Bay County
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.Coordinate Display Format: DMS | DM | DD | ||||
---|---|---|---|---|
Waypoint Name | Description | Depth | Latitude | Longitude |
331 Bridge |
331 Bridge10 Pieces 5/31/91 Concrete Decks Date of Deployment: May 31 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 6' 12" N | 85° 48' 8" W | |
Accokeek |
143 Foot Long Navy Tugboat Date of Deployment: July 9 2000 Primary Material: SHIP STEEL NAVY TUGBOAT 143’ County: BAY Depth: 100 ft Relief: 37 ft [1] Tides & Solunars |
100 ft | 29° 58' 28" N | 85° 51' 55" W |
AJ's Carey Ricks Memorial |
75’ x 20’ x 20’ Steel Vessel with Chicken Transport Devices and Superstructure. Primary Material: Vessel Deploy Date: 2011/09/23 Depth: 113 ft Relief: 25 ft [2] Tides & Solunars |
113 ft | 30° 9' 28" N | 86° 24' 25" W |
Aquatic Life Ecosystem (Ale) Center |
4 Walter Tetrahedrons,9,10,11 & 12 of 40 Drops This Grant And Date, Lat/Lon For Unit #11 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 48" N | 86° 18' 40" W |
Aquatic Life Ecosystem (Ale) Center #2 |
4 Walter Tetrahedrons,37, 38, 39 & 40 of 40 Drops This Grant And Date, Lat/Lon For Unit #38 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 47" N | 86° 18' 37" W |
Aquatic Life Ecosystem (Ale) NE Leg #2 |
2 Walter Tetrahedrons, 33 & 34 of 40 Drops This Grant And Date, Lat/Lon For Unit #33 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 55" N | 86° 18' 24" W |
Aquatic Life Ecosystem (Ale) NE Leg #3 |
2 Walter Tetrahedrons, 31 & 32 of 40 Drops This Grant And Date, Lat/Lon For Unit #31 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 53" N | 86° 18' 29" W |
Aquatic Life Ecosystem (Ale) NE Leg #4 |
2 Walter Tetrahedrons, 29 & 30 of 40 Drops This Grant And Date, Lat/Lon For Unit #29 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 51" N | 86° 18' 35" W |
Aquatic Life Ecosystem (Ale) NE Leg End |
2 Walter Tetrahedrons, 35 & 36 of 40 Drops This Grant And Date, Lat/Lon For Unit #35 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 58" N | 86° 18' 19" W |
Aquatic Life Ecosystem (Ale) NW Leg #2 |
2 Walter Tetrahedrons, 3 & 4 of 40 Drops This Grant And Date, Lat/Lon For Unit #3 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 57" N | 86° 18' 54" W |
Aquatic Life Ecosystem (Ale) NW Leg #3 |
2 Walter Tetrahedrons, 5 & 6 of 40 Drops This Grant And Date, Lat/Lon For Unit #5 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 53" N | 86° 18' 49" W |
Aquatic Life Ecosystem (Ale) NW Leg #4 |
2 Walter Tetrahedrons, 7 & 8 of 40 Drops This Grant And Date, Lat/Lon For Unit #7 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 51" N | 86° 18' 44" W |
Aquatic Life Ecosystem (Ale) Nw Leg End |
2 Walter Tetrahedrons, 1 & 2 of 40 Drops This Grant And Date, Lat/Lon For Unit #1 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 59" N | 86° 18' 58" W |
Aquatic Life Ecosystem (Ale) SE Leg #2 |
2 Walter Tetrahedrons, 17 & 18 of 40 Drops This Grant And Date, Lat/Lon For Unit #17 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 38" N | 86° 18' 24" W |
Aquatic Life Ecosystem (Ale) SE Leg #3 |
2 Walter Tetrahedrons, 15 & 16 of 40 Drops This Grant And Date, Lat/Lon For Unit #15 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 42" N | 86° 18' 28" W |
