Bay County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
331 Bridge 331 Bridge10 Pieces 5/31/91 Concrete Decks
Date of Deployment: May 31 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 6' 12" N 85° 48' 8" W
Accokeek 143 Foot Long Navy Tugboat
Date of Deployment: July 9 2000
Primary Material: SHIP STEEL NAVY TUGBOAT 143’
County: BAY
Depth: 100 ft

Relief: 37 ft [1]
Tides & Solunars
100 ft 29° 58' 28" N 85° 51' 55" W
AJ's Carey Ricks Memorial 75’ x 20’ x 20’ Steel Vessel with Chicken Transport Devices and Superstructure.
Primary Material: Vessel
Deploy Date: 2011/09/23
Depth: 113 ft

Relief: 25 ft [2]
Tides & Solunars
113 ft 30° 9' 28" N 86° 24' 25" W
Aquatic Life Ecosystem (Ale) Center 4 Walter Tetrahedrons,9,10,11 & 12 of 40 Drops This Grant And Date, Lat/Lon For Unit #11
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 48" N 86° 18' 40" W
Aquatic Life Ecosystem (Ale) Center #2 4 Walter Tetrahedrons,37, 38, 39 & 40 of 40 Drops This Grant And Date, Lat/Lon For Unit #38
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 47" N 86° 18' 37" W
Aquatic Life Ecosystem (Ale) NE Leg #2 2 Walter Tetrahedrons, 33 & 34 of 40 Drops This Grant And Date, Lat/Lon For Unit #33
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 55" N 86° 18' 24" W
Aquatic Life Ecosystem (Ale) NE Leg #3 2 Walter Tetrahedrons, 31 & 32 of 40 Drops This Grant And Date, Lat/Lon For Unit #31
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 53" N 86° 18' 29" W
Aquatic Life Ecosystem (Ale) NE Leg #4 2 Walter Tetrahedrons, 29 & 30 of 40 Drops This Grant And Date, Lat/Lon For Unit #29
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 51" N 86° 18' 35" W
Aquatic Life Ecosystem (Ale) NE Leg End 2 Walter Tetrahedrons, 35 & 36 of 40 Drops This Grant And Date, Lat/Lon For Unit #35
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 58" N 86° 18' 19" W
Aquatic Life Ecosystem (Ale) NW Leg #2 2 Walter Tetrahedrons, 3 & 4 of 40 Drops This Grant And Date, Lat/Lon For Unit #3
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 57" N 86° 18' 54" W
Aquatic Life Ecosystem (Ale) NW Leg #3 2 Walter Tetrahedrons, 5 & 6 of 40 Drops This Grant And Date, Lat/Lon For Unit #5
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 53" N 86° 18' 49" W
Aquatic Life Ecosystem (Ale) NW Leg #4 2 Walter Tetrahedrons, 7 & 8 of 40 Drops This Grant And Date, Lat/Lon For Unit #7
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 51" N 86° 18' 44" W
Aquatic Life Ecosystem (Ale) Nw Leg End 2 Walter Tetrahedrons, 1 & 2 of 40 Drops This Grant And Date, Lat/Lon For Unit #1
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 59" N 86° 18' 58" W
Aquatic Life Ecosystem (Ale) SE Leg #2 2 Walter Tetrahedrons, 17 & 18 of 40 Drops This Grant And Date, Lat/Lon For Unit #17
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 38" N 86° 18' 24" W
Aquatic Life Ecosystem (Ale) SE Leg #3 2 Walter Tetrahedrons, 15 & 16 of 40 Drops This Grant And Date, Lat/Lon For Unit #15
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 42" N 86° 18' 28" W
Aquatic Life Ecosystem (Ale) SE Leg #4 2 Walter Tetrahedrons, 13 & 14 of 40 Drops This Grant And Date, Lat/Lon For Unit #13
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 45" N 86° 18' 33" W
Aquatic Life Ecosystem (Ale) SE Leg End 4 Walter Tetrahedrons,19,20,21 & 22 of 40 Drops This Grant And Date, Lat/Lon For Unit #21
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 35" N 86° 18' 56" W
Aquatic Life Ecosystem (Ale) SW Leg #2 2 Walter Tetrahedrons, 23 & 24 of 40 Drops This Grant And Date, Lat/Lon For Unit #23
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 39" N 86° 18' 51" W
Aquatic Life Ecosystem (Ale) SW Leg #3 2 Walter Tetrahedrons, 25 & 26 of 40 Drops This Grant And Date, Lat/Lon For Unit #25
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 42" N 86° 18' 47" W
Aquatic Life Ecosystem (Ale) SW Leg #4 2 Walter Tetrahedrons, 27 & 28 of 40 Drops This Grant And Date, Lat/Lon For Unit #27
Primary Material: Module
Deploy Date: 2012/08/07
Depth: 121 ft

Relief: 8 ft [2]
Tides & Solunars
121 ft 30° 6' 45" N 86° 18' 43" W
Arizona Chemical Steel Heat Exchanger 4’ Diameter By 60’ Feet Long
Date of Deployment: May 30 2000
Primary Material: STEEL HEAT EXCHANGER
County: BAY
Depth: 66 ft

Relief: 4 ft [1]
Tides & Solunars
66 ft 29° 53' 21" N 85° 32' 0" W
B And B Reef Barge And Bridge Spans Hence The Name B And B Reef
Date of Deployment: February 8 1990
Primary Material: BARGE STEEL
County: BAY
Depth: 43 ft

Relief: 6 ft [1]
Tides & Solunars
43 ft 30° 4' 56" N 85° 42' 53" W
Barnacle Reef - #1 2 Walter Tetrahedrons, 1 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 107 ft

Relief: 10 ft [2]
Tides & Solunars
107 ft 30° 9' 25" N 86° 19' 12" W
Barnacle Reef - #10 2 Walter Tetrahedrons, 10 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 111 ft

Relief: 10 ft [2]
Tides & Solunars
111 ft 30° 8' 32" N 86° 19' 13" W
Barnacle Reef - #11 2 Walter Tetrahedrons, 11 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 114 ft

Relief: 10 ft [2]
Tides & Solunars
114 ft 30° 8' 42" N 86° 18' 55" W
Barnacle Reef - #12 2 Walter Tetrahedrons, 12 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 118 ft

Relief: 10 ft [2]
Tides & Solunars
118 ft 30° 8' 31" N 86° 18' 56" W
Barnacle Reef - #13 2 Walter Tetrahedrons, 13 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 118 ft

Relief: 10 ft [2]
Tides & Solunars
118 ft 30° 8' 50" N 86° 18' 39" W
Barnacle Reef - #14 2 Walter Tetrahedrons, 14 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 115 ft

Relief: 10 ft [2]
Tides & Solunars
115 ft 30° 9' 6" N 86° 18' 39" W
Barnacle Reef - #15 2 Walter Tetrahedrons, 15 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 116 ft

Relief: 10 ft [2]
Tides & Solunars
116 ft 30° 8' 57" N 86° 18' 19" W
Barnacle Reef - #2 2 Walter Tetrahedrons, 2 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 108 ft

Relief: 10 ft [2]
Tides & Solunars
108 ft 30° 9' 17" N 86° 19' 8" W
Barnacle Reef - #3 2 Walter Tetrahedrons, 3 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 108 ft

Relief: 10 ft [2]
Tides & Solunars
108 ft 30° 9' 23" N 86° 18' 55" W
Barnacle Reef - #4 2 Walter Tetrahedrons, 4 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 111 ft

Relief: 10 ft [2]
Tides & Solunars
111 ft 30° 9' 24" N 86° 18' 36" W
Barnacle Reef - #5 2 Walter Tetrahedrons, 5 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 113 ft

Relief: 10 ft [2]
Tides & Solunars
113 ft 30° 9' 17" N 86° 18' 41" W
Barnacle Reef - #6 2 Walter Tetrahedrons, 6 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 109 ft

Relief: 10 ft [2]
Tides & Solunars
109 ft 30° 9' 14" N 86° 18' 54" W
Barnacle Reef - #7 2 Walter Tetrahedrons, 7 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 106 ft

Relief: 10 ft [2]
Tides & Solunars
106 ft 30° 9' 6" N 86° 19' 12" W
Barnacle Reef - #8 2 Walter Tetrahedrons, 8 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 109 ft

Relief: 10 ft [2]
Tides & Solunars
109 ft 30° 8' 58" N 86° 19' 29" W
Barnacle Reef - #9 2 Walter Tetrahedrons, 9 of 15 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2006/04/03
Depth: 114 ft

Relief: 10 ft [2]
Tides & Solunars
114 ft 30° 8' 50" N 86° 19' 11" W
Barrier Dunes Barge 200 Foot Barge Wreck
Date of Deployment: December 31 1987
Primary Material: BARGE STEEL
County: GULF
Depth: 35 ft

Relief: 10 ft [1]
Tides & Solunars
35 ft 29° 45' 3" N 85° 25' 33" W
Baskins Barge 80x40 Tower Construction Barge
Primary Material: Vessel
Deploy Date: 1996/10/29
Depth: 140 ft

Relief: 30 ft [2]
Tides & Solunars
140 ft 30° 5' 11" N 86° 21' 20" W
Baxter Memorial Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 54' 49" N 85° 32' 33" W
Baxter Memorial Reef #2 Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Relief: 3 ft [1]
Tides & Solunars
29° 54' 54" N 85° 32' 31" W
Beach Barge Site - 331 Bridge 331 Bridge10 Pieces 5/21/91 Concrete Decks
Date of Deployment: May 21 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 9' 21" N 85° 47' 57" W
Beanie And Hosehead Reef 3 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 23 ft

Relief: 6 ft [1]
Tides & Solunars
23 ft 29° 53' 50" N 85° 28' 9" W
Bell Shoal 2 Nd Of Two Drops Of Reefballs This Date
Date of Deployment: June 14 2000
Primary Material: MODULES CONCRETE REEFBALLS (36)
Tonnage: 108
County: BAY
Depth: 21 ft

