 1' 14" N 81° 5' 53" W
Standish Reef Large Junction Boxes First Of Two Loads This Date
Date of Deployment: June 22 1998
Primary Material: CONCRETE CULVERTS
Tonnage: 740
County: ST. JOHNS
Depth: 68 ft

Relief: 8 ft [1]
Tides & Solunars
68 ft 30° 1' 15" N 81° 5' 51" W
Taylor Reef 2500 Tons Of Concrete And Fiberglass Culverts And Other Precast Concrete
Date of Deployment: June 16 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 2500
County: ST. JOHNS
Depth: 100 ft

Relief: 6 ft [1]
Tides & Solunars
100 ft 29° 55' 41" N 80° 50' 44" W