Aquatic Life Ecosystem (Ale) SE Leg #4 |
2 Walter Tetrahedrons, 13 & 14 of 40 Drops This Grant And Date, Lat/Lon For Unit #13 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 45" N | 86° 18' 33" W |
Aquatic Life Ecosystem (Ale) SE Leg End |
4 Walter Tetrahedrons,19,20,21 & 22 of 40 Drops This Grant And Date, Lat/Lon For Unit #21 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 35" N | 86° 18' 56" W |
Aquatic Life Ecosystem (Ale) SW Leg #2 |
2 Walter Tetrahedrons, 23 & 24 of 40 Drops This Grant And Date, Lat/Lon For Unit #23 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 39" N | 86° 18' 51" W |
Aquatic Life Ecosystem (Ale) SW Leg #3 |
2 Walter Tetrahedrons, 25 & 26 of 40 Drops This Grant And Date, Lat/Lon For Unit #25 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 42" N | 86° 18' 47" W |
Aquatic Life Ecosystem (Ale) SW Leg #4 |
2 Walter Tetrahedrons, 27 & 28 of 40 Drops This Grant And Date, Lat/Lon For Unit #27 Primary Material: Module Deploy Date: 2012/08/07 Depth: 121 ft Relief: 8 ft [2] Tides & Solunars |
121 ft | 30° 6' 45" N | 86° 18' 43" W |
Arizona Chemical |
Steel Heat Exchanger 4’ Diameter By 60’ Feet Long Date of Deployment: May 30 2000 Primary Material: STEEL HEAT EXCHANGER County: BAY Depth: 66 ft Relief: 4 ft [1] Tides & Solunars |
66 ft | 29° 53' 21" N | 85° 32' 0" W |
B And B Reef |
Barge And Bridge Spans Hence The Name B And B Reef Date of Deployment: February 8 1990 Primary Material: BARGE STEEL County: BAY Depth: 43 ft Relief: 6 ft [1] Tides & Solunars |
43 ft | 30° 4' 56" N | 85° 42' 53" W |
Barnacle Reef - #1 |
2 Walter Tetrahedrons, 1 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 107 ft Relief: 10 ft [2] Tides & Solunars |
107 ft | 30° 9' 25" N | 86° 19' 12" W |
Barnacle Reef - #10 |
2 Walter Tetrahedrons, 10 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 111 ft Relief: 10 ft [2] Tides & Solunars |
111 ft | 30° 8' 32" N | 86° 19' 13" W |
Barnacle Reef - #11 |
2 Walter Tetrahedrons, 11 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 114 ft Relief: 10 ft [2] Tides & Solunars |
114 ft | 30° 8' 42" N | 86° 18' 55" W |
Barnacle Reef - #12 |
2 Walter Tetrahedrons, 12 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 118 ft Relief: 10 ft [2] Tides & Solunars |
118 ft | 30° 8' 31" N | 86° 18' 56" W |
Barnacle Reef - #13 |
2 Walter Tetrahedrons, 13 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 118 ft Relief: 10 ft [2] Tides & Solunars |
118 ft | 30° 8' 50" N | 86° 18' 39" W |
Barnacle Reef - #14 |
2 Walter Tetrahedrons, 14 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 115 ft Relief: 10 ft [2] Tides & Solunars |
115 ft | 30° 9' 6" N | 86° 18' 39" W |
Barnacle Reef - #15 |
2 Walter Tetrahedrons, 15 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 116 ft Relief: 10 ft [2] Tides & Solunars |
116 ft | 30° 8' 57" N | 86° 18' 19" W |
Barnacle Reef - #2 |
2 Walter Tetrahedrons, 2 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 108 ft Relief: 10 ft [2] Tides & Solunars |
108 ft | 30° 9' 17" N | 86° 19' 8" W |
Barnacle Reef - #3 |
2 Walter Tetrahedrons, 3 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 108 ft Relief: 10 ft [2] Tides & Solunars |
108 ft | 30° 9' 23" N | 86° 18' 55" W |