Relief: 6 ft [1]
Tides & Solunars
21 ft 29° 54' 29" N 85° 28' 28" W
Bell Shoal Culverts Junction Boxes And Manholes-Private Funding
Date of Deployment: December 10 1999
Primary Material: CONCRETE CULVERTS (40)
County: BAY
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 55' 9" N 85° 28' 49" W
Bell Shoal 1 1St Of Two Drops Of Reefballs This Date
Date of Deployment: June 14 2000
Primary Material: MODULES CONCRETE REEFBALLS (37)
Tonnage: 109
County: BAY
Depth: 21 ft

Relief: 6 ft [1]
Tides & Solunars
21 ft 29° 55' 21" N 85° 29' 6" W
Billie And Jack Smith Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 20 ft

Relief: 3 ft [1]
Tides & Solunars
20 ft 29° 54' 47" N 85° 28' 41" W
Bj Putnam Reef 174’ Steel Ship B.J. Putnam.
Date of Deployment: November 29 1993
Primary Material: SHIP STEEL 174’
County: BAY
Depth: 106 ft

Relief: 17 ft [1]
Tides & Solunars
106 ft 29° 55' 49" N 85° 50' 6" W
Blackfin Reef Blackfin Reef 10 Reefballs
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 60 ft

Relief: 3 ft [1]
Tides & Solunars
60 ft 29° 53' 6" N 85° 32' 6" W
Bobby Guilford Site Concrete Rubble Deployed In Two Trips This Day
Date of Deployment: August 9 2004
Primary Material: CONCRETE PILINGS
Tonnage: 412
County: BAY
Depth: 65 ft

Relief: 8 ft [1]
Tides & Solunars
65 ft 29° 53' 14" N 85° 32' 37" W
Brian Moeller Reef 2 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 22 ft

Relief: 6 ft [1]
Tides & Solunars
22 ft 29° 53' 57" N 85° 28' 16" W
Buoy Barge Barge
Date of Deployment: July 1 1994
Primary Material: BARGE STEEL
County: BAY
Depth: 60 ft

Relief: 4 ft [1]
Tides & Solunars
60 ft 30° 5' 0" N 85° 43' 57" W
C And C Barge 100 Foot Long Barge
Date of Deployment: July 15 1999
Primary Material: BARGE STEEL 100’
County: BAY
Depth: 108 ft

Relief: 7 ft [1]
Tides & Solunars
108 ft 29° 58' 25" N 85° 49' 36" W
C Of C Reef Concrete Rubble And Prefabricated Concrete
Date of Deployment: December 31 1964
Primary Material: CONCRETE RUBBLE
County: GULF
Depth: 40 ft
[1]
Tides & Solunars
40 ft 29° 49' 56" N 85° 29' 54" W
Captain Mike Neal's Reef 31 Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 53' 57" N 85° 30' 39" W
Captain Mike Neal's Reef#2 Funded By The Mexico Beach Artificial Reef Association
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Relief: 3 ft [1]
Tides & Solunars
29° 53' 55" N 85° 30' 42" W
Captain Toms Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 20 ft
[1]
Tides & Solunars
20 ft 29° 54' 6" N 85° 27' 34" W
Car Body Site Culverts Junction Boxes And Manholes-Private Funding
Date of Deployment: December 19 1999
Primary Material: CONCRETE CULVERTS (30)
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 20" N 85° 32' 58" W
Car Body Site Ave. Center Of 21 Modules 21-Fish Havens (Fh) (Complex#2 Of 5)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(21)
Tonnage: 23
County: BAY
Depth: 65 ft

Relief: 5 ft [1]
Tides & Solunars
65 ft 29° 53' 26" N 85° 32' 41" W
Car Body Site Ave. Center Of 22 Modules 12-Fht 8 Fh And 2 Fhjr (Complex#1)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(22)
Tonnage: 32
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 38" N 85° 31' 36" W
Car Body Site Ave. Center Of 16 Modules Fish Haven Towers(Complex#3 Of 5 )
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(16)
Tonnage: 30
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 39" N 85° 32' 23" W
Car Body Site Culverts Junction Boxes And Manholes-Private Funding
Date of Deployment: December 19 1999
Primary Material: CONCRETE CULVERTS
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 53' 47" N 85° 32' 49" W
Car Body Site 98 Large Reefballs In Two Stacks On Each Site Of Barge
Date of Deployment: June 14 2001
Primary Material: MODULES CONCRETE REEFBALLS (98)
Tonnage: 183.6
County: BAY
Depth: 54 ft

Relief: 8 ft [1]
Tides & Solunars
54 ft 29° 53' 53" N 85° 31' 47" W
Car Body Site Center Of 12 Modules Fish Haven Tower Units (Complex# 4 Of 5 )
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(12)
Tonnage: 23
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 54' 24" N 85° 32' 10" W
Car Body Site Center Of 8 Modules Fish Haven Tower Units (Complex# 5 Of 5 )
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(8)
Tonnage: 15
County: BAY
Depth: 65 ft

Relief: 6 ft [1]
Tides & Solunars
65 ft 29° 54' 49" N 85° 32' 5" W
Carbody 105 Reefballs Two Drop Dates Also 7/8/03
Date of Deployment: June 26 2003
Primary Material: MODULES CONCRETE REEFBALLS (105)
Tonnage: 364.84
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 29° 53' 38" N 85° 32' 38" W
Carbody 95 Reefballs All In One Location
Date of Deployment: June 12 2002
Primary Material: MODULES CONCRETE REEFBALLS (95)
Tonnage: 183.6
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 29° 53' 47" N 85° 32' 1" W
Carbody 38 Reefballs Two Drop Dates Also 4/22/04
Date of Deployment: June 8 2004
Primary Material: MODULES CONCRETE REEFBALLS (38)
County: BAY
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 29° 53' 52" N 85° 32' 34" W
Carbody 37 Goliath Reefballs 1 Of 2 Drop Dates Also 6/8/04
Date of Deployment: April 22 2004
Primary Material: MODULES CONCRETE REEFBALLS (37)
County: BAY
Depth: 60 ft

Relief: 6 ft [1]
Tides & Solunars
60 ft 29° 53' 53" N 85° 32' 36" W
Carbody-Mbara 4 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (4)
Tonnage: 4
County: BAY
Depth: 60 ft

Relief: 10 ft [1]
Tides & Solunars
60 ft 29° 54' 8" N 85° 32' 23" W
Century/Cobia Barge 105 X 25 X 8 Steel Barge Placed By Pcmi
Date of Deployment: December 2 1999
Primary Material: BARGE STEEL 105’
County: BAY
Depth: 98 ft

Relief: 8 ft [1]
Tides & Solunars
98 ft 29° 58' 25" N 85° 49' 36" W
Charles House Reef 5 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 9" N 85° 32' 36" W
Chepanoc - Starfish Reef 129 X 24 X28’ Tugboat, the "Chepanoc" Funded by County TDC
Primary Material: Vessel
Deploy Date: 2005/12/01
Depth: 107 ft

Relief: 28 ft [2]
Tides & Solunars
107 ft 30° 8' 49" N 86° 37' 38" W
Chickasaw 107 Feet Long Naval Tugboat The Chickasaw
Date of Deployment: December 31 1970
Primary Material: SHIP STEEL 107’
County: BAY
Depth: 70 ft

Relief: 6 ft [1]
Tides & Solunars
70 ft 30° 4' 55" N 85° 46' 46" W
Chippewa 204 Foot Tugboat The Chippewa
Date of Deployment: February 8 1990
Primary Material: SHIP STEEL TUG 205’
County: BAY
Depth: 102 ft

Relief: 28 ft [1]
Tides & Solunars
102 ft 29° 57' 41" N 85° 48' 28" W
Conch Reef NE - #1 2 Walter Tetrahedrons, 17 & 18 of 32 Drops This Grant And Date, Lat/Lon For Unit #18
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 24" N 86° 22' 8" W
Conch Reef NE - #2 2 Walter Tetrahedrons, 19 & 20 of 32 Drops This Grant And Date, Lat/Lon For Unit #19
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 27" N 86° 22' 5" W
Conch Reef NE - #3 2 Walter Tetrahedrons, 21 & 22 of 32 Drops This Grant And Date, Lat/Lon For Unit #21
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 30" N 86° 22' 2" W
Conch Reef NE - #4 2 Walter Tetrahedrons, 23 & 24 of 32 Drops This Grant And Date, Lat/Lon For Unit #23
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 33" N 86° 21' 58" W
Conch Reef NW - #1 2 Walter Tetrahedrons, 15 & 16 of 32 Drops This Grant And Date, Lat/Lon For Unit #16
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 24" N 86° 22' 14" W
Conch Reef NW - #2 2 Walter Tetrahedrons, 13 & 14 of 32 Drops This Grant And Date, Lat/Lon For Unit #14
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 27" N 86° 22' 17" W
Conch Reef NW - #3 2 Walter Tetrahedrons, 11 & 12 of 32 Drops This Grant And Date, Lat/Lon For Unit #12
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 30" N 86° 22' 21" W
Conch Reef NW - #4 2 Walter Tetrahedrons, 9 & 10 of 32 Drops This Grant And Date, Lat/Lon For Unit #9
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 33" N 86° 22' 24" W
Conch Reef SE - #1 2 Walter Tetrahedrons, 25 & 26 of 32 Drops This Grant And Date, Lat/Lon For Unit #25
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 19" N 86° 22' 7" W
Conch Reef SE - #2 2 Walter Tetrahedrons, 27 & 28 of 32 Drops This Grant And Date, Lat/Lon For Unit #27
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 16" N 86° 22' 4" W
Conch Reef SE - #3 2 Walter Tetrahedrons, 29 & 30 of 32 Drops This Grant And Date, Lat/Lon For Unit #29
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 13" N 86° 22' 1" W
Conch Reef SE - #4 2 Walter Tetrahedrons, 31 & 32 of 32 Drops This Grant And Date, Lat/Lon For Unit #31
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 10" N 86° 21' 58" W
Conch Reef SW - #1 2 Walter Tetrahedrons, 1 & 2 of 32 Drops This Grant And Date, Lat/Lon For Unit #2
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 19" N 86° 22' 14" W
Conch Reef SW - #2 2 Walter Tetrahedrons, 3 & 4 of 32 Drops This Grant And Date, Lat/Lon For Unit #3
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 16" N 86° 22' 17" W
Conch Reef SW - #3 2 Walter Tetrahedrons, 7 & 8 of 32 Drops This Grant And Date, Lat/Lon For Unit #7
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 13" N 86° 22' 19" W
Conch Reef SW - #4 2 Walter Tetrahedrons, 5 & 6 of 32 Drops This Grant And Date, Lat/Lon For Unit #5
Primary Material: Module
Deploy Date: 2011/07/28
Depth: 117 ft

