Gulf County
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.Coordinate Display Format: DMS | DM | DD | ||||
---|---|---|---|---|
Waypoint Name | Description | Depth | Latitude | Longitude |
Arizona Chemical |
Steel Heat Exchanger 4’ Diameter By 60’ Feet Long Date of Deployment: May 30 2000 Primary Material: STEEL HEAT EXCHANGER County: BAY Depth: 66 ft Relief: 4 ft [1] Tides & Solunars |
66 ft | 29° 53' 21" N | 85° 32' 0" W |
Barrier Dunes Barge |
200 Foot Barge Wreck Date of Deployment: December 31 1987 Primary Material: BARGE STEEL County: GULF Depth: 35 ft Relief: 10 ft [1] Tides & Solunars |
35 ft | 29° 45' 3" N | 85° 25' 33" W |
Beanie And Hosehead Reef |
3 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 23 ft Relief: 6 ft [1] Tides & Solunars |
23 ft | 29° 53' 50" N | 85° 28' 9" W |
Bell Shoal |
2 Nd Of Two Drops Of Reefballs This Date Date of Deployment: June 14 2000 Primary Material: MODULES CONCRETE REEFBALLS (36) Tonnage: 108 County: BAY Depth: 21 ft Relief: 6 ft [1] Tides & Solunars |
21 ft | 29° 54' 29" N | 85° 28' 28" W |
Blackfin Reef |
Blackfin Reef 10 Reefballs Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 60 ft Relief: 3 ft [1] Tides & Solunars |
60 ft | 29° 53' 6" N | 85° 32' 6" W |
Bobby Guilford Site |
Concrete Rubble Deployed In Two Trips This Day Date of Deployment: August 9 2004 Primary Material: CONCRETE PILINGS Tonnage: 412 County: BAY Depth: 65 ft Relief: 8 ft [1] Tides & Solunars |
65 ft | 29° 53' 14" N | 85° 32' 37" W |
Brian Moeller Reef |
2 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 29° 53' 57" N | 85° 28' 16" W |
C Of C Reef |
Concrete Rubble And Prefabricated Concrete Date of Deployment: December 31 1964 Primary Material: CONCRETE RUBBLE County: GULF Depth: 40 ft [1] Tides & Solunars |
40 ft | 29° 49' 56" N | 85° 29' 54" W |
Captain Mike Neal's Reef 31 |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Depth: 40 ft Relief: 3 ft [1] Tides & Solunars |
40 ft | 29° 53' 57" N | 85° 30' 39" W |
Captain Mike Neal's Reef#2 |
Funded By The Mexico Beach Artificial Reef Association Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Relief: 3 ft [1] Tides & Solunars |
29° 53' 55" N | 85° 30' 42" W | |
Captain Toms Reef |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 20 ft [1] Tides & Solunars |
20 ft | 29° 54' 6" N | 85° 27' 34" W |
Car Body Site |
Culverts Junction Boxes And Manholes-Private Funding Date of Deployment: December 19 1999 Primary Material: CONCRETE CULVERTS (30) County: BAY Depth: 68 ft Relief: 6 ft [1] Tides & Solunars |
68 ft | 29° 53' 20" N | 85° 32' 58" W |
Car Body Site |
Ave. Center Of 21 Modules 21-Fish Havens (Fh) (Complex#2 Of 5) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(21) Tonnage: 23 County: BAY Depth: 65 ft Relief: 5 ft [1] Tides & Solunars |
65 ft | 29° 53' 26" N | 85° 32' 41" W |
Car Body Site |
Ave. Center Of 22 Modules 12-Fht 8 Fh And 2 Fhjr (Complex#1) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(22) Tonnage: 32 County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 53' 38" N | 85° 31' 36" W |
Car Body Site |
Ave. Center Of 16 Modules Fish Haven Towers(Complex#3 Of 5 ) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(16) Tonnage: 30 County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 53' 39" N | 85° 32' 23" W |
Car Body Site |
Culverts Junction Boxes And Manholes-Private Funding Date of Deployment: December 19 1999 Primary Material: CONCRETE CULVERTS County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 53' 47" N | 85° 32' 49" W |
Car Body Site |
98 Large Reefballs In Two Stacks On Each Site Of Barge Date of Deployment: June 14 2001 Primary Material: MODULES CONCRETE REEFBALLS (98) Tonnage: 183.6 County: BAY Depth: 54 ft Relief: 8 ft [1] Tides & Solunars |