Barnacle Reef - #4 |
2 Walter Tetrahedrons, 4 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 111 ft Relief: 10 ft [2] Tides & Solunars |
111 ft | 30° 9' 24" N | 86° 18' 36" W |
Barnacle Reef - #5 |
2 Walter Tetrahedrons, 5 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 113 ft Relief: 10 ft [2] Tides & Solunars |
113 ft | 30° 9' 17" N | 86° 18' 41" W |
Barnacle Reef - #6 |
2 Walter Tetrahedrons, 6 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 109 ft Relief: 10 ft [2] Tides & Solunars |
109 ft | 30° 9' 14" N | 86° 18' 54" W |
Barnacle Reef - #7 |
2 Walter Tetrahedrons, 7 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 106 ft Relief: 10 ft [2] Tides & Solunars |
106 ft | 30° 9' 6" N | 86° 19' 12" W |
Barnacle Reef - #8 |
2 Walter Tetrahedrons, 8 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 109 ft Relief: 10 ft [2] Tides & Solunars |
109 ft | 30° 8' 58" N | 86° 19' 29" W |
Barnacle Reef - #9 |
2 Walter Tetrahedrons, 9 of 15 Drops This Grant And Date Primary Material: Module Deploy Date: 2006/04/03 Depth: 114 ft Relief: 10 ft [2] Tides & Solunars |
114 ft | 30° 8' 50" N | 86° 19' 11" W |
Barrier Dunes Barge |
200 Foot Barge Wreck Date of Deployment: December 31 1987 Primary Material: BARGE STEEL County: GULF Depth: 35 ft Relief: 10 ft [1] Tides & Solunars |
35 ft | 29° 45' 3" N | 85° 25' 33" W |
Baskins Barge |
80x40 Tower Construction Barge Primary Material: Vessel Deploy Date: 1996/10/29 Depth: 140 ft Relief: 30 ft [2] Tides & Solunars |
140 ft | 30° 5' 11" N | 86° 21' 20" W |
Baxter Memorial Reef |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Depth: 40 ft Relief: 3 ft [1] Tides & Solunars |
40 ft | 29° 54' 49" N | 85° 32' 33" W |
Baxter Memorial Reef #2 |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Relief: 3 ft [1] Tides & Solunars |
29° 54' 54" N | 85° 32' 31" W | |
Beach Barge Site - 331 Bridge |
331 Bridge10 Pieces 5/21/91 Concrete Decks Date of Deployment: May 21 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 9' 21" N | 85° 47' 57" W | |
Beanie And Hosehead Reef |
3 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 23 ft Relief: 6 ft [1] Tides & Solunars |
23 ft | 29° 53' 50" N | 85° 28' 9" W |
Bell Shoal |
2 Nd Of Two Drops Of Reefballs This Date Date of Deployment: June 14 2000 Primary Material: MODULES CONCRETE REEFBALLS (36) Tonnage: 108 County: BAY Depth: 21 ft Relief: 6 ft [1] Tides & Solunars |
21 ft | 29° 54' 29" N | 85° 28' 28" W |
Bell Shoal |
Culverts Junction Boxes And Manholes-Private Funding Date of Deployment: December 10 1999 Primary Material: CONCRETE CULVERTS (40) County: BAY Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 29° 55' 9" N | 85° 28' 49" W |
Bell Shoal |
1 1St Of Two Drops Of Reefballs This Date Date of Deployment: June 14 2000 Primary Material: MODULES CONCRETE REEFBALLS (37) Tonnage: 109 County: BAY Depth: 21 ft Relief: 6 ft [1] Tides & Solunars |
21 ft | 29° 55' 21" N | 85° 29' 6" W |
Billie And Jack Smith Reef |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Depth: 20 ft Relief: 3 ft [1] Tides & Solunars |
20 ft | 29° 54' 47" N | 85° 28' 41" W |
Bj Putnam Reef |
174’ Steel Ship B.J. Putnam. Date of Deployment: November 29 1993 Primary Material: SHIP STEEL 174’ County: BAY Depth: 106 ft Relief: 17 ft [1] Tides & Solunars |
106 ft | 29° 55' 49" N | 85° 50' 6" W |
Blackfin Reef |
Blackfin Reef 10 Reefballs Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 60 ft Relief: 3 ft [1] Tides & Solunars |
60 ft | 29° 53' 6" N | 85° 32' 6" W |
Bobby Guilford Site |
Concrete Rubble Deployed In Two Trips This Day Date of Deployment: August 9 2004 Primary Material: CONCRETE PILINGS Tonnage: 412 County: BAY Depth: 65 ft Relief: 8 ft [1] Tides & Solunars |
65 ft | 29° 53' 14" N | 85° 32' 37" W |
Brian Moeller Reef |
2 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 22 ft Relief: 6 ft [1] Tides & Solunars |
22 ft | 29° 53' 57" N | 85° 28' 16" W |
Buoy Barge |
Barge Date of Deployment: July 1 1994 Primary Material: BARGE STEEL County: BAY Depth: 60 ft Relief: 4 ft [1] Tides & Solunars |
60 ft | 30° 5' 0" N | 85° 43' 57" W |
C And C Barge |
100 Foot Long Barge Date of Deployment: July 15 1999 Primary Material: BARGE STEEL 100’ County: BAY Depth: 108 ft Relief: 7 ft [1] Tides & Solunars |
108 ft | 29° 58' 25" N | 85° 49' 36" W |
C Of C Reef |
Concrete Rubble And Prefabricated Concrete Date of Deployment: December 31 1964 Primary Material: CONCRETE RUBBLE County: GULF Depth: 40 ft [1] Tides & Solunars |
40 ft | 29° 49' 56" N | 85° 29' 54" W |
Captain Mike Neal's Reef 31 |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Depth: 40 ft Relief: 3 ft [1] Tides & Solunars |
40 ft | 29° 53' 57" N | 85° 30' 39" W |
Captain Mike Neal's Reef#2 |
Funded By The Mexico Beach Artificial Reef Association Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Relief: 3 ft [1] Tides & Solunars |
29° 53' 55" N | 85° 30' 42" W | |
Captain Toms Reef |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 20 ft [1] Tides & Solunars |
20 ft | 29° 54' 6" N | 85° 27' 34" W |
Car Body Site |
Culverts Junction Boxes And Manholes-Private Funding Date of Deployment: December 19 1999 Primary Material: CONCRETE CULVERTS (30) County: BAY Depth: 68 ft Relief: 6 ft [1] Tides & Solunars |
68 ft | 29° 53' 20" N | 85° 32' 58" W |
Car Body Site |
Ave. Center Of 21 Modules 21-Fish Havens (Fh) (Complex#2 Of 5) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(21) Tonnage: 23 County: BAY Depth: 65 ft Relief: 5 ft [1] Tides & Solunars |
65 ft | 29° 53' 26" N | 85° 32' 41" W |
Car Body Site |
Ave. Center Of 22 Modules 12-Fht 8 Fh And 2 Fhjr (Complex#1) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(22) Tonnage: 32 County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 53' 38" N | 85° 31' 36" W |
Car Body Site |
Ave. Center Of 16 Modules Fish Haven Towers(Complex#3 Of 5 ) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(16) Tonnage: 30 County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 53' 39" N | 85° 32' 23" W |
Car Body Site |
Culverts Junction Boxes And Manholes-Private Funding Date of Deployment: December 19 1999 Primary Material: CONCRETE CULVERTS County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 53' 47" N | 85° 32' 49" W |
Car Body Site |
98 Large Reefballs In Two Stacks On Each Site Of Barge Date of Deployment: June 14 2001 Primary Material: MODULES CONCRETE REEFBALLS (98) Tonnage: 183.6 County: BAY Depth: 54 ft Relief: 8 ft [1] Tides & Solunars |