Relief: 8 ft [2]
Tides & Solunars
117 ft 30° 9' 10" N 86° 22' 24" W
Dan Barge 100 Foot Long Barge
Date of Deployment: July 1 2000
Primary Material: BARGE STEEL 100’
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 30° 4' 50" N 85° 43' 51" W
Davis Barge Davis Barge
Date of Deployment:
Primary Material: BARGE STEEL
County: BAY
Depth: 55 ft
[1]
Tides & Solunars
55 ft 30° 0' 27" N 85° 36' 28" W
DEP FLAP No Name Reef - #1 Twelve (12) Concrete Culverts, Paired 50ft apart
Primary Material: Culverts
Deploy Date: 1996/05/21
Depth: 137 ft

Relief: 3 ft [2]
Tides & Solunars
137 ft 30° 5' 8" N 86° 22' 5" W
DEP FLAP No Name Reef - #2 6 4th Load of 6, Also (#4)370.0/015.0, (#5)780.1/010.1
Primary Material: Culverts
Deploy Date: 1996/05/21
Depth: 140 ft

Relief: 6 ft [2]
Tides & Solunars
140 ft 30° 3' 13" N 86° 19' 26" W
DEP FLAP No Name Reef - #3 Concrete Culverts 4th of 6 Loads This Date
Primary Material: Culverts
Deploy Date: 1996/05/21
Depth: 140 ft
[2]
Tides & Solunars
140 ft 30° 3' 54" N 86° 19' 35" W
DEP FLAP No Name Reef - #4 Concrete Culverts 5th of 6 Loads This Date
Primary Material: Culverts
Deploy Date: 1996/05/21
Depth: 140 ft
[2]
Tides & Solunars
140 ft 30° 3' 25" N 86° 18' 14" W
DEP FLAP No Name Reef - #5 Concrete Culverts 3rd of 6 Loads On This Date
Primary Material: Culverts
Deploy Date: 1996/05/21
Depth: 140 ft
[2]
Tides & Solunars
140 ft 30° 4' 31" N 86° 20' 48" W
DEP LAP Valp - #1 1 1st of 3 Loads, 39 Pallet Balls
Primary Material: Module
Deploy Date: 1995/03/24
Depth: 105 ft

Relief: 5 ft [2]
Tides & Solunars
105 ft 30° 8' 52" N 86° 24' 47" W
DEP LAP Valp - #2 2nd of 3 Loads, 42 Pallet Balls
Primary Material: Module
Deploy Date: 1995/05/22
Depth: 105 ft

Relief: 5 ft [2]
Tides & Solunars
105 ft 30° 8' 53" N 86° 24' 49" W
DEP LAP Valp - #3 3rd of 3 Loads of Pallet Reef Balls
Primary Material: Module
Deploy Date: 1995/06/20
Depth: 105 ft

Relief: 4 ft [2]
Tides & Solunars
105 ft 30° 9' 52" N 86° 24' 47" W
DEP LAP Valp - #4 Mixer Drums and Concrete Culverts
Primary Material: Rubble
Deploy Date: 1996/03/22
Depth: 105 ft

Relief: 9 ft [2]
Tides & Solunars
105 ft 30° 9' 49" N 86° 24' 46" W
Destin Reef "02" 57 Modules, Various Sizes
Primary Material: Module
Deploy Date: 2002/06/07
Depth: 106 ft

Relief: 6 ft [2]
Tides & Solunars
106 ft 30° 8' 60" N 86° 33' 20" W
Don Ard Memorial Reef 3 Walter Coqunia Florida Special Units Funded By Private Funds
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS COQUINA (3
Tonnage: 7.5
County: BAY
Depth: 124 ft

Relief: 10 ft [1]
Tides & Solunars
124 ft 29° 45' 20" N 85° 52' 22" W
Eglin Landing Craft #2 74’ X 21’ Navy Landing Craft (LCM-1) From Eglin Air Force Base
Primary Material: Vessel
Deploy Date: 1991/09/00
Depth: 103 ft

Relief: 20 ft [2]
Tides & Solunars
103 ft 30° 9' 42" N 86° 19' 38" W
Elvira The Elvira About 200 Feet West Of The Pcmi Barge
Date of Deployment:
Primary Material: SHIP STEEL 70
County: BAY
Depth: 70 ft
[1]
Tides & Solunars
70 ft 30° 6' 42" N 85° 49' 48" W
F-106 Airplanes 3 - F106 Drone Airplanes Initiated By Hurlburt Afb
Date of Deployment: September 25 1995
Primary Material: AIRPLANES F-106 (3)
County: BAY
Depth: 112 ft

Relief: 8 ft [1]
Tides & Solunars
112 ft 30° 0' 46" N 85° 58' 7" W
Fami Tug #1 First Of Two Steel Derelict Tugboats Removed By Fwc-And Fami
Date of Deployment: July 10 2003
Primary Material: SHIP STEEL TUGBOAT HULL 85’
County: BAY
Depth: 100 ft

Relief: 20 ft [1]
Tides & Solunars
100 ft 29° 58' 7" N 85° 51' 16" W
Fami Tug #2 Second Of Two Steel Derelict Tugboats Removed By Fwc And Fami
Date of Deployment: July 11 2003
Primary Material: SHIP STEEL TUGBOAT 95’
County: BAY
Depth: 100 ft

Relief: 30 ft [1]
Tides & Solunars
100 ft 29° 58' 7" N 85° 51' 16" W
Fish America Foundation Reef 100 Reefballs Funded By ,30000 Fish America Grant
Date of Deployment: February 12 2003
Primary Material: MODULES CONCRETE REEFBALLS (100)
Tonnage: 200
County: BAY
Depth: 67 ft

Relief: 8 ft [1]
Tides & Solunars
67 ft 29° 53' 38" N 85° 32' 38" W
Fontainbleau Site #7 Bundled Tires 15Th Of 16 Loads This Grant
Date of Deployment: September 16 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 9' 52" N 85° 53' 27" W
Fontainbleau Site #7 Scrap Steel 8Th Of 16 Loads This Grant
Date of Deployment: July 29 1980
Primary Material: STEEL SCRAP
County: BAY [1]
Tides & Solunars
30° 9' 52" N 85° 53' 27" W
Fountainbleau Boxcars Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: BAY
Depth: 75 ft
[1]
Tides & Solunars
75 ft 30° 9' 0" N 85° 52' 60" W
Fountainbleau Site #7 Concrete Rubble 5Th Of 16 Loads This Grant
Date of Deployment: July 3 1980
Primary Material: CONCRETE RUBBLE
County: BAY [1]
Tides & Solunars
30° 9' 52" N 85° 53' 27" W
Fountainbleau Site #7 8 Bridge Spans 2Nd Of 16 Loads This Grant
Date of Deployment: June 19 1980
Primary Material: BRIDGE SPANS CONCRETE (8)
Tonnage: 121
County: BAY [1]
Tides & Solunars
30° 9' 52" N 85° 53' 27" W
G . Merrill Clift Memorial Reef 1 Walter Coqunia Florida Special Units Funded By Private Funds
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS COQUINA (1
Tonnage: 2.5
County: BAY
Depth: 128 ft

Relief: 10 ft [1]
Tides & Solunars
128 ft 29° 44' 27" N 85° 52' 23" W
Gateway Barge 70 Foot Barge Steel Tanks Tires And Boxcars
Date of Deployment: December 31 1988
Primary Material: BARGE STEEL 70’
County: GULF
Depth: 80 ft

Relief: 8 ft [1]
Tides & Solunars
80 ft 29° 50' 14" N 85° 34' 52" W
Grey Ghost - Archer Bundled Tires
Date of Deployment: December 31 1987
Primary Material: TIRES
County: BAY
Depth: 105 ft
[1]
Tides & Solunars
105 ft 30° 2' 49" N 86° 5' 32" W
Grey Ghost - Blount Fiberglass Boats Tires Scrap Steel
Date of Deployment: December 31 1987
Primary Material: SHIP FIBERGLASS
County: BAY
Depth: 105 ft
[1]
Tides & Solunars
105 ft 30° 2' 30" N 86° 5' 42" W
Grey Ghost - Ship 105 Foot Navy Tugboat The Grey Ghost
Date of Deployment: July 12 1978
Primary Material: SHIP STEEL 105’
County: BAY
Depth: 105 ft
[1]
Tides & Solunars
105 ft 30° 2' 49" N 86° 5' 32" W
Hammerhead Reef Hammerhead Reefs 10 Reefballs
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 45 ft

Relief: 3 ft [1]
Tides & Solunars
45 ft 29° 53' 19" N 85° 31' 27" W
Hathaway Span #10 -Stage 1 West #10 H. Bridge 5/7/88 Steel Truss Spans
Date of Deployment: May 7 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 114 ft

Relief: 36 ft [1]
Tides & Solunars
114 ft 30° 1' 28" N 85° 57' 45" W
Hathaway Span #7 -Stage 1 West #7 H. Bridge 5/6/88 Steel Truss
Date of Deployment: May 6 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 111 ft

Relief: 36 ft [1]
Tides & Solunars
111 ft 29° 59' 8" N 85° 57' 1" W
Hathaway Span #8 -Stage 1 West #8 H. Bridge 5/6/88 Steel Truss Spans
Date of Deployment: May 6 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 113 ft

Relief: 36 ft [1]
Tides & Solunars
113 ft 29° 59' 53" N 85° 56' 54" W
Hathaway Span #9 -Stage 1 West #9 H. Bridge 5/7/88 Steel Truss Spans
Date of Deployment: May 7 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 113 ft

Relief: 36 ft [1]
Tides & Solunars
113 ft 30° 0' 32" N 85° 56' 59" W
Hathaway Bridge 1 Finish Large Concrete Beams 66 Ft Long End Of May 6 Drop 1 Of 2 Drops
Date of Deployment: May 6 2004
Primary Material: BRIDGE CONCRETE BEAMS
Tonnage: 4187
County: BAY [1]
Tides & Solunars
30° 3' 12" N 85° 58' 24" W
Hathaway Bridge 1 Start Large Concrete Beams 66 Ft Long Start Of May 6 Drop 1 Of 2 Drops
Date of Deployment: May 6 2004
Primary Material: BRIDGE CONCRETE BEAMS
Tonnage: 4187
County: BAY [1]
Tides & Solunars
30° 4' 36" N 85° 58' 12" W
Hathaway Bridge 2 Finish Large Concrete Beams 66 Ft Long End Of May 14 Drop 2 Of 2 Drops
Date of Deployment: May 14 2004
Primary Material: BRIDGE CONCRETE BEAMS
Tonnage: 4187
County: BAY [1]
Tides & Solunars
29° 58' 18" N 85° 51' 30" W
Hathaway Bridge 2 Start Large Concrete Beams 66 Ft Long Start Of May 14 Drop 2 Of 2 Drops
Date of Deployment: May 14 2004
Primary Material: BRIDGE CONCRETE BEAMS
Tonnage: 4187
County: BAY [1]
Tides & Solunars
29° 59' 6" N 85° 51' 12" W
Hathaway Rubble-#16 #16 H.Bridge3 Spans5/11/88Concrete Decks
Date of Deployment: May 11 1988
Primary Material: BRIDGE SLABS CONCRETE
Tonnage: 80
County: BAY
Depth: 75 ft

Relief: 8 ft [1]
Tides & Solunars
75 ft 30° 4' 7" N 85° 49' 27" W
Hathaway Span #1 - Midway Site #1 H. Bridge 4/29/88Steel Truss Spans
Date of Deployment: April 29 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 72 ft

Relief: 37 ft [1]
Tides & Solunars
72 ft 30° 2' 40" N 85° 43' 44" W
Hathaway Span #12 -Midway Site #12 H. Bridge 5/9/88 Steel Truss Spans
Date of Deployment: May 9 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 72 ft

Relief: 27 ft [1]
Tides & Solunars
72 ft 30° 2' 5" N 85° 43' 54" W
Hathaway Span #13 -Stage 1 East #13 H. Bridge 5/9/88 Steel Truss Spans
Date of Deployment: May 9 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 100 ft

Relief: 36 ft [1]
Tides & Solunars
100 ft 29° 57' 24" N 85° 50' 31" W
Hathaway Span #14 Warsaw Site #14 H. Bridge 5/10/88 Steel Truss Spans
Date of Deployment: May 10 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 75 ft

Relief: 20 ft [1]
Tides & Solunars
75 ft 30° 4' 17" N 85° 48' 53" W
Hathaway Span #2 -Midway Site #2 H. Bridge 4/30/88 Steel Truss Spans
Date of Deployment: April 30 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 70 ft

Relief: 15 ft [1]
Tides & Solunars
70 ft 30° 2' 13" N 85° 43' 40" W
Hathaway Span #3 - Stage 1 East #3 H. Bridge 5/2/88 Steel Truss Spans Lor
Date of Deployment: May 2 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 105 ft
[1]
Tides & Solunars
105 ft 29° 56' 35" N 85° 49' 18" W
Hathaway Span #3A - Stage 1 East #3A H. Bridge 5/2/88 Steel Truss Spans
Date of Deployment: May 2 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 100 ft

Relief: 36 ft [1]
Tides & Solunars
100 ft 29° 56' 41" N 85° 49' 7" W
Hathaway Span #4 - Stage 1 East #4 H. Bridge 5/3/88 Steel Truss Spans
Date of Deployment: May 3 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 101 ft

Relief: 36 ft [1]
Tides & Solunars
101 ft 29° 56' 41" N 85° 49' 47" W
Hathaway Span #5 -Fontainbleau #5 H. Bridge 5/4/88 Steel Truss Spans
Date of Deployment: May 4 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 73 ft

Relief: 36 ft [1]
Tides & Solunars
73 ft 30° 9' 51" N 85° 53' 49" W
Hathaway Span #6 -Fontainbleau #6 H. Bridge 5/4/88 Steel Truss Spans
Date of Deployment: May 4 1988
Primary Material: BRIDGE SPANS STEEL
Tonnage: 360
County: BAY
Depth: 73 ft

Relief: 36 ft [1]
Tides & Solunars
73 ft 30° 8' 55" N 85° 53' 16" W
Hathaway-Rubble #15 #15 H.Bridge3 Spans5/11/88Concrete Decks
Date of Deployment: May 11 1988
Primary Material: BRIDGE SLABS
Tonnage: 80
County: BAY
Depth: 71 ft

Relief: 8 ft [1]
Tides & Solunars
71 ft 30° 9' 52" N 85° 53' 8" W
Highway 79 Bridge 400 Cubic Yards Of Concrete Bridge Spans.
Date of Deployment: May 13 1993
Primary Material: BRIDGE RUBBLE
County: BAY
Depth: 74 ft
[1]
Tides & Solunars
74 ft 30° 3' 34" N 85° 49' 23" W
Highway 79 Bridge 400 Cubic Yards Of Concrete Bridge Spans.
Date of Deployment: May 10 1993
Primary Material: BRIDGE RUBBLE
County: BAY
Depth: 74 ft
[1]
Tides & Solunars
74 ft 30° 3' 43" N 85° 49' 18" W
Hovercraft-Llcat 100 Feet Long Navy Hovercraft 8/18/95
Date of Deployment: August 18 1995
Primary Material: SHIP STEEL 100’ HOVERCRAFT
County: BAY
Depth: 74 ft

Relief: 10 ft [1]
Tides & Solunars
74 ft 30° 4' 15" N 85° 48' 43" W
Inshore Mexico Bch - Amberjack 9 4Th Of 11 Drops This Date Amberjack 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 25" N 85° 24' 18" W
Inshore Mexico Bch - Cobia 9 4Th Of 11 Drops This Date Cobia 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 23" N 85° 24' 19" W
Inshore Mexico Bch - Grouper 10 4Th Of 11 Drops This Date Grouper 5 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 25 ft

Relief: 4 ft [1]
Tides & Solunars
25 ft 29° 54' 24" N 85° 24' 15" W
Inshore Site #1 Ave. Center Of 8 Modules 8-Fish Haven Units (Fh) (Complex#4)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(8)
Tonnage: 8
County: BAY
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 29° 54' 52" N 85° 24' 19" W
Inshore Site #1 Ave. Center Of 12 Modules 12-Fish Haven Units (Fh) (Complex#3)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(12)
Tonnage: 12
County: BAY
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 29° 54' 57" N 85° 24' 22" W
Inshore Site #1 Ave. Center Of 21 Modules 21-Fish Haven Units (Fh) (Complex#2)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(21)
Tonnage: 21
County: BAY
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 29° 55' 2" N 85° 24' 26" W
Inshore Site #1 Ave. Center Of 22 Modules 12-Fht 8 Fh And 2 Fhjr (Complex#1)
Date of Deployment: June 3 1999
Primary Material: MODULES CONCRETE FISH HAVENS(22)
Tonnage: 30
County: BAY
Depth: 25 ft

Relief: 6 ft [1]
Tides & Solunars
25 ft 29° 55' 7" N 85° 24' 30" W
Japan Frp Tube Reef 21’ X 18’ Fiberglass Module 1 Of 4 Loads
Date of Deployment: August 28 1981
Primary Material: MODULES FIBERGLASS
County: BAY
Depth: 75 ft

Relief: 12 ft [1]
Tides & Solunars
75 ft 30° 2' 20" N 85° 47' 24" W
Japan Frp Tube Reef 21’ X 18’ Fiberglass Module 1 Of 4 Loads
Date of Deployment: August 28 1981
Primary Material: MODULES FIBERGLASS
County: BAY
Depth: 74 ft

Relief: 15 ft [1]
Tides & Solunars
74 ft 30° 2' 23" N 85° 47' 23" W
Japan Reference Reef1 Concrete Culverts Reference Reefs Near Japan Reefs 3 Of 4 Loads
Date of Deployment: September 22 1981
Primary Material: CONCRETE CULVERTS
County: BAY
Depth: 75 ft

Relief: 3 ft [1]
Tides & Solunars
75 ft 30° 2' 1" N 85° 47' 31" W
Japan Reference Reef2 Concrete Culverts Reference Reefs Near Japan Reefs 4 Of 4 Loads
Date of Deployment: September 29 1981
Primary Material: CONCRETE CULVERTS
County: BAY
Depth: 75 ft

Relief: 3 ft [1]
Tides & Solunars
75 ft 30° 2' 1" N 85° 47' 31" W
Jaycee Reef Concrete Rubble Car Bodies And Steel Containers
Date of Deployment: December 31 1987
Primary Material: CONCRETE RUBBLE
County: GULF
Depth: 45 ft

Relief: 10 ft [1]
Tides & Solunars
45 ft 29° 50' 18" N 85° 29' 32" W
Jaycee Reef Concrete Rubble And Steel Containers.
Date of Deployment: March 1 1990
Primary Material: CONCRETE CULVERTS
County: GULF [1]
Tides & Solunars
29° 50' 25" N 85° 29' 25" W
LA-1L (S36) Center 7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron
Primary Material: Module
Deploy Date: 2020/05/27
Depth: 143 ft

Relief: 15 ft [2]
Tides & Solunars
143 ft 30° 5' 34" N 86° 24' 10" W
LA-2L (S37) Center 7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron
Primary Material: Module
Deploy Date: 2020/05/27
Depth: 146 ft

Relief: 15 ft [2]
Tides & Solunars
146 ft 30° 5' 4" N 86° 24' 45" W
LA-3L (S38) Center 7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron
Primary Material: Module
Deploy Date: 2020/05/27
Depth: 153 ft

Relief: 15 ft [2]
Tides & Solunars
153 ft 30° 5' 4" N 86° 24' 10" W
LA-4L (S39) Center 7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron
Primary Material: Module
Deploy Date: 2020/05/27
Depth: 146 ft

Relief: 15 ft [2]
Tides & Solunars
146 ft 30° 5' 4" N 86° 23' 36" W
LA-5L (S40) Center 7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron
Primary Material: Module
Deploy Date: 2020/05/27
Depth: 147 ft

Relief: 15 ft [2]
Tides & Solunars
147 ft 30° 4' 34" N 86° 24' 10" W
LAARS Site A - M-60 Tank #10 (E5) M-60 Tank E5 - Tank laying on side
Primary Material: Tank
Deploy Date: 1994/12/19
Depth: 107 ft

Relief: 12 ft [2]
Tides & Solunars
107 ft 30° 9' 4" N 86° 24' 8" W
LAARS Site A - M-60 Tank #11 (E1) M-60 Tank E1 - Tank laying on side
Primary Material: Tank
Deploy Date: 1994/12/19
Depth: 110 ft

Relief: 12 ft [2]
Tides & Solunars
110 ft 30° 9' 2" N 86° 24' 3" W
LAARS Site A - M-60 Tank #12 LAARS Site A-Tank #12-Deep
Primary Material: Tank
Deploy Date: 1994/12/19
Depth: 113 ft

Relief: 12 ft [2]
Tides & Solunars
113 ft 30° 8' 42" N 86° 23' 8" W
LAARS Site A - M-60 Tank #13 M-60 Tank - Tank Upright
Primary Material: Tank
Deploy Date: 1994/12/19
Depth: 121 ft

Relief: 12 ft [2]
Tides & Solunars
121 ft 30° 8' 26" N 86° 22' 23" W
LAARS Site A - M-60 Tank #14 M-60 Tank - Tank Upside Down
Primary Material: Tank
Deploy Date: 1994/12/19
Depth: 105 ft

Relief: 12 ft [2]
Tides & Solunars
105 ft 30° 8' 32" N 86° 21' 31" W
Liberty Ship-Uss Grierson Liberty Ship The Benjamin H. Grierson
Date of Deployment: July 31 1977
Primary Material: SHIP STEEL 441’
County: BAY
Depth: 72 ft

Relief: 20 ft [1]
Tides & Solunars
72 ft 29° 59' 4" N 85° 42' 44" W
Life Boats (Bay) 7 Lifeboats Tied Together
Date of Deployment:
Primary Material: SHIP STEEL (7)
County: BAY
Depth: 25 ft
[1]
Tides & Solunars
25 ft 30° 6' 57" N 85° 42' 21" W
Lindberg Circle Reef - 1A 1st of 10 Drops This Day, 5 Drops This Reef Destin -Lindberg 1A
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 107 ft

Relief: 6 ft [2]
Tides & Solunars
107 ft 30° 9' 54" N 86° 17' 5" W
Lindberg Circle Reef - 1B 2nd of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1B
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 107 ft

Relief: 6 ft [2]
Tides & Solunars
107 ft 30° 10' 5" N 86° 16' 59" W
Lindberg Circle Reef - 1C 3rd of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1C
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 107 ft

Relief: 6 ft [2]
Tides & Solunars
107 ft 30° 10' 4" N 86° 16' 49" W
Lindberg Circle Reef - 1D 4th of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1D
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 107 ft

Relief: 6 ft [2]
Tides & Solunars
107 ft 30° 9' 55" N 86° 16' 40" W
Lindberg Circle Reef - 1E 5th of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1E
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 107 ft

Relief: 6 ft [2]
Tides & Solunars
107 ft 30° 9' 58" N 86° 16' 56" W
Loss Pontoon Concrete And Metal 3 Loads Also 10/8/81 And 8/13/81
Date of Deployment: April 21 1982
Primary Material: CONCRETE CULVERTS
County: BAY
Depth: 66 ft

Relief: 5 ft [1]
Tides & Solunars
66 ft 30° 0' 53" N 85° 41' 29" W
Loss Pontoon Site - Hath #19 H.Bridge4 Spans5/14/88Concrete Decks
Date of Deployment: May 14 1988
Primary Material: BRIDGE SLABS CONCRETE
Tonnage: 80
County: BAY
Depth: 45 ft
[1]
Tides & Solunars
45 ft 30° 5' 8" N 85° 43' 24" W
Loss Pontoon #3- Scrap Metal And Concrete 8Th Of 11 Loads This Grant
Date of Deployment: August 13 1981
Primary Material: METAL SCRAP
County: BAY [1]
Tides & Solunars
30° 5' 20" N 85° 43' 55" W
Loss Pontoon Site Scrap Steel Tank Tires And Concrete Rubble
Date of Deployment: July 1 1978
Primary Material: STEEL SCRAP TANK
County: BAY
Depth: 65 ft

Relief: 25 ft [1]
Tides & Solunars
65 ft 30° 4' 58" N 85° 44' 7" W
Lst Port St. Joe 75 Foot Long Steel Lst
Date of Deployment: December 31 1993
Primary Material: SHIP STEEL LAST 75’
County: GULF
Depth: 90 ft

Relief: 10 ft [1]
Tides & Solunars
90 ft 29° 40' 25" N 85° 30' 38" W
M/V Angelina B. M/V "Angelina B", In Okaloosa Large Area "C"
Primary Material: Vessel
Deploy Date: 1999/06/23
Depth: 135 ft

Relief: 35 ft [2]
Tides & Solunars
135 ft 30° 7' 23" N 86° 36' 42" W
M/V Deborah 135’ Tugboat The M/V Deborah, Okaloosa Flap "C" Site
Primary Material: Vessel
Deploy Date: 1999/06/23
Depth: 135 ft

Relief: 40 ft [2]
Tides & Solunars
135 ft 30° 7' 30" N 86° 35' 24" W
M/V Prewitt 80’ Long Tugboat The M/V Prewitt, DEP Flap Site
Primary Material: Vessel
Deploy Date: 1998/06/10
Depth: 137 ft

Relief: 30 ft [2]
Tides & Solunars
137 ft 30° 3' 42" N 86° 18' 28" W
Mb-82 1 Walter Coqunia Florida Special Units Funded By Mbara
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS COQUINA (1
Tonnage: 2.5
County: BAY
Depth: 124 ft

Relief: 10 ft [1]
Tides & Solunars
124 ft 29° 46' 11" N 85° 51' 12" W
Mb-84 3 Walter Coqunia Florida Special Units Funded By Mbara
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS COQUINA (3
Tonnage: 7.5
County: BAY
Depth: 124 ft

Relief: 10 ft [1]
Tides & Solunars
124 ft 29° 45' 20" N 85° 53' 43" W
Mb-88-A1 5 Walter Florida Special Modules 1 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 29" N 85° 52' 2" W
Mb-88-B1 5 Walter Florida Special Modules 2 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 31" N 85° 51' 59" W
Mb-88-C1 5 Walter Florida Special Modules 3 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 29" N 85° 52' 0" W
Mb-88-D1 5 Walter Florida Special Modules 4 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 29" N 85° 51' 60" W
Mb-88-E1 5 Walter Florida Special Modules 5 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 28" N 85° 51' 59" W
Mb-88-F1 5 Walter Florida Special Modules 6 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 29" N 85° 51' 59" W
Mb-88-G1 5 Walter Florida Special Modules 7 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 29" N 85° 51' 59" W
Mb-88-H1 5 Walter Florida Special Modules 8 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 29" N 85° 51' 59" W
Mb-88-I1 5 Walter Florida Special Modules 9 Of 9 Drops This Grant
Date of Deployment: April 25 2006
Primary Material: MODULES CONCRETE WALTERS FL (5)
Tonnage: 10
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 47' 28" N 85° 51' 58" W
Mbara Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: STEEL COUNTERS (14)
County: BAY
Depth: 20 ft
[1]
Tides & Solunars
20 ft 29° 56' 21" N 85° 29' 49" W
Mbara Barge Steel Hopper Barge 195’X30’x12’ With Steel Pipes Mbara Funded ,25000
Date of Deployment: June 19 2001
Primary Material: BARGE STEEL 195’
County: BAY
Depth: 71 ft

Relief: 12 ft [1]
Tides & Solunars
71 ft 29° 53' 9" N 85° 32' 48" W
Mbara Barge Addition 1 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 68 ft

Relief: 6 ft [1]
Tides & Solunars
68 ft 29° 53' 9" N 85° 32' 48" W
Mbara-Laars-1 4 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (4)
Tonnage: 8
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 46' 60" N 85° 50' 0" W
Mbara-Laars-2 2 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (2)
Tonnage: 4
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 46' 59" N 85° 51' 11" W
Mbara-Laars-3 4 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (4)
Tonnage: 8
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 46' 59" N 85° 52' 25" W
Mbara-Laars-4 1 Walter Florida Special Module Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (1)
Tonnage: 2
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 46' 12" N 85° 51' 12" W
Mbara-Laars-5 3 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (3)
Tonnage: 3
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 45' 20" N 85° 51' 12" W
Mbara-Laars-6 3 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (3)
Tonnage: 3
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 45' 21" N 85° 53' 44" W
Mbara-Laars-7 2 Walter Florida Special Modules Funded By Mbara
Date of Deployment: January 11 2005
Primary Material: MODULES CONCRETE WALTERS FL (2)
Tonnage: 2
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 44' 26" N 85° 53' 46" W
Mc Comick Barge Barge
Date of Deployment: August 1 1994
Primary Material: BARGE STEEL
County: BAY
Depth: 60 ft

Relief: 5 ft [1]
Tides & Solunars
60 ft 30° 4' 27" N 85° 42' 22" W
Mexico Beach Site - #1 Scrap Steel And Tires
Date of Deployment: December 31 1979
Primary Material: STEEL SCRAP
County: GULF
Depth: 54 ft
[1]
Tides & Solunars
54 ft 29° 54' 4" N 85° 31' 60" W
Mexico Beach Site - #2 Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: GULF
Depth: 55 ft

Relief: 10 ft [1]
Tides & Solunars
55 ft 29° 54' 4" N 85° 31' 60" W
Mexico Beach Site - #3 Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: GULF
Depth: 55 ft

Relief: 10 ft [1]
Tides & Solunars
55 ft 29° 54' 0" N 85° 31' 60" W
Mexico Beach Site - #4 Split And Bundled Tires And Concrete 2 Loads Also 7/28/81
Date of Deployment: September 1 1981
Primary Material: TIRES
County: BAY
Depth: 54 ft
[1]
Tides & Solunars
54 ft 29° 54' 0" N 85° 32' 1" W
Mexico Beach Site - #5 Bundled Tires 6Th Of 11 Loads This Grant
Date of Deployment: July 28 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
29° 54' 25" N 85° 31' 47" W
Mexico Beach Site - Bluefish 4 4Th Of 11 Drops This Date Bluefish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 33" N 85° 31' 59" W
Mexico Beach Site - Bonita 7 4Th Of 11 Drops This Date Bonita Reef 10 Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 11" N 85° 31' 58" W
Mexico Beach Site - Flounder 6 4Th Of 11 Drops This Date Flounder 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 3" N 85° 31' 57" W
Mexico Beach Site - Hat #1 #17 H.Bridge3 Spans5/12/88Concrete Decks
Date of Deployment: May 12 1988
Primary Material: BRIDGE SLABS CONCRETE
Tonnage: 80
County: GULF [1]
Tides & Solunars
29° 53' 51" N 85° 31' 59" W
Mexico Beach Site - Kingfish 1 1St Of 11 Drops This Date Kingfish 3 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (3)
Tonnage: 6
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 3" N 85° 32' 37" W
Mexico Beach Site - Mako Shark 5 4Th Of 11 Drops This Date Mako Shark 5 Reef Ball
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 10
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 54' 52" N 85° 32' 33" W
Mexico Beach Site - Redfish 2 Nd Of 11 Drops This Date Redfish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 9" N 85° 31' 60" W
Mexico Beach Site - Snapper 11 4Th Of 11 Loads This Date Snapper Reef 10 Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 57 ft

Relief: 4 ft [1]
Tides & Solunars
57 ft 29° 53' 18" N 85° 31' 59" W
Mexico Beach Site - Spanish 3 Rd Of 11 Drops This Date Spanish 10 Reef Balls
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 40 ft

Relief: 4 ft [1]
Tides & Solunars
40 ft 29° 53' 25" N 85° 31' 59" W
Midway Site - 331 Bridge - #1 331 Bridge 7 Pieces 5/3/91 Concrete Decks
Date of Deployment: May 3 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 2' 23" N 85° 43' 14" W
Midway Site - 331 Bridge - #2 331 Bridge 8 Pieces 5/7/91 Concrete Decks
Date of Deployment: May 7 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 2' 23" N 85° 43' 14" W
Midway Site - 331 Bridge - #3 331 Bridge10 Pieces 5/28/91 Concrete Decks
Date of Deployment: May 28 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 2' 28" N 85° 43' 34" W
Midway Site - 331 Bridge - #4 331 Bridge10 Pieces 5/30/91 Concrete Decks
Date of Deployment: May 30 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 2' 28" N 85° 43' 34" W
Midway Original Site Concrete Culverts
Date of Deployment: July 10 1978
Primary Material: CONCRETE CULVERTS
County: BAY
Depth: 74 ft

Relief: 8 ft [1]
Tides & Solunars
74 ft 30° 2' 22" N 85° 43' 20" W
Midway Site Split And Bundled Tires 4 Of 9 Loads-Also-8/18/838/30 And 9/26/83
Date of Deployment: October 26 1983
Primary Material: TIRES
County: BAY
Depth: 72 ft
[1]
Tides & Solunars
72 ft 30° 2' 18" N 85° 43' 23" W
Midway Site - Tires Split And Bundled Tires 9 4Th Of 9 Loads Documented (3 Undocumented)
Date of Deployment: November 8 1983
Primary Material: TIRES
County: BAY
Depth: 71 ft
[1]
Tides & Solunars
71 ft 30° 2' 17" N 85° 43' 24" W
Midway Site - Tires Bundled Tires 8 4Th Of 9 Loads This Grant
Date of Deployment: November 8 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 41" N 85° 43' 12" W
Midway Site - Tires Bundled Tires 4 4Th Of 9 Loads This Grant
Date of Deployment: August 18 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site - Tires Bundled Tires 7Th Of 9 Loads This Grant
Date of Deployment: October 6 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site - Tires Bundled Tires 5Th Of 9 Loads This Grant
Date of Deployment: August 30 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site - Tires Bundled Tires 6Th Of 9 Loads This Grant
Date of Deployment: September 26 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site - Tires Bundled Tires 3Rd Of 11 Loads This Grant
Date of Deployment: June 27 1980
Primary Material: TIRES (1650)
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site - Tires 12 Bridge Spans 464 Tires 1Rst Of 16 Loads This Grant
Date of Deployment: June 17 1980
Primary Material: BRIDGE SPANS CONCRETE (12)
Tonnage: 127
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site #6 Concrete Rubble And Tires (19Yds) 12Th Of 16 Loads This Grant
Date of Deployment: August 26 1980
Primary Material: CONCRETE RUBBLE
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site #6 - Tires Bundled Tires 14Th Of 16 Loads This Grant
Date of Deployment: September 9 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site #6 - Tires Bundled Tires 13Th Of 16 Loads This Grant
Date of Deployment: September 2 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site #6 - Tires Bundled Tires 7Th Of 16 Loads This Grant
Date of Deployment: July 23 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site #6 -Tires Bundled Tires 16Th Last Loads Of 16 Loads This Grant
Date of Deployment: September 22 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site #6- Tires Bundled Tires 6Th Of 16 Loads This Grant
Date of Deployment: July 8 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 2' 42" N 85° 43' 10" W
Midway Site Boxcars Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: BAY
Depth: 72 ft

Relief: 10 ft [1]
Tides & Solunars
72 ft 30° 2' 23" N 85° 43' 21" W
Monica Lee Tugboat Steel Hull 49’ Long Tugboat, the "Monica Lee"
Primary Material: Vessel
Deploy Date: 2011/05/10
Depth: 117 ft

Relief: 20 ft [2]
Tides & Solunars
117 ft 30° 9' 20" N 86° 22' 13" W
Mooring Buoy Site - 331 331 Bridge 7 Pieces 4/23/91 Concrete Decks
Date of Deployment: April 23 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 4' 56" N 85° 43' 24" W
Navy Barge Navy Barge 45 Feet Deep
Date of Deployment:
Primary Material: BARGE STEEL
County: BAY
Depth: 45 ft
[1]
Tides & Solunars
45 ft 30° 4' 21" N 85° 42' 28" W
Navy Barge Steel Barge Donated By The Navy
Date of Deployment: June 5 1994
Primary Material: BARGE STEEL
County: BAY
Depth: 48 ft

Relief: 5 ft [1]
Tides & Solunars
48 ft 30° 4' 60" N 85° 43' 56" W
Okaloosa County Lap Site B 16 Fish Haven Modules
Primary Material: Module
Deploy Date: 2000/05/25
Depth: 244 ft

Relief: 6 ft [2]
Tides & Solunars
244 ft 29° 58' 23" N 86° 31' 11" W
Okaloosa County Lap Site C Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #4 of 5
Primary Material: Module
Deploy Date: 1999/05/10
Depth: 118 ft

Relief: 6 ft [2]
Tides & Solunars
118 ft 30° 8' 1" N 86° 36' 16" W
Okaloosa County Lap Site C Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #5 of 5
Primary Material: Module
Deploy Date: 1999/05/10
Depth: 118 ft

Relief: 6 ft [2]
Tides & Solunars
118 ft 30° 8' 2" N 86° 36' 16" W
Okaloosa County Lap Site C Center of 15 Fish Havens (5-FHT, 5-FH, 5-FHJR), Complex #1 of 5
Primary Material: Module
Deploy Date: 1999/05/10
Depth: 116 ft

Relief: 6 ft [2]
Tides & Solunars
116 ft 30° 8' 2" N 86° 36' 18" W
Okaloosa County Lap Site C Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #2 of 5
Primary Material: Module
Deploy Date: 1999/05/10
Depth: 118 ft

Relief: 6 ft [2]
Tides & Solunars
118 ft 30° 8' 3" N 86° 36' 18" W
Okaloosa County Lap Site C Center of 11 Fish Havens (5-FHT, 6-Fh, 0-FHJR), Complex #3 of 5
Primary Material: Module
Deploy Date: 1999/05/10
Depth: 118 ft

Relief: 6 ft [2]
Tides & Solunars
118 ft 30° 8' 3" N 86° 36' 18" W
Ozark Navy Mine Layer, Target Ship, AKA "USS Ozark" (MCS-2)
Primary Material: Vessel
Deploy Date: 1982/00/00
Depth: 325 ft

Relief: 125 ft [2]
Tides & Solunars
325 ft 29° 55' 6" N 86° 34' 56" W
PCMI Barge Site - PCMI Barge Steel Barge And Scrap Steel
Date of Deployment: December 31 1980
Primary Material: BARGE STEEL
County: BAY
Depth: 75 ft

Relief: 6 ft [1]
Tides & Solunars
75 ft 30° 6' 50" N 85° 49' 32" W
PCMI Barge Site - Tires Split Tires And Airplane 5 Loads Also 3/102/12 And 1/6/82 And 11/24/81
Date of Deployment: April 14 1982
Primary Material: TIRES
County: BAY
Depth: 71 ft
[1]
Tides & Solunars
71 ft 30° 6' 60" N 85° 49' 34" W
PCMI Barge Site - Tires 1 Bundled Tires 1Rst Of 11 Loads This Grant
Date of Deployment: July 7 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 7' 13" N 85° 49' 20" W
PCMI Barge Site - Tires 2 Bundled Tires 2Nd Of 11 Loads This Grant
Date of Deployment: July 9 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 7' 13" N 85° 49' 20" W
PCMI Barge Site - Tires 3 Bundled Tires 3Rd Of 11 Loads This Grant
Date of Deployment: July 14 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 7' 13" N 85° 49' 20" W
PCMI Barge Site - Tires 4 Bundled Tires 4Th Of 11 Loads This Grant
Date of Deployment: July 16 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 7' 13" N 85° 49' 20" W
PCMI Barge Site - Tires 5 Bundled Tires 5Th Of 11 Loads This Grant
Date of Deployment: July 23 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 7' 13" N 85° 49' 20" W
PCMI Barge Site - Tires 7 Bundled Tires 7Th Of 11 Loads This Grant
Date of Deployment: August 4 1981
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 7' 13" N 85° 49' 20" W
PCMI Barge Site - Tires 8 Split Bundled Tires 8 Loads Also 7/77/97/147/167/238/4 And 8/18/8
Date of Deployment: August 11 1981
Primary Material: TIRES
County: BAY
Depth: 71 ft

Relief: 7 ft [1]
Tides & Solunars
71 ft 30° 6' 49" N 85° 49' 32" W
PCMI Barge Site - Tires 9 Bundled Tires 9Th Of 11 Loads This Grant
Date of Deployment: August 18 1981
Primary Material: TIRES
County: BAY
Depth: 71 ft
[1]
Tides & Solunars
71 ft 30° 6' 47" N 85° 49' 34" W
Phinizy Reef 4 Of 5 Drops Of Reefballs This Date Mbara Funded
Date of Deployment: June 21 2002
Primary Material: MODULES CONCRETE REEFBALLS (10)
Tonnage: 20
County: BAY
Depth: 25 ft

Relief: 6 ft [1]
Tides & Solunars
25 ft 29° 54' 9" N 85° 28' 26" W
Raffield's Reef Fiberglass Boat Parts Tires Scrap Steel
Date of Deployment: December 31 1987
Primary Material: SHIP FIBERGLASS
County: BAY
Depth: 110 ft
[1]
Tides & Solunars
110 ft 29° 55' 1" N 85° 48' 46" W
Red Dove Reef Funded By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 53' 29" N 85° 32' 51" W
Reef Ex Center Site - #1 Reef-Ex Tank #6 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 37" N 85° 51' 56" W
Reef Ex Center Site - #2 Reef-Ex Tank #8 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 40" N 85° 51' 57" W
Reef Ex Center Site - #3 Reef-Ex Tank #7 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 38" N 85° 51' 56" W
Reef Ex Center Site - #4 Reef-Ex Tank #9 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 41" N 85° 51' 56" W
Reef Ex Center Site - #5 Reef-Ex Tank #10-Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 39" N 85° 51' 55" W
Reef Ex East Site - #1 Reef-Ex Tank #12-Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 14" N 85° 51' 4" W
Reef Ex East Site - #2 Reef-Ex Tank #13-Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 14" N 85° 51' 1" W
Reef Ex East Site - #3 Reef-Ex Tank #11-Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 59' 14" N 85° 51' 4" W
Reef Ex West Site - #1 Reef-Ex Tank #3 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 30° 0' 6" N 85° 52' 40" W
Reef Ex West Site - #2 Reef-Ex Tank #1 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 30° 0' 8" N 85° 52' 39" W
Reef Ex West Site - #3 Reef-Ex Tank #5 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 30° 0' 6" N 85° 52' 42" W
Reef Ex West Site - #4 Reef-Ex Tank #4 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 30° 0' 6" N 85° 52' 43" W
Reef Ex West Site - #5 Reef-Ex Tank #2 -Panama City
Date of Deployment: December 20 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 30° 0' 7" N 85° 52' 42" W
Sandy Reef - 1 Bridge Spans 1Rst Load Of 4
Date of Deployment: October 1 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 51" N 85° 41' 14" W
Sandy Reef - 2 Bridge Spans 2 Nd Load Of 4
Date of Deployment: October 8 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 52" N 85° 41' 19" W
Sandy Reef - 3 Bridge Spans 3 Rd Load Of 4
Date of Deployment: October 13 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 216
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 51" N 85° 41' 18" W
Sandy Reef - 4 Bridge Spans 4 4Th Load Of 4
Date of Deployment: October 30 1996
Primary Material: BRIDGE SPANS CONCRETE
Tonnage: 106
County: GULF
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 39' 50" N 85° 41' 16" W
Sandy Reef Phase II - 1 1Rst Of 4 Deployments This Date192 Reef Balls Total Patch #1
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEF BALLS(48)
County: GULF
Depth: 100 ft

Relief: 4 ft [1]
Tides & Solunars
100 ft 29° 40' 0" N 85° 41' 13" W
Sandy Reef Phase II - 2 2Nd Of 4 Deployments This Date Patch#2
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 58" N 85° 41' 9" W
Sandy Reef Phase II - 3 3Rd Of 4 Deployments This Date Patch#3
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 55" N 85° 41' 8" W
Sandy Reef Phase II - 4 4Th Of 4 Deployments This Date Patch#4
Date of Deployment: May 5 1998
Primary Material: MODULES CONCRETE REEFBALLS (48)
County: GULF
Depth: 100 ft

Relief: 2 ft [1]
Tides & Solunars
100 ft 29° 39' 48" N 85° 41' 10" W
Sherman X Tug Boat 80 Feet Long Steel Hulled Tug Boat
Date of Deployment: May 22 1996
Primary Material: SHIP STEEL TUG 80’
County: BAY
Depth: 80 ft

Relief: 20 ft [1]
Tides & Solunars
80 ft 29° 55' 4" N 85° 40' 28" W
Smith Barge Site - 331 Bridge 331 Bridge 8 Pieces 5/17/91 Concrete Decks
Date of Deployment: May 17 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 4' 50" N 85° 45' 36" W
Smurfit-Stone - #1 4 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 19 2002
Primary Material: STEEL CYLINDERS (4)
Tonnage: 80
County: BAY
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 29° 54' 44" N 85° 32' 31" W
Smurfit-Stone - #2 4 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 18 2002
Primary Material: STEEL CYLINDERS (4)
Tonnage: 80
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 14" N 85° 32' 26" W
Smurfit-Stone - #3 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 19 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 50" N 85° 32' 34" W
Smurfit-Stone - #4 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: September 18 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 29° 53' 50" N 85° 32' 1" W
Smurfit-Stone - #5 2 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: October 25 2002
Primary Material: STEEL CYLINDERS (2)
Tonnage: 40
County: BAY
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 29° 54' 9" N 85° 31' 39" W
Smurfit-Stone - #6 4 Steel Cylinders Each 24’ Long By 12’ Diameter
Date of Deployment: October 25 2002
Primary Material: STEEL CYLINDERS (4)
Tonnage: 80
County: BAY
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 29° 53' 26" N 85° 31' 44" W
Spanish Shanty Barge (Bay) 150 Feet Long Barge Inside The Bay
Date of Deployment:
Primary Material: BARGE STEEL
County: BAY
Depth: 20 ft
[1]
Tides & Solunars
20 ft 30° 6' 42" N 85° 42' 15" W
Stage 1 East -Boxcars Boxcars
Date of Deployment: December 31 1988
Primary Material: BOXCARS
County: BAY
Depth: 95 ft
[1]
Tides & Solunars
95 ft 29° 58' 1" N 85° 48' 55" W
Stage 1 East -Original Site Concrete Rubble
Date of Deployment: July 15 1978
Primary Material: CONCRETE RUBBLE
County: BAY
Depth: 100 ft
[1]
Tides & Solunars
100 ft 29° 58' 1" N 85° 48' 56" W
Stage I East- Hathaway #18 H.Bridge3 Spans5/13/88Concrete Decks
Date of Deployment: May 13 1988
Primary Material: BRIDGE SLABS CONCRETE
Tonnage: 80
County: BAY
Depth: 96 ft

Relief: 8 ft [1]
Tides & Solunars
96 ft 29° 56' 40" N 85° 49' 12" W
Stage I Site #5 Tires And Scrap Steel 11 4Th Of 16 Loads This Grant
Date of Deployment: August 19 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
29° 58' 27" N 85° 48' 42" W
Stage I Site #5- Concrete Rubble 4Th Of 16 Loads This Grant
Date of Deployment: July 1 1980
Primary Material: CONCRETE RUBBLE
County: BAY [1]
Tides & Solunars
29° 58' 27" N 85° 48' 42" W
Stage I Site #5- Tires Bundled Tires 10Th Of 16 Loads This Grant
Date of Deployment: August 13 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
29° 58' 27" N 85° 48' 42" W
Stage I Site #5- Tires Bundled Tires 9Th Of 16 Loads This Grant
Date of Deployment: August 1 1980
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
29° 58' 27" N 85° 48' 42" W
Starfish Reef - Patch #1 15 Walter Tetrahedrons, 1 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/06/08
Depth: 100 ft

Relief: 10 ft [2]
Tides & Solunars
100 ft 30° 8' 58" N 86° 37' 40" W
Starfish Reef - Patch #2 16 Walter Tetrahedrons, 2 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/06/08
Depth: 100 ft

Relief: 10 ft [2]
Tides & Solunars
100 ft 30° 8' 55" N 86° 37' 32" W
Starfish Reef - Patch #3 16 Walter Tetrahedrons, 3 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/06/08
Depth: 100 ft

Relief: 10 ft [2]
Tides & Solunars
100 ft 30° 8' 48" N 86° 37' 28" W
Starfish Reef - Patch #4 15 Walter Tetrahedrons, 4 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/06/08
Depth: 100 ft

Relief: 10 ft [2]
Tides & Solunars
100 ft 30° 8' 42" N 86° 37' 32" W
Starfish Reef - Patch #5 16 Walter Tetrahedrons, 1 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/04/20
Depth: 103 ft

Relief: 10 ft [2]
Tides & Solunars
103 ft 30° 8' 37" N 86° 37' 40" W
Starfish Reef - Patch #6 15 Walter Tetrahedrons, 2 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/04/20
Depth: 103 ft

Relief: 10 ft [2]
Tides & Solunars
103 ft 30° 8' 40" N 86° 37' 48" W
Starfish Reef - Patch #7 16 Walter Tetrahedrons, 3 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/04/20
Depth: 103 ft

Relief: 10 ft [2]
Tides & Solunars
103 ft 30° 8' 48" N 86° 37' 52" W
Starfish Reef - Patch #8 15 Walter Tetrahedrons, 4 of 4 Drops This Grant And Date
Primary Material: Module
Deploy Date: 2004/04/20
Depth: 103 ft

Relief: 10 ft [2]
Tides & Solunars
103 ft 30° 8' 55" N 86° 37' 48" W
Steel Dredge Boat Old Steel Dredge Boat Deployed By City Of Mexico Beach
Date of Deployment: April 17 2004
Primary Material: SHIP STEEL DREDGE BOAT 50’
County: BAY
Depth: 115 ft

Relief: 10 ft [1]
Tides & Solunars
115 ft 29° 46' 43" N 85° 50' 2" W
T Square Reef Bundles Of Tires
Date of Deployment: December 31 1987
Primary Material: TIRES
County: BAY
Depth: 132 ft
[1]
Tides & Solunars
132 ft 29° 37' 5" N 85° 55' 5" W
The Black Bart 180’ Oil Rig Supply Ship The Black Bart.
Date of Deployment: July 16 1993
Primary Material: SHIP STEEL 180’
County: BAY
Depth: 79 ft

Relief: 25 ft [1]
Tides & Solunars
79 ft 30° 3' 37" N 85° 49' 27" W
Triggerfish Reef Funded And Deployed By Mbara
Date of Deployment: October 28 1997
Primary Material: MODULES CONCRETE REEFBALLS
County: BAY
Depth: 40 ft

Relief: 3 ft [1]
Tides & Solunars
40 ft 29° 54' 1" N 85° 32' 38" W
Tully 100ft push tug
Primary Material: Vessel
Deploy Date: 0//0
Depth: 135 ft

Relief: 20 ft [2]
Tides & Solunars
135 ft 30° 7' 9" N 86° 26' 4" W
Unnamed Concrete Pipes And Junction Boxes 112 Pieces 1Rst Of 2 Loads This Gran
Date of Deployment: June 26 2001
Primary Material: CONCRETE PRECAST STRUCTURES (112)
Tonnage: 160.1
County: BAY
Depth: 52 ft

Relief: 8 ft [1]
Tides & Solunars
52 ft 29° 53' 42" N 85° 31' 17" W
Unnamed Concrete Pipes And Junction Boxes 112 Pieces 2Nd Of 2 Loads This Grant
Date of Deployment: June 28 2001
Primary Material: CONCRETE PRECAST STRUCTURES (117)
Tonnage: 190.1
County: BAY
Depth: 52 ft

Relief: 8 ft [1]
Tides & Solunars
52 ft 29° 53' 42" N 85° 31' 17" W
Unnamed 30-40 Pieces Culverts/Boxes/Risers
Date of Deployment: December 10 1999
Primary Material: CONCRETE PRECAST STRUCTURES
County: BAY
Depth: 20 ft

Relief: 5 ft [1]
Tides & Solunars
20 ft 29° 54' 28" N 85° 27' 50" W
Uss Strength 184 Feet Minesweeper Tender The Uss Strength
Date of Deployment: May 19 1987
Primary Material: SHIP STEEL 184’
County: BAY
Depth: 77 ft

Relief: 35 ft [1]
Tides & Solunars
77 ft 30° 1' 57" N 85° 42' 31" W
VALP #3 65’ Steel Hull (broken up), Concrete Culvert Pipe Sections
Primary Material: Culverts
Deploy Date: 1996/08/05
Depth: 109 ft

Relief: 6 ft [2]
Tides & Solunars
109 ft 30° 9' 48" N 86° 24' 44" W
Valparaiso #8 18" Dia. Culverts Nested Inside 30" Dia. Culverts, 94 Pairs All in one Location
Primary Material: Culverts
Deploy Date: 2002/05/08
Depth: 105 ft

Relief: 5 ft [2]
Tides & Solunars
105 ft 30° 8' 60" N 86° 33' 16" W
Virginia Reef - Site 1 Boat Hulls-Metal Crates-And Concrete Rubble.
Date of Deployment: August 2 1991
Primary Material: SHIP FIBERGLASS BOAT HULL
County: GULF
Depth: 65 ft
[1]
Tides & Solunars
65 ft 29° 50' 50" N 85° 31' 30" W
Virginia Reef - Site 2 Bridge Rubble-Concrete Boxes-And Steel Hoppers.
Date of Deployment: July 20 1993
Primary Material: BRIDGE RUBBLE
County: GULF
Depth: 66 ft

Relief: 15 ft [1]
Tides & Solunars
66 ft 29° 50' 33" N 85° 31' 31" W
Warsaw Site - 331 Bridge 331 Bridge 7 Pieces 4/29/91 Concrete Decks
Date of Deployment: April 29 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 3' 35" N 85° 49' 4" W
Warsaw - Tires Bundled Tire 1Rs Of 9 Loads This Grant
Date of Deployment: April 28 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 4' 36" N 85° 48' 46" W
Warsaw Reef Spilt And Bundled Tires 4 Of 9 Loads-Also-4/287/13& 8/3/1983
Date of Deployment: April 21 1983
Primary Material: TIRES
County: BAY
Depth: 75 ft

Relief: 3 ft [1]
Tides & Solunars
75 ft 30° 4' 11" N 85° 48' 59" W
Warsaw Site Concrete Rubble
Date of Deployment: December 31 1988
Primary Material: CONCRETE RUBBLE
County: BAY
Depth: 80 ft
[1]
Tides & Solunars
80 ft 30° 4' 0" N 85° 48' 7" W
Warsaw Site - Tires Bundled Tires 3Rd Of 9 Loads This Grant
Date of Deployment: August 3 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 4' 36" N 85° 48' 46" W
Warsaw Site - Tires Bundled Tires 2Nd Of 9 Loads This Grant
Date of Deployment: July 13 1983
Primary Material: TIRES
County: BAY [1]
Tides & Solunars
30° 4' 36" N 85° 48' 46" W
Wet And Wild Site - 331 331 Bridge 8 Pieces 5/24/91 Concrete Decks
Date of Deployment: May 24 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 5' 22" N 85° 44' 12" W
Wet And Wild Site - 331 331 Bridge10 Pieces 5/2/91 Concrete Decks
Date of Deployment: May 2 1991
Primary Material: BRIDGE SLABS CONCRETE
County: BAY [1]
Tides & Solunars
30° 5' 22" N 85° 44' 12" W
Williams Reef - 1A 6th of 10 Drops This Date, This Reef, Valparaiso-Williams 1A
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 109 ft

Relief: 6 ft [2]
Tides & Solunars
109 ft 30° 9' 53" N 86° 24' 6" W
Williams Reef - 1B 7th of 10 Drops This Date, This Reef, Valparaiso-Williams 1B
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 109 ft

Relief: 6 ft [2]
Tides & Solunars
109 ft 30° 10' 2" N 86° 24' 14" W
Williams Reef - 1C 8th of 10 Drops This Date, This Reef, Valparaiso-Williams 1C
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 109 ft

Relief: 6 ft [2]
Tides & Solunars
109 ft 30° 10' 12" N 86° 23' 58" W
Williams Reef - 1D 9th of 10 Drops This Date, This Reef, Valparaiso-Williams 1D
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 109 ft

Relief: 6 ft [2]
Tides & Solunars
109 ft 30° 10' 9" N 86° 23' 42" W
Williams Reef - 1E 10 4th of 10 Drops This Date, This Reef, Valparaiso-Williams 1E
Primary Material: Culverts
Deploy Date: 1998/05/20
Depth: 109 ft

Relief: 6 ft [2]
Tides & Solunars
109 ft 30° 9' 15" N 86° 23' 45" W