54 ft | 29° 53' 53" N | 85° 31' 47" W |
Car Body Site |
Center Of 12 Modules Fish Haven Tower Units (Complex# 4 Of 5 ) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(12) Tonnage: 23 County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 54' 24" N | 85° 32' 10" W |
Carbody |
105 Reefballs Two Drop Dates Also 7/8/03 Date of Deployment: June 26 2003 Primary Material: MODULES CONCRETE REEFBALLS (105) Tonnage: 364.84 County: BAY Depth: 60 ft Relief: 5 ft [1] Tides & Solunars |
60 ft | 29° 53' 38" N | 85° 32' 38" W |
Carbody |
95 Reefballs All In One Location Date of Deployment: June 12 2002 Primary Material: MODULES CONCRETE REEFBALLS (95) Tonnage: 183.6 County: BAY Depth: 60 ft Relief: 5 ft [1] Tides & Solunars |
60 ft | 29° 53' 47" N | 85° 32' 1" W |
Carbody |
38 Reefballs Two Drop Dates Also 4/22/04 Date of Deployment: June 8 2004 Primary Material: MODULES CONCRETE REEFBALLS (38) County: BAY Depth: 60 ft Relief: 6 ft [1] Tides & Solunars |
60 ft | 29° 53' 52" N | 85° 32' 34" W |
Carbody |
37 Goliath Reefballs 1 Of 2 Drop Dates Also 6/8/04 Date of Deployment: April 22 2004 Primary Material: MODULES CONCRETE REEFBALLS (37) County: BAY Depth: 60 ft Relief: 6 ft [1] Tides & Solunars |
60 ft | 29° 53' 53" N | 85° 32' 36" W |
Carbody-Mbara |
4 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (4) Tonnage: 4 County: BAY Depth: 60 ft Relief: 10 ft [1] Tides & Solunars |
60 ft | 29° 54' 8" N | 85° 32' 23" W |
Charles House Reef |
5 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 68 ft Relief: 6 ft [1] Tides & Solunars |
68 ft | 29° 53' 9" N | 85° 32' 36" W |
Fish America Foundation Reef |
100 Reefballs Funded By ,30000 Fish America Grant Date of Deployment: February 12 2003 Primary Material: MODULES CONCRETE REEFBALLS (100) Tonnage: 200 County: BAY Depth: 67 ft Relief: 8 ft [1] Tides & Solunars |
67 ft | 29° 53' 38" N | 85° 32' 38" W |
Gateway Barge |
70 Foot Barge Steel Tanks Tires And Boxcars Date of Deployment: December 31 1988 Primary Material: BARGE STEEL 70’ County: GULF Depth: 80 ft Relief: 8 ft [1] Tides & Solunars |
80 ft | 29° 50' 14" N | 85° 34' 52" W |
Hammerhead Reef |
Hammerhead Reefs 10 Reefballs Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 45 ft Relief: 3 ft [1] Tides & Solunars |
45 ft | 29° 53' 19" N | 85° 31' 27" W |
Inshore Mexico Bch - Amberjack |
9 4Th Of 11 Drops This Date Amberjack 5 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (5) Tonnage: 10 County: BAY Depth: 25 ft Relief: 4 ft [1] Tides & Solunars |
25 ft | 29° 54' 25" N | 85° 24' 18" W |
Inshore Mexico Bch - Cobia |
9 4Th Of 11 Drops This Date Cobia 5 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (5) Tonnage: 10 County: BAY Depth: 25 ft Relief: 4 ft [1] Tides & Solunars |
25 ft | 29° 54' 23" N | 85° 24' 19" W |
Inshore Mexico Bch - Grouper |
10 4Th Of 11 Drops This Date Grouper 5 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (5) Tonnage: 10 County: BAY Depth: 25 ft Relief: 4 ft [1] Tides & Solunars |
25 ft | 29° 54' 24" N | 85° 24' 15" W |
Jaycee Reef |
Concrete Rubble Car Bodies And Steel Containers Date of Deployment: December 31 1987 Primary Material: CONCRETE RUBBLE County: GULF Depth: 45 ft Relief: 10 ft [1] Tides & Solunars |
45 ft | 29° 50' 18" N | 85° 29' 32" W |
Jaycee Reef |
Concrete Rubble And Steel Containers. Date of Deployment: March 1 1990 Primary Material: CONCRETE CULVERTS County: GULF [1] Tides & Solunars |
29° 50' 25" N | 85° 29' 25" W | |
Lst Port St. Joe |
75 Foot Long Steel Lst Date of Deployment: December 31 1993 Primary Material: SHIP STEEL LAST 75’ County: GULF Depth: 90 ft Relief: 10 ft [1] Tides & Solunars |
90 ft | 29° 40' 25" N | 85° 30' 38" W |
Mbara Barge |
Steel Hopper Barge 195’X30’x12’ With Steel Pipes Mbara Funded ,25000 Date of Deployment: June 19 2001 Primary Material: BARGE STEEL 195’ County: BAY Depth: 71 ft Relief: 12 ft [1] Tides & Solunars |