54 ft | 29° 53' 53" N | 85° 31' 47" W |
Car Body Site |
Center Of 12 Modules Fish Haven Tower Units (Complex# 4 Of 5 ) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(12) Tonnage: 23 County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 54' 24" N | 85° 32' 10" W |
Car Body Site |
Center Of 8 Modules Fish Haven Tower Units (Complex# 5 Of 5 ) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(8) Tonnage: 15 County: BAY Depth: 65 ft Relief: 6 ft [1] Tides & Solunars |
65 ft | 29° 54' 49" N | 85° 32' 5" W |
Carbody |
105 Reefballs Two Drop Dates Also 7/8/03 Date of Deployment: June 26 2003 Primary Material: MODULES CONCRETE REEFBALLS (105) Tonnage: 364.84 County: BAY Depth: 60 ft Relief: 5 ft [1] Tides & Solunars |
60 ft | 29° 53' 38" N | 85° 32' 38" W |
Carbody |
95 Reefballs All In One Location Date of Deployment: June 12 2002 Primary Material: MODULES CONCRETE REEFBALLS (95) Tonnage: 183.6 County: BAY Depth: 60 ft Relief: 5 ft [1] Tides & Solunars |
60 ft | 29° 53' 47" N | 85° 32' 1" W |
Carbody |
38 Reefballs Two Drop Dates Also 4/22/04 Date of Deployment: June 8 2004 Primary Material: MODULES CONCRETE REEFBALLS (38) County: BAY Depth: 60 ft Relief: 6 ft [1] Tides & Solunars |
60 ft | 29° 53' 52" N | 85° 32' 34" W |
Carbody |
37 Goliath Reefballs 1 Of 2 Drop Dates Also 6/8/04 Date of Deployment: April 22 2004 Primary Material: MODULES CONCRETE REEFBALLS (37) County: BAY Depth: 60 ft Relief: 6 ft [1] Tides & Solunars |
60 ft | 29° 53' 53" N | 85° 32' 36" W |
Carbody-Mbara |
4 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (4) Tonnage: 4 County: BAY Depth: 60 ft Relief: 10 ft [1] Tides & Solunars |
60 ft | 29° 54' 8" N | 85° 32' 23" W |
Century/Cobia Barge |
105 X 25 X 8 Steel Barge Placed By Pcmi Date of Deployment: December 2 1999 Primary Material: BARGE STEEL 105’ County: BAY Depth: 98 ft Relief: 8 ft [1] Tides & Solunars |
98 ft | 29° 58' 25" N | 85° 49' 36" W |
Charles House Reef |
5 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 68 ft Relief: 6 ft [1] Tides & Solunars |
68 ft | 29° 53' 9" N | 85° 32' 36" W |
Chepanoc - Starfish Reef |
129 X 24 X28’ Tugboat, the "Chepanoc" Funded by County TDC Primary Material: Vessel Deploy Date: 2005/12/01 Depth: 107 ft Relief: 28 ft [2] Tides & Solunars |
107 ft | 30° 8' 49" N | 86° 37' 38" W |
Chickasaw |
107 Feet Long Naval Tugboat The Chickasaw Date of Deployment: December 31 1970 Primary Material: SHIP STEEL 107’ County: BAY Depth: 70 ft Relief: 6 ft [1] Tides & Solunars |
70 ft | 30° 4' 55" N | 85° 46' 46" W |
Chippewa |
204 Foot Tugboat The Chippewa Date of Deployment: February 8 1990 Primary Material: SHIP STEEL TUG 205’ County: BAY Depth: 102 ft Relief: 28 ft [1] Tides & Solunars |
102 ft | 29° 57' 41" N | 85° 48' 28" W |
Conch Reef NE - #1 |
2 Walter Tetrahedrons, 17 & 18 of 32 Drops This Grant And Date, Lat/Lon For Unit #18 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 24" N | 86° 22' 8" W |
Conch Reef NE - #2 |
2 Walter Tetrahedrons, 19 & 20 of 32 Drops This Grant And Date, Lat/Lon For Unit #19 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 27" N | 86° 22' 5" W |
Conch Reef NE - #3 |
2 Walter Tetrahedrons, 21 & 22 of 32 Drops This Grant And Date, Lat/Lon For Unit #21 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 30" N | 86° 22' 2" W |
Conch Reef NE - #4 |
2 Walter Tetrahedrons, 23 & 24 of 32 Drops This Grant And Date, Lat/Lon For Unit #23 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 33" N | 86° 21' 58" W |
Conch Reef NW - #1 |
2 Walter Tetrahedrons, 15 & 16 of 32 Drops This Grant And Date, Lat/Lon For Unit #16 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 24" N | 86° 22' 14" W |
Conch Reef NW - #2 |
2 Walter Tetrahedrons, 13 & 14 of 32 Drops This Grant And Date, Lat/Lon For Unit #14 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 27" N | 86° 22' 17" W |
Conch Reef NW - #3 |
2 Walter Tetrahedrons, 11 & 12 of 32 Drops This Grant And Date, Lat/Lon For Unit #12 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 30" N | 86° 22' 21" W |
Conch Reef NW - #4 |
2 Walter Tetrahedrons, 9 & 10 of 32 Drops This Grant And Date, Lat/Lon For Unit #9 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 33" N | 86° 22' 24" W |
Conch Reef SE - #1 |
2 Walter Tetrahedrons, 25 & 26 of 32 Drops This Grant And Date, Lat/Lon For Unit #25 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 19" N | 86° 22' 7" W |
Conch Reef SE - #2 |
2 Walter Tetrahedrons, 27 & 28 of 32 Drops This Grant And Date, Lat/Lon For Unit #27 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 16" N | 86° 22' 4" W |
Conch Reef SE - #3 |
2 Walter Tetrahedrons, 29 & 30 of 32 Drops This Grant And Date, Lat/Lon For Unit #29 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 13" N | 86° 22' 1" W |
Conch Reef SE - #4 |
2 Walter Tetrahedrons, 31 & 32 of 32 Drops This Grant And Date, Lat/Lon For Unit #31 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 10" N | 86° 21' 58" W |
Conch Reef SW - #1 |
2 Walter Tetrahedrons, 1 & 2 of 32 Drops This Grant And Date, Lat/Lon For Unit #2 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 19" N | 86° 22' 14" W |
Conch Reef SW - #2 |
2 Walter Tetrahedrons, 3 & 4 of 32 Drops This Grant And Date, Lat/Lon For Unit #3 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 16" N | 86° 22' 17" W |
Conch Reef SW - #3 |
2 Walter Tetrahedrons, 7 & 8 of 32 Drops This Grant And Date, Lat/Lon For Unit #7 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 13" N | 86° 22' 19" W |
Conch Reef SW - #4 |
2 Walter Tetrahedrons, 5 & 6 of 32 Drops This Grant And Date, Lat/Lon For Unit #5 Primary Material: Module Deploy Date: 2011/07/28 Depth: 117 ft Relief: 8 ft [2] Tides & Solunars |
117 ft | 30° 9' 10" N | 86° 22' 24" W |
Dan Barge |
100 Foot Long Barge Date of Deployment: July 1 2000 Primary Material: BARGE STEEL 100’ County: BAY Depth: 60 ft Relief: 5 ft [1] Tides & Solunars |
60 ft | 30° 4' 50" N | 85° 43' 51" W |
Davis Barge |
Davis Barge Date of Deployment: Primary Material: BARGE STEEL County: BAY Depth: 55 ft [1] Tides & Solunars |
55 ft | 30° 0' 27" N | 85° 36' 28" W |
DEP FLAP No Name Reef - #1 |
Twelve (12) Concrete Culverts, Paired 50ft apart Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 137 ft Relief: 3 ft [2] Tides & Solunars |
137 ft | 30° 5' 8" N | 86° 22' 5" W |
DEP FLAP No Name Reef - #2 |
6 4th Load of 6, Also (#4)370.0/015.0, (#5)780.1/010.1 Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft Relief: 6 ft [2] Tides & Solunars |
140 ft | 30° 3' 13" N | 86° 19' 26" W |
DEP FLAP No Name Reef - #3 |
Concrete Culverts 4th of 6 Loads This Date Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft [2] Tides & Solunars |
140 ft | 30° 3' 54" N | 86° 19' 35" W |
DEP FLAP No Name Reef - #4 |
Concrete Culverts 5th of 6 Loads This Date Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft [2] Tides & Solunars |
140 ft | 30° 3' 25" N | 86° 18' 14" W |
DEP FLAP No Name Reef - #5 |
Concrete Culverts 3rd of 6 Loads On This Date Primary Material: Culverts Deploy Date: 1996/05/21 Depth: 140 ft [2] Tides & Solunars |
140 ft | 30° 4' 31" N | 86° 20' 48" W |
DEP LAP Valp - #1 |
1 1st of 3 Loads, 39 Pallet Balls Primary Material: Module Deploy Date: 1995/03/24 Depth: 105 ft Relief: 5 ft [2] Tides & Solunars |
105 ft | 30° 8' 52" N | 86° 24' 47" W |
DEP LAP Valp - #2 |
2nd of 3 Loads, 42 Pallet Balls Primary Material: Module Deploy Date: 1995/05/22 Depth: 105 ft Relief: 5 ft [2] Tides & Solunars |
105 ft | 30° 8' 53" N | 86° 24' 49" W |
DEP LAP Valp - #3 |
3rd of 3 Loads of Pallet Reef Balls Primary Material: Module Deploy Date: 1995/06/20 Depth: 105 ft Relief: 4 ft [2] Tides & Solunars |
105 ft | 30° 9' 52" N | 86° 24' 47" W |
DEP LAP Valp - #4 |
Mixer Drums and Concrete Culverts Primary Material: Rubble Deploy Date: 1996/03/22 Depth: 105 ft Relief: 9 ft [2] Tides & Solunars |
105 ft | 30° 9' 49" N | 86° 24' 46" W |
Destin Reef "02" |
57 Modules, Various Sizes Primary Material: Module Deploy Date: 2002/06/07 Depth: 106 ft Relief: 6 ft [2] Tides & Solunars |
106 ft | 30° 8' 60" N | 86° 33' 20" W |
Don Ard Memorial Reef |
3 Walter Coqunia Florida Special Units Funded By Private Funds Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS COQUINA (3 Tonnage: 7.5 County: BAY Depth: 124 ft Relief: 10 ft [1] Tides & Solunars |
124 ft | 29° 45' 20" N | 85° 52' 22" W |
Eglin Landing Craft #2 |
74’ X 21’ Navy Landing Craft (LCM-1) From Eglin Air Force Base Primary Material: Vessel Deploy Date: 1991/09/00 Depth: 103 ft Relief: 20 ft [2] Tides & Solunars |
103 ft | 30° 9' 42" N | 86° 19' 38" W |
Elvira |
The Elvira About 200 Feet West Of The Pcmi Barge Date of Deployment: Primary Material: SHIP STEEL 70 County: BAY Depth: 70 ft [1] Tides & Solunars |
70 ft | 30° 6' 42" N | 85° 49' 48" W |
F-106 Airplanes |
3 - F106 Drone Airplanes Initiated By Hurlburt Afb Date of Deployment: September 25 1995 Primary Material: AIRPLANES F-106 (3) County: BAY Depth: 112 ft Relief: 8 ft [1] Tides & Solunars |
112 ft | 30° 0' 46" N | 85° 58' 7" W |
Fami Tug #1 |
First Of Two Steel Derelict Tugboats Removed By Fwc-And Fami Date of Deployment: July 10 2003 Primary Material: SHIP STEEL TUGBOAT HULL 85’ County: BAY Depth: 100 ft Relief: 20 ft [1] Tides & Solunars |
100 ft | 29° 58' 7" N | 85° 51' 16" W |
Fami Tug #2 |
Second Of Two Steel Derelict Tugboats Removed By Fwc And Fami Date of Deployment: July 11 2003 Primary Material: SHIP STEEL TUGBOAT 95’ County: BAY Depth: 100 ft Relief: 30 ft [1] Tides & Solunars |
100 ft | 29° 58' 7" N | 85° 51' 16" W |
Fish America Foundation Reef |
100 Reefballs Funded By ,30000 Fish America Grant Date of Deployment: February 12 2003 Primary Material: MODULES CONCRETE REEFBALLS (100) Tonnage: 200 County: BAY Depth: 67 ft Relief: 8 ft [1] Tides & