Escambia County
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.Coordinate Display Format: DMS | DM | DD | ||||
---|---|---|---|---|
Waypoint Name | Description | Depth | Latitude | Longitude |
Admiral Fetterman Reef |
15 Superball Reefballs Around 100 Tons Of Rock 2 Of 2 Drops This Gra Date of Deployment: June 1 2006 Primary Material: MODULES CONCRETE REEFBALLS (15) Tonnage: 136 County: ESCAMBIA Depth: 93 ft Relief: 5 ft [1] Tides & Solunars |
93 ft | 30° 4' 41" N | 87° 11' 53" W |
Antares' Ship |
387 Foot Freighter - Antares Date of Deployment: September 27 1995 Primary Material: SHIP STEEL 387’ County: ESCAMBIA Depth: 130 ft Relief: 60 ft [1] Tides & Solunars |
130 ft | 30° 0' 28" N | 87° 7' 50" W |
Avocet |
247’ Dredge Boat Avocet.(40 Ft Wide) Date of Deployment: May 15 1991 Primary Material: SHIP STEEL DREDGE 247’ County: ESCAMBIA Depth: 115 ft Relief: 55 ft [1] Tides & Solunars |
115 ft | 29° 58' 22" N | 87° 12' 36" W |
Battle Tank 7Bb |
Reef Ex Tank #4 -Pensacola 7B Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 88 ft Relief: 10 ft [1] Tides & Solunars |
88 ft | 30° 9' 22" N | 87° 14' 31" W |
Battle Tank 7A |
Reef Ex Tank #2 -Pensacola 7A Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 83 ft Relief: 10 ft [1] Tides & Solunars |
83 ft | 30° 9' 44" N | 87° 14' 28" W |
Battle Tank 7G2 |
Reef Ex Tank #1 -Pensacola 7G2 Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 83 ft Relief: 10 ft [1] Tides & Solunars |
83 ft | 30° 9' 40" N | 87° 14' 26" W |
Battle Tank 7G3 |
Reef Ex Tank #3 -Pensacola 7G3 Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 86 ft Relief: 10 ft [1] Tides & Solunars |
86 ft | 30° 9' 37" N | 87° 14' 26" W |
Battle Tank 7G4 |
Reef Ex Tank #7 -Pensacola 7G4 Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 95 ft Relief: 10 ft [1] Tides & Solunars |
95 ft | 30° 9' 5" N | 87° 14' 20" W |
Battle Tank 7H |
Reef Ex Tank #8 -Pensacola 7H Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 91 ft Relief: 10 ft [1] Tides & Solunars |
91 ft | 30° 9' 11" N | 87° 14' 22" W |
Battle Tank 7M1 |
Reef Ex Tank #5 -Pensacola 7M1 Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 85 ft Relief: 10 ft [1] Tides & Solunars |
85 ft | 30° 9' 26" N | 87° 14' 20" W |
Battle Tank 7M2 |
Reef Ex Tank #6 -Pensacola 7M2 Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 85 ft Relief: 10 ft [1] Tides & Solunars |
85 ft | 30° 9' 22" N | 87° 14' 18" W |
Bay Bridge - Site #1 |
480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: January 19 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 480 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 53" N | 87° 9' 3" W |
Bay Bridge - Site #2 |
500 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: February 1 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 500 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 54" N | 87° 9' 0" W |
Bay Bridge - Site #3 |
480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: February 20 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 480 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 54" N | 87° 9' 0" W |
Bay Bridge - Site #4 |
460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: March 6 2006 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 460 County: ESCAMBIA Depth: 100 ft [1] Tides & Solunars |
100 ft | 30° 5' 54" N | 87° 9' 0" W |
Born Again Tugboat |
65 Ft. Long Tugboat The Born Again Also 21 Steel Pipes Date of Deployment: February 24 1991 Primary Material: SHIP STEEL TUG 65’ County: ESCAMBIA Depth: 96 ft Relief: 25 ft [1] Tides & Solunars |
96 ft | 30° 8' 13" N | 87° 14' 13" W |
Brown Barge Middle School |
1 Goliath Ball And 4 Pallet Balls Date of Deployment: June 2 2004 Primary Material: MODULES CONCRETE REEFBALLS (5) County: ESCAMBIA Depth: 91 ft Relief: 5 ft [1] Tides & Solunars |
91 ft | 30° 6' 31" N | 87° 11' 38" W |
Car Bodies |
20 Car Bodies 2 Of 5 Loads Also (13248.0/47062.4) Date of Deployment: August 30 1988 Primary Material: AUTOMOBILE BODIES County: ESCAMBIA Depth: 78 ft Relief: 3 ft [1] Tides & Solunars |
78 ft | 30° 9' 27" N | 87° 14' 30" W |
Car Bodies |
10 Car Bodies Date of Deployment: August 31 1988 Primary Material: AUTOMOBILE BODIES County: ESCAMBIA Depth: 77 ft Relief: 4 ft [1] Tides & Solunars |
77 ft | 30° 11' 4" N | 87° 14' 43" W |
Car Bodies |
30 Car Bodies 3 Of 5 Loads Also (13254.3/47082.8)&(13247.6/47076.5) Date of Deployment: August 30 1988 Primary Material: AUTOMOBILE BODIES County: ESCAMBIA Depth: 65 ft Relief: 3 ft [1] Tides & Solunars |
65 ft | 30° 12' 3" N | 87° 14' 55" W |
Car Bodies |
10 Car Bodies Date of Deployment: August 31 1988 Primary Material: AUTOMOBILE BODIES County: ESCAMBIA Depth: 66 ft Relief: 4 ft [1] Tides & Solunars |
66 ft | 30° 12' 17" N | 87° 14' 14" W |
Car Bodies |
45 Automobile Bodies Deployed As Part Of Research Project Date of Deployment: August 26 1992 Primary Material: AUTOMOBILE BODIES County: ESCAMBIA Depth: 74 ft Relief: 4 ft [1] Tides & Solunars |
74 ft | 30° 12' 18" N | 87° 14' 34" W |
Celia Reef |
15 Walter Florida Special Modules 1 Of 2 Drops This Day And Grant Date of Deployment: June 14 2003 Primary Material: MODULES CONCRETE WALTERS FL (15) Tonnage: 30 County: ESCAMBIA Depth: 92 ft Relief: 10 ft [1] Tides & Solunars |
92 ft | 30° 5' 14" N | 87° 11' 54" W |
Chevron Platform |
Oil Rig Structure Two Jackets Laying Side By Side Date of Deployment: October 18 1993 Primary Material: OIL RIG STRUCTURE County: ESCAMBIA Depth: 137 ft Relief: 62 ft [1] Tides & Solunars |
137 ft | 30° 4' 15" N | 87° 2' 7" W |
Concrete ' Fish Havens' |
Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (2 Of 3) Date of Deployment: June 20 2000 Primary Material: MODULES CONCRETE FISH HAVENS (21) Tonnage: 24.2 County: ESCAMBIA Depth: 96 ft Relief: 6 ft [1] Tides & Solunars |
96 ft | 30° 5' 50" N | 87° 8' 9" W |
Concrete ' Fish Havens' |
Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (3 Of 3) Date of Deployment: June 20 2000 Primary Material: MODULES CONCRETE FISH HAVENS (21) Tonnage: 24.2 County: ESCAMBIA Depth: 96 ft Relief: 6 ft [1] Tides & Solunars |
96 ft | 30° 5' 55" N | 87° 7' 57" W |
Concrete ' Fish Havens' |
Center For 53 Fish Havens (35-Fht And 18-Fh) Date of Deployment: June 26 1999 Primary Material: MODULES CONCRETE FISH HAVENS(53) Tonnage: 81 County: ESCAMBIA Depth: 95 ft Relief: 6 ft [1] Tides & Solunars |
95 ft | 30° 5' 59" N | 87° 7' 57" W |
Concrete ' Fish Havens' |
Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (1 Of 3) Date of Deployment: June 20 2000 Primary Material: MODULES CONCRETE FISH HAVENS (21) Tonnage: 24.2 County: ESCAMBIA Depth: 95 ft Relief: 6 ft [1] Tides & Solunars |
95 ft | 30° 6' 15" N | 87° 7' 58" W |
Concrete Culverts |
1Rst Of Two Loads Of Concrete Culverts Date of Deployment: August 8 1989 Primary Material: CONCRETE CULVERTS County: ESCAMBIA Depth: 81 ft Relief: 8 ft [1] Tides & Solunars |
81 ft | 30° 9' 35" N | 87° 14' 24" W |
Concrete Culverts |
2Nd Of Two Loads Of Concrete Culverts Date of Deployment: August 17 1989 Primary Material: CONCRETE CULVERTS County: ESCAMBIA Depth: 87 ft Relief: 8 ft [1] Tides & Solunars |
87 ft | 30° 9' 40" N | 87° 13' 49" W |
Concrete Pyramids |
10 Sets Of 5 Each (50 Total) In A Line Toward (13247.0/47006.0) Date of Deployment: March 30 1994 Primary Material: MODULES CONCRETE GHETTOS (50) County: ESCAMBIA Depth: 120 ft Relief: 7 ft [1] Tides & Solunars |
120 ft | 29° 58' 25" N | 87° 12' 27" W |
Concrete Pyramids |
4 Sets Of 5 Pyramids Each (20 Total) In Line To (13309.0/47003.0) Date of Deployment: April 29 1994 Primary Material: MODULES CONCRETE GHETTOS (20) County: ESCAMBIA Depth: 18 ft Relief: 7 ft [1] Tides & Solunars |
18 ft | 30° 4' 15" N | 87° 1' 48" W |
Concrete Pyramids |
5 Concrete Pyramids In Two Locations Date of Deployment: April 1 1994 Primary Material: MODULES CONCRETE GHETTOS (5) County: ESCAMBIA Depth: 101 ft Relief: 6 ft [1] Tides & Solunars |
101 ft | 30° 8' 30" N | 87° 13' 28" W |
Concrete Pyramids |
5 Concrete Pyramids In Two Locations Date of Deployment: April 1 1994 Primary Material: MODULES CONCRETE GHETTOS (5) County: ESCAMBIA Depth: 98 ft Relief: 6 ft [1] Tides & Solunars |
98 ft | 30° 8' 53" N | 87° 13' 44" W |
Csx Rubble |
Barge And Concrete Rubble Overlays Qq Sites 3 4 And 5 Csx Rubble Date of Deployment: July 26 1988 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 90 ft [1] Tides & Solunars |
90 ft | 30° 8' 59" N | 87° 13' 38" W |
Csx Rubble |
Concrete Bridge Span 8 Foot Csx Rubble Date of Deployment: August 17 1987 Primary Material: BRIDGE SPANS County: ESCAMBIA Depth: 90 ft [1] Tides & Solunars |
90 ft | 30° 9' 2" N | 87° 13' 41" W |
Csx Rubble Site |
Broken Pieces Of Concrete On A Barge -On Csx Rubble Site Date of Deployment: July 26 1988 Primary Material: CONCRETE RUBBLE County: ESCAMBIA Depth: 90 ft [1] Tides & Solunars |
90 ft | 30° 8' 59" N | 87° 13' 39" W |
Culverts |
18 To 4 X 8 Feet Long Culverts Second Of Two Loads This Grant Date of Deployment: June 19 1998 Primary Material: CONCRETE CULVERTS Tonnage: 251 County: ESCAMBIA Depth: 75 ft Relief: 12 ft [1] Tides & Solunars |
75 ft | 30° 11' 47" N | 87° 14' 15" W |
Culverts |
10 To 48 X 8Ft. Long Culverts First Of Two Loads This Grant Date of Deployment: June 12 1998 Primary Material: CONCRETE CULVERTS Tonnage: 218 County: ESCAMBIA Depth: 72 ft Relief: 10 ft [1] Tides & Solunars |
72 ft | 30° 12' 2" N | 87° 14' 20" W |
Culverts -L17 |
Concrete Culverts And Rubble Around Tessie Date of Deployment: January 25 1989 Primary Material: CONCRETE CULVERTS County: ESCAMBIA Depth: 72 ft Relief: 5 ft [1] Tides & Solunars |
72 ft | 30° 12' 2" N | 87° 14' 18" W |
Deliverance Tugboat |
65 Foot Long Steel Hulled Tugboat Deliverance Date of Deployment: October 24 1989 Primary Material: SHIP STEEL TUG 65’ County: ESCAMBIA Depth: 82 ft Relief: 22 ft [1] Tides & Solunars |
82 ft | 30° 10' 54" N | 87° 14' 37" W |
Don Phillips Barge And Parks |
Steel Deck Barge 120 X 33 X 7 And Steel And Concrete Merry-Go-Rounds Date of Deployment: January 9 2005 Primary Material: BARGE STEEL 120’ Tonnage: 446 County: ESCAMBIA Depth: 100 ft Relief: 8 ft [1] Tides & Solunars |
100 ft | 30° 5' 45" N | 87° 10' 36" W |
Donut Reef |
Navy Oil Skimmer/Storage Tank 25’L X 15’W X 20’H Date of Deployment: December 11 1996 Primary Material: STEEL STORAGE TANK Tonnage: 22 County: ESCAMBIA Depth: 82 ft Relief: 20 ft [1] Tides & Solunars |
82 ft | 30° 10' 53" N | 87° 14' 27" W |
East Lap 'Army Tanks' |
Reef Ex Tank #9 -Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 60" W |
East Lap 'Army Tanks' |
Reef Ex Tank #10-Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 60" W |
East Lap 'Army Tanks' |
Reef Ex Tank #11- Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 59" W |
East Lap 'Army Tanks' |
Reef Ex Tank #12-Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 30" N | 87° 11' 57" W |
East Lap 'Army Tanks' |
Reef Ex Tank #13-Pensacola Date of Deployment: December 18 1994 Primary Material: ARMY TANK M-60 Tonnage: 50 County: ESCAMBIA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 30° 6' 34" N | 87° 11' 53" W |
East Lap 'Chemical Courier' |
80 Ft X 25 Ft. Wide X 38 Ft. Tall Tug The Chemical Courier Date of Deployment: October 24 1996 Primary Material: SHIP STEEL TUG 80’ County: SANTA ROSA Depth: 95 ft Relief: 35 ft [1] Tides & Solunars |
95 ft | 30° 5' 57" N | 87° 10' 57" W |
East Lap Reefballs |
5Th Of Five Loads 5 Each Also At 13288.5/47044.9 And 13288.1/47045.0 Date of Deployment: June 27 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 5' 43" N | 87° 9' 32" W |
East Lap Reefballs |
4Th Of Five Loads 5 Each Also At 13285.1/47048.4 And 13286.4/47048.4 Date of Deployment: June 26 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 5' 56" N | 87° 10' 3" W |
East Lap Reefballs |
3Rd Of Five Loads 5 Each Also At 13286.1/47050.8 And 13286.8/47050.8 Date of Deployment: June 25 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 6' 24" N | 87° 10' 4" W |
East Lap Reefballs |
1 1St Of Five Loads15 Balls-5 Each @ 13270.6/47049.8& 13270.3/47049.7 Date of Deployment: June 19 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 6' 41" N | 87° 11' 25" W |
East Lap Reefballs |
2Nd Of Five Loads 5 Each Also At 13270.4/47049.5 And 13285.6/47050.9 Date of Deployment: June 20 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SANTA ROSA Depth: 94 ft Relief: 5 ft [1] Tides & Solunars |
94 ft | 30° 6' 49" N | 87° 10' 5" W |
Ecua Culverts |
Total Of 7 Pipes 68 X 40 Ft’ Long Date of Deployment: August 6 1990 Primary Material: CONCRETE CULVERTS County: ESCAMBIA Depth: 83 ft Relief: 6 ft [1] Tides & Solunars |
83 ft | 30° 12' 18" N | 87° 14' 22" W |
George Wilkins Reef |
19 Goliath Reefballs 1 Of 2 Drops This Grant Date of Deployment: June 24 2005 Primary Material: MODULES CONCRETE REEFBALLS (19) Tonnage: 57 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 5' 25" N | 87° 10' 51" W |
Gulf Power Steel Tower |
Gulf Power Steel Towers Date of Deployment: April 10 1992 Primary Material: STEEL TOWERS/RADIO County: ESCAMBIA Depth: 77 ft Relief: 8 ft [1] Tides & Solunars |
77 ft | 30° 12' 23" N | 87° 14' 19" W |
Heron Tugboat |
53 Ft. Long Tugboat The Heron Next To Lcm Elise Date of Deployment: July 22 1990 Primary Material: SHIP STEEL TUG 53’ County: ESCAMBIA Depth: 90 ft Relief: 14 ft [1] Tides & Solunars |
90 ft | 30° 8' 11" N | 87° 13' 40" W |
I-10 Bridge Reef - Site 2 |
I-10 22 Pieces Bridge Pilings 4’X4’x30’ (Mpr) Second Of 3 Loads Date of Deployment: May 8 1997 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 800 County: ESCAMBIA Depth: 128 ft Relief: 8 ft [1] Tides & Solunars |
128 ft | 30° 0' 31" N | 87° 7' 46" W |
I-10 Bridge Reef - Site 3 |
I-10 Bridge Hand Rails 50 Pieces 2’X 4’X 30’ Third Of 3 Loads Date of Deployment: June 28 1997 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 1750 County: ESCAMBIA Depth: 97 ft Relief: 8 ft [1] Tides & Solunars |
97 ft | 30° 9' 7" N | 87° 13' 34" W |
Interstate 10 Bridge Reef#1 |
305 Tons Of Concrete Bridge Spans From Old I-10 Pensacola Bay Bridge Date of Deployment: February 8 2007 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 305 County: ESCAMBIA Depth: 75 ft Relief: 5 ft [1] Tides & Solunars |
75 ft | 30° 6' 45" N | 87° 24' 15" W |
Joseph Meek |
400 Ft. Liberty Ship Joseph L. Meek Date of Deployment: November 5 1976 Primary Material: SHIP STEEL 400’ County: ESCAMBIA Depth: 95 ft [1] Tides & Solunars |
95 ft | 30° 16' 23" N | 87° 9' 34" W |
Kingry Barge |
Kingry Barge With Tanks Date of Deployment: November 16 1993 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 90 ft [1] Tides & Solunars |
90 ft | 30° 9' 35" N | 87° 13' 54" W |
Knicklebine Barge |
Steel Barge And 14 Pieces Of Concrete Ballast Date of Deployment: February 12 2003 Primary Material: BARGE STEEL 117’ County: ESCAMBIA Depth: 122 ft Relief: 11 ft [1] Tides & Solunars |
122 ft | 30° 1' 58" N | 87° 11' 30" W |
Large Concrete Bridge Span |
Large Concrete Bridge Span Date of Deployment: August 17 1987 Primary Material: BRIDGE SPANS County: ESCAMBIA Depth: 90 ft [1] Tides & Solunars |
90 ft | 30° 8' 59" N | 87° 13' 37" W |
Lcm |
56 Ft. Lcm Elsie Next To Heron Date of Deployment: July 22 1990 Primary Material: SHIP STEEL LCM 56’ County: ESCAMBIA [1] Tides & Solunars |
30° 8' 11" N | 87° 13' 41" W | |
Mara |
16 Walter Florida Special Modules 2 Of 2 Drops This Day And Grant Date of Deployment: June 14 2003 Primary Material: MODULES CONCRETE WALTERS FL (16) Tonnage: 32 County: ESCAMBIA Depth: 95 ft Relief: 10 ft [1] Tides & Solunars |
95 ft | 30° 5' 28" N | 87° 11' 51" W |
Mayor Whibbs Reef |
18 Superball Reefballs 1 Of 2 Drops This Grant Date of Deployment: June 1 2006 Primary Material: MODULES CONCRETE REEFBALLS (18) Tonnage: 36 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 4' 38" N | 87° 11' 38" W |
Mc Kay Reef |
Tires Appliances And Shopping Carts Date of Deployment: December 31 1987 Primary Material: TIRES County: SANTA ROSA Depth: 156 ft [1] Tides & Solunars |
156 ft | 30° 4' 0" N | 87° 4' 0" W |
Miss Jenny Tugboat |
53 Ft. Long Ship The Miss Jenny Date of Deployment: December 14 1990 Primary Material: SHIP STEEL 53’ County: ESCAMBIA Depth: 115 ft Relief: 15 ft [1] Tides & Solunars |
115 ft | 29° 58' 8" N | 87° 12' 38" W |
Navy Barge |
Navy Barge Date of Deployment: June 11 1993 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 82 ft [1] Tides & Solunars |
82 ft | 30° 11' 11" N | 87° 14' 45" W |
Navy Camel Barge |
Navy Camel Barge Date of Deployment: January 22 1994 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 82 ft [1] Tides & Solunars |
82 ft | 30° 11' 12" N | 87° 14' 46" W |
Navy Dive Tender Ydt-14 |
132 Feet Long 312 Tons Navy Dive Tender (1 1St Of Two This Date) Date of Deployment: April 1 2000 Primary Material: SHIP STEEL 132’ Tonnage: 312 County: ESCAMBIA Depth: 90 ft Relief: 28 ft [1] Tides & Solunars |
90 ft | 30° 5' 20" N | 87° 9' 38" W |
Navy Dive Tender Ydt-15 |
132 Feet Long 312 Tons Navy Dive Tender (2Nd Of Two This Date) Date of Deployment: April 1 2000 Primary Material: SHIP STEEL 132’ Tonnage: 312 County: ESCAMBIA Depth: 90 ft Relief: 28 ft [1] Tides & Solunars |
90 ft | 30° 5' 16" N | 87° 9' 33" W |
Oops Barge |
Steel Barge 65 X 20 X7 Ft. Sunk On Way Out To Permitted Site Date of Deployment: October 2 1995 Primary Material: BARGE 65’ County: ESCAMBIA Depth: 75 ft [1] Tides & Solunars |
75 ft | 30° 13' 14" N | 87° 13' 60" W |
Oriskany Memorial Reef |
Navy Aircraft Carrier Ex-Uss Oriskany 888 Feet Long 135 Feet Deep To Date of Deployment: May 17 2006 Primary Material: SHIP STEEL 888’ Tonnage: 32000 County: ESCAMBIA Depth: 212 ft Relief: 134 ft [1] Tides & Solunars |
212 ft | 30° 2' 33" N | 87° 0' 24" W |
P.C. Barge |
110 Ft. Long Steel Barge The P.C. Barge Date of Deployment: June 20 1990 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 82 ft Relief: 8 ft [1] Tides & Solunars |
82 ft | 30° 11' 11" N | 87° 14' 4" W |
Pat Donnelly Reef |
27 Goliath Reefballs Two Of Two Drops This Grant Date of Deployment: June 28 2004 Primary Material: MODULES CONCRETE REEFBALLS (27) Tonnage: 54 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 4' 41" N | 87° 11' 9" W |
Penhall Ii Reef |
Blackwater Brdige Rubble 6 Loads Total Date of Deployment: June 28 2003 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 4500 County: ESCAMBIA Depth: 94 ft Relief: 10 ft [1] Tides & Solunars |
94 ft | 30° 4' 60" N | 87° 10' 60" W |
Penhall Reef |
Blackwater Brdige Rubble 4 Loads Total Date of Deployment: February 9 2002 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 5700 County: ESCAMBIA Depth: 92 ft Relief: 12 ft [1] Tides & Solunars |
92 ft | 30° 5' 31" N | 87° 11' 30" W |
Pensacoal Bay Fishing Bridge Reef # |
460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier Date of Deployment: February 17 2007 Primary Material: BRIDGE RUBBLE CONCRETE Tonnage: 500 County: ESCAMBIA Depth: 113 ft Relief: 5 ft [1] Tides & Solunars |
113 ft | 30° 6' 43" N | 87° 9' 40" W |
Pete Tide Ii Ship |
180’ Steel Ship Pete Tide Ii. Date of Deployment: May 23 1993 Primary Material: SHIP STEEL 180’ County: ESCAMBIA Depth: 105 ft Relief: 43 ft [1] Tides & Solunars |
105 ft | 30° 8' 46" N | 87° 14' 1" W |
Philp Tugboat |
60 Ft. Long Tugboat The Philip Date of Deployment: December 9 1990 Primary Material: SHIP STEEL TUG 60’ County: ESCAMBIA Depth: 96 ft Relief: 20 ft [1] Tides & Solunars |
96 ft | 30° 7' 58" N | 87° 13' 20" W |
Pipe T33 |
Concrete Culverts 100 Near Tessie Date of Deployment: December 31 1989 Primary Material: CONCRETE CULVERTS County: ESCAMBIA Depth: 75 ft Relief: 5 ft [1] Tides & Solunars |
75 ft | 30° 11' 41" N | 87° 14' 33" W |
Plastic Wood Modules |
3Rd Set Of 3 Loads -Set Of 4 Plastic Wood Modules Site# 20 Date of Deployment: June 22 1993 Primary Material: MODULES PLASTIC WOOD County: ESCAMBIA Depth: 139 ft Relief: 10 ft [1] Tides & Solunars |
139 ft | 29° 57' 12" N | 87° 12' 30" W |
Plastic Wood Modules |
2Nd Set Of 3 Loads- Set Of 4 Plastic Wood Modules Site# 7 Date of Deployment: June 22 1993 Primary Material: MODULES PLASTIC WOOD County: ESCAMBIA Depth: 90 ft Relief: 10 ft [1] Tides & Solunars |
90 ft | 30° 9' 5" N | 87° 14' 22" W |
Plastic Wood Modules |
1Rst Load Of 3 -Set Of 4 Plastic Wood Modules Site #15 Date of Deployment: May 22 1993 Primary Material: MODULES PLASTIC WOOD County: ESCAMBIA Depth: 88 ft Relief: 8 ft [1] Tides & Solunars |
88 ft | 30° 10' 39" N | 87° 14' 27" W |
Pvc Modules By Arcoa |
Pre-Fabricated Pvc Modules By Arcoa Date of Deployment: June 5 1989 Primary Material: MODULES PVC County: ESCAMBIA Depth: 84 ft Relief: 4 ft [1] Tides & Solunars |
84 ft | 30° 9' 35" N | 87° 14' 5" W |
Pvc Modules By Arcoa |
Pre-Fabricated Pvc Modules By Arcoa Date of Deployment: July 26 1989 Primary Material: MODULES PVC County: ESCAMBIA Depth: 81 ft Relief: 4 ft [1] Tides & Solunars |
81 ft | 30° 10' 11" N | 87° 13' 53" W |
Ray Jones Reef |
15 Goliath Reefballs And 100 Tons Rubble In Middle 1 Of 2 Drops This Date of Deployment: June 24 2005 Primary Material: MODULES CONCRETE REEFBALLS (15) Tonnage: 153 County: ESCAMBIA Depth: 90 ft Relief: 5 ft [1] Tides & Solunars |
90 ft | 30° 5' 22" N | 87° 10' 32" W |
Rusty B Reef |
30 Goliath Reefballs And 40 Tons Of Rock One Of Two Drops This Grant Date of Deployment: June 22 2004 Primary Material: MODULES CONCRETE REEFBALLS (20) Tonnage: 140 County: ESCAMBIA Depth: 89 ft Relief: 5 ft [1] Tides & Solunars |
89 ft | 30° 4' 45" N | 87° 11' 22" W |
San Pablo (W) Ship |
Navy Target Ship Also Known As Russian Freighter Date of Deployment: December 31 1943 Primary Material: SHIP STEEL County: ESCAMBIA Depth: 84 ft Relief: 27 ft [1] Tides & Solunars |
84 ft | 30° 11' 20" N | 87° 13' 3" W |
Santa Rosa Marine Resort - 1 |
4 Towers 30 Havens And 30 Juniors 5 Sites Date of Deployment: June 2 2003 Primary Material: CONCRETE MODULES FISH HAVENS (64) Tonnage: 50 County: SANTA ROSA Depth: 97 ft Relief: 6 ft [1] Tides & Solunars |
97 ft | 30° 3' 27" N | 87° 11' 56" W |
Santa Rosa Marine Resort II - 1 |
30 Goliath Reef Balls Two Of Two Drops This Grant Date of Deployment: July 12 2004 Primary Material: MODULES CONCRETE REEFBALLS(35) County: SANTA ROSA Depth: 85 ft Relief: 5 ft [1] Tides & Solunars |
85 ft | 30° 4' 54" N | 87° 11' 42" W |
Santa Rosa Marine Resort II - 2 |
30 Goliath Reef Balls First Of Two Drops This Grant Date of Deployment: June 30 2004 Primary Material: MODULES CONCRETE REEFBALLS(36) County: SANTA ROSA Depth: 85 ft Relief: 5 ft [1] Tides & Solunars |
85 ft | 30° 4' 54" N | 87° 11' 41" W |
Santa Rosa Marine Resort III - 1 |
5 Towers 25 Havens And 25 Juniors At 13 Sites Site 3-1 Is Center Date of Deployment: June 30 2005 Primary Material: CONCRETE MODULES FISH HAVENS (55) Tonnage: 62.5 County: SANTA ROSA Depth: 85 ft Relief: 6 ft [1] Tides & Solunars |
85 ft | 30° 4' 56" N | 87° 10' 25" W |
Santa Rosa Marine Resort IV - 1 |
15 Walters Coquina Sides Reefs 12 X 10 Around Center Date of Deployment: May 24 2006 Primary Material: WALTER COQUINA REEFS (15) Tonnage: 37.5 County: SANTA ROSA Depth: 85 ft Relief: 10 ft [1] Tides & Solunars |
85 ft | 30° 4' 30" N | 87° 11' 14" W |
Santa Rosa Marine Resort IV - 2 |
15 Walters Coquina Sides Reefs 12 X 10 Around Center Date of Deployment: May 24 2006 Primary Material: WALTER COQUINA REEFS (15) Tonnage: 37.5 County: SANTA ROSA Depth: 85 ft Relief: 10 ft [1] Tides & Solunars |
85 ft | 30° 4' 34" N | 87° 11' 26" W |
Scrap Steel |
Scrap Steel And 10 Car Bodies Date of Deployment: August 31 1988 Primary Material: AUTOMOBILE BODIES County: ESCAMBIA Depth: 78 ft Relief: 3 ft [1] Tides & Solunars |
78 ft | 30° 8' 22" N | 87° 13' 18" W |
Small Bridge Span |
Small Bridge Span Date of Deployment: August 17 1987 Primary Material: BRIDGE SPANS County: ESCAMBIA Depth: 90 ft [1] Tides & Solunars |
90 ft | 30° 9' 1" N | 87° 13' 41" W |
Soule Barge |
140 Foot Steel Barge With Towers Attached (Soule Barge) Date of Deployment: April 10 1992 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 83 ft Relief: 10 ft [1] Tides & Solunars |
83 ft | 30° 10' 53" N | 87° 14' 34" W |
Soule Modules - #1 |
6 Concrete Modules 4 Of 4 Drops. Date of Deployment: May 10 1993 Primary Material: MODULES CONCRETE PIPES (6) County: ESCAMBIA Depth: 78 ft Relief: 8 ft [1] Tides & Solunars |
78 ft | 30° 12' 11" N | 87° 14' 58" W |
Soule Modules - #2 |
6 Concrete Modules 1 Of 4 Drops. Date of Deployment: May 10 1993 Primary Material: MODULES CONCRETE PIPES (6) County: ESCAMBIA Depth: 78 ft Relief: 8 ft [1] Tides & Solunars |
78 ft | 30° 12' 22" N | 87° 14' 51" W |
Soule Modules - #3 |
6 Concrete Modules 2 Of 4 Drops. Date of Deployment: May 10 1993 Primary Material: MODULES CONCRETE PIPES (6) County: ESCAMBIA Depth: 78 ft Relief: 8 ft [1] Tides & Solunars |
78 ft | 30° 10' 45" N | 87° 14' 47" W |
Soule Modules - #4 |
6 Concrete Modules 3 Of 4 Drops. Date of Deployment: May 10 1993 Primary Material: MODULES CONCRETE PIPES (6) County: ESCAMBIA Depth: 78 ft Relief: 8 ft [1] Tides & Solunars |
78 ft | 30° 11' 28" N | 87° 14' 40" W |
Steel Barge |
Steel Barge Near Faa Radio Towers Date of Deployment: June 20 1990 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 75 ft [1] Tides & Solunars |
75 ft | 30° 11' 37" N | 87° 13' 53" W |
Steel Boxes |
9 Units Of Thirteen Steel Boxes Each 4X4x7ft. (117 Total) 3Rd Drop Date of Deployment: July 26 1989 Primary Material: STEEL BOXES County: ESCAMBIA Depth: 69 ft Relief: 25 ft [1] Tides & Solunars |
69 ft | 30° 11' 41" N | 87° 14' 54" W |
Steel Boxes |
9 Units Of Thirteen Steel Boxes Each 4X4x7ft. (117 Total) 2Nd Drop Date of Deployment: July 10 1989 Primary Material: STEEL BOXES County: ESCAMBIA Depth: 67 ft Relief: 25 ft [1] Tides & Solunars |
67 ft | 30° 11' 58" N | 87° 14' 45" W |
Steel Boxes |
6 Units Of Thirteen Steel Boxes Each 4X4x7ft.(104 Total)1Rst Drop Of 3 Date of Deployment: June 24 1989 Primary Material: STEEL CONTAINERS County: ESCAMBIA Depth: 67 ft Relief: 25 ft [1] Tides & Solunars |
67 ft | 30° 12' 11" N | 87° 14' 42" W |
Steel Radio Towers Faa Site |
Steel Radio Towers Faa Site Date of Deployment: February 24 1991 Primary Material: STEEL SCRAP County: ESCAMBIA Depth: 77 ft Relief: 8 ft [1] Tides & Solunars |
77 ft | 30° 11' 15" N | 87° 14' 7" W |
Steel Water Tower Pipes |
Steel Water Tower Pipes Near Tessie Date of Deployment: December 31 1989 Primary Material: STEEL SCRAP County: ESCAMBIA Depth: 75 ft [1] Tides & Solunars |
75 ft | 30° 11' 26" N | 87° 14' 32" W |
Sylvia Tugboat 48' |
48’ Tug Boat Sylvia. Date of Deployment: June 26 1990 Primary Material: SHIP STEEL TUG 48’ County: ESCAMBIA Depth: 82 ft Relief: 25 ft [1] Tides & Solunars |
82 ft | 30° 11' 6" N | 87° 14' 12" W |
Tanks And Culverts |
4 Tanks 12’ X 20’16 Containers 4X4x4’2 Concrete Culverts(1Rst Of 2) Date of Deployment: September 26 1990 Primary Material: FIBERGLASS TANKS County: ESCAMBIA Depth: 117 ft Relief: 12 ft [1] Tides & Solunars |
117 ft | 29° 57' 46" N | 87° 12' 34" W |
Tanks And Culverts |
2 Tanks 12’ X 20’13 Containers 4X4x4’6 Concrete Culverts (2Nd Of 2) Date of Deployment: October 1 1990 Primary Material: FIBERGLASS TANKS County: ESCAMBIA Depth: 124 ft Relief: 12 ft [1] Tides & Solunars |
124 ft | 29° 57' 58" N | 87° 12' 27" W |
Tenneco Platform |
Oil Rig Platform2 Pieces 130’X 80 X 90’ Date of Deployment: September 29 1982 Primary Material: OIL RIG STRUCTURE County: ESCAMBIA Depth: 175 ft Relief: 80 ft [1] Tides & Solunars |
175 ft | 29° 59' 44" N | 87° 5' 7" W |
Tessie Steel Boat |
40 Ft. Long Steel Boat The Tessie Date of Deployment: April 5 1988 Primary Material: SHIP STEEL 40’ County: ESCAMBIA Depth: 75 ft Relief: 10 ft [1] Tides & Solunars |
75 ft | 30° 11' 38" N | 87° 14' 27" W |
Tex Edwards Barge |
Steel Barge Date of Deployment: December 31 1982 Primary Material: BARGE STEEL County: ESCAMBIA Depth: 75 ft [1] Tides & Solunars |
75 ft | 30° 16' 8" N | 87° 10' 9" W |
Three Barges |
Three Coal Barges And Concrete Rubble Date of Deployment: December 31 1974 Primary Material: BARGE STEEL (3) County: ESCAMBIA Depth: 54 ft Relief: 10 ft [1] Tides & Solunars |
54 ft | 30° 17' 27" N | 87° 13' 15" W |