71 ft | 29° 53' 9" N | 85° 32' 48" W |
Mbara Barge Addition |
1 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 68 ft Relief: 6 ft [1] Tides & Solunars |
68 ft | 29° 53' 9" N | 85° 32' 48" W |
Mexico Beach Site - #1 |
Scrap Steel And Tires Date of Deployment: December 31 1979 Primary Material: STEEL SCRAP County: GULF Depth: 54 ft [1] Tides & Solunars |
54 ft | 29° 54' 4" N | 85° 31' 60" W |
Mexico Beach Site - #2 |
Boxcars Date of Deployment: December 31 1988 Primary Material: BOXCARS County: GULF Depth: 55 ft Relief: 10 ft [1] Tides & Solunars |
55 ft | 29° 54' 4" N | 85° 31' 60" W |
Mexico Beach Site - #3 |
Boxcars Date of Deployment: December 31 1988 Primary Material: BOXCARS County: GULF Depth: 55 ft Relief: 10 ft [1] Tides & Solunars |
55 ft | 29° 54' 0" N | 85° 31' 60" W |
Mexico Beach Site - #4 |
Split And Bundled Tires And Concrete 2 Loads Also 7/28/81 Date of Deployment: September 1 1981 Primary Material: TIRES County: BAY Depth: 54 ft [1] Tides & Solunars |
54 ft | 29° 54' 0" N | 85° 32' 1" W |
Mexico Beach Site - #5 |
Bundled Tires 6Th Of 11 Loads This Grant Date of Deployment: July 28 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
29° 54' 25" N | 85° 31' 47" W | |
Mexico Beach Site - Bluefish |
4 4Th Of 11 Drops This Date Bluefish 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 57 ft Relief: 4 ft [1] Tides & Solunars |
57 ft | 29° 53' 33" N | 85° 31' 59" W |
Mexico Beach Site - Bonita |
7 4Th Of 11 Drops This Date Bonita Reef 10 Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 54' 11" N | 85° 31' 58" W |
Mexico Beach Site - Flounder |
6 4Th Of 11 Drops This Date Flounder 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 54' 3" N | 85° 31' 57" W |
Mexico Beach Site - Hat #1 |
#17 H.Bridge3 Spans5/12/88Concrete Decks Date of Deployment: May 12 1988 Primary Material: BRIDGE SLABS CONCRETE Tonnage: 80 County: GULF [1] Tides & Solunars |
29° 53' 51" N | 85° 31' 59" W | |
Mexico Beach Site - Kingfish |
1 1St Of 11 Drops This Date Kingfish 3 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (3) Tonnage: 6 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 54' 3" N | 85° 32' 37" W |
Mexico Beach Site - Redfish |
2 Nd Of 11 Drops This Date Redfish 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 57 ft Relief: 4 ft [1] Tides & Solunars |
57 ft | 29° 53' 9" N | 85° 31' 60" W |
Mexico Beach Site - Snapper |
11 4Th Of 11 Loads This Date Snapper Reef 10 Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 57 ft Relief: 4 ft [1] Tides & Solunars |
57 ft | 29° 53' 18" N | 85° 31' 59" W |
Mexico Beach Site - Spanish |
3 Rd Of 11 Drops This Date Spanish 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 53' 25" N | 85° 31' 59" W |
Phinizy Reef |
4 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 25 ft Relief: 6 ft [1] Tides & Solunars |
25 ft | 29° 54' 9" N | 85° 28' 26" W |
Red Dove Reef |
Funded By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 40 ft Relief: 3 ft [1] Tides & Solunars |
40 ft | 29° 53' 29" N | 85° 32' 51" W |
Sandy Reef - 1 |
Bridge Spans 1Rst Load Of 4 Date of Deployment: October 1 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 216 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 51" N | 85° 41' 14" W |
Sandy Reef - 2 |
Bridge Spans 2 Nd Load Of 4 Date of Deployment: October 8 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 216 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 52" N | 85° 41' 19" W |
Sandy Reef - 3 |
Bridge Spans 3 Rd Load Of 4 Date of Deployment: October 13 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 216 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 51" N | 85° 41' 18" W |
Sandy Reef - 4 |
Bridge Spans 4 4Th Load Of 4 Date of Deployment: October 30 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 106 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 50" N | 85° 41' 16" W |
Sandy Reef Phase II - 1 |
1Rst Of 4 Deployments This Date192 Reef Balls Total Patch #1 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEF BALLS(48) County: GULF Depth: 100 ft Relief: 4 ft [1] Tides & Solunars |
100 ft | 29° 40' 0" N | 85° 41' 13" W |
Sandy Reef Phase II - 2 |
2Nd Of 4 Deployments This Date Patch#2 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEFBALLS (48) County: GULF Depth: 100 ft Relief: 2 ft [1] Tides & Solunars |
100 ft | 29° 39' 58" N | 85° 41' 9" W |
Sandy Reef Phase II - 3 |
3Rd Of 4 Deployments This Date Patch#3 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEFBALLS (48) County: GULF Depth: 100 ft Relief: 2 ft [1] Tides & Solunars |
100 ft | 29° 39' 55" N | 85° 41' 8" W |
Sandy Reef Phase II - 4 |
4Th Of 4 Deployments This Date Patch#4 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEFBALLS (48) County: GULF Depth: 100 ft Relief: 2 ft [1] Tides & Solunars |
100 ft | 29° 39' 48" N | 85° 41' 10" W |
Smurfit-Stone - #2 |
4 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: September 18 2002 Primary Material: STEEL CYLINDERS (4) Tonnage: 80 County: BAY Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 29° 53' 14" N | 85° 32' 26" W |
Smurfit-Stone - #3 |
2 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: September 19 2002 Primary Material: STEEL CYLINDERS (2) Tonnage: 40 County: BAY Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 29° 53' 50" N | 85° 32' 34" W |
Smurfit-Stone - #4 |
2 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: September 18 2002 Primary Material: STEEL CYLINDERS (2) Tonnage: 40 County: BAY Depth: 60 ft Relief: 12 ft [1] Tides & Solunars |
60 ft | 29° 53' 50" N | 85° 32' 1" W |
Smurfit-Stone - #5 |
2 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: October 25 2002 Primary Material: STEEL CYLINDERS (2) Tonnage: 40 County: BAY Depth: 60 ft Relief: 12 ft [1] Tides & Solunars |
60 ft | 29° 54' 9" N | 85° 31' 39" W |
Smurfit-Stone - #6 |
4 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: October 25 2002 Primary Material: STEEL CYLINDERS (4) Tonnage: 80 County: BAY Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 29° 53' 26" N | 85° 31' 44" W |
Triggerfish Reef |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Depth: 40 ft Relief: 3 ft [1] Tides & Solunars |
40 ft | 29° 54' 1" N | 85° 32' 38" W |
Unnamed |
Concrete Pipes And Junction Boxes 112 Pieces 2Nd Of 2 Loads This Grant Date of Deployment: June 28 2001 Primary Material: CONCRETE PRECAST STRUCTURES (117) Tonnage: 190.1 County: BAY Depth: 52 ft Relief: 8 ft [1] Tides & Solunars |
52 ft | 29° 53' 42" N | 85° 31' 17" W |
Unnamed |
Concrete Pipes And Junction Boxes 112 Pieces 1Rst Of 2 Loads This Gran Date of Deployment: June 26 2001 Primary Material: CONCRETE PRECAST STRUCTURES (112) Tonnage: 160.1 County: BAY Depth: 52 ft Relief: 8 ft [1] Tides & Solunars |
52 ft | 29° 53' 42" N | 85° 31' 17" W |
Unnamed |
30-40 Pieces Culverts/Boxes/Risers Date of Deployment: December 10 1999 Primary Material: CONCRETE PRECAST STRUCTURES County: BAY Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 29° 54' 28" N | 85° 27' 50" W |
Virginia Reef - Site 1 |
Boat Hulls-Metal Crates-And Concrete Rubble. Date of Deployment: August 2 1991 Primary Material: SHIP FIBERGLASS BOAT HULL County: GULF Depth: 65 ft [1] Tides & Solunars |
65 ft | 29° 50' 50" N | 85° 31' 30" W |
Virginia Reef - Site 2 |
Bridge Rubble-Concrete Boxes-And Steel Hoppers. Date of Deployment: July 20 1993 Primary Material: BRIDGE RUBBLE County: GULF Depth: 66 ft Relief: 15 ft [1] Tides & Solunars |
66 ft | 29° 50' 33" N | 85° 31' 31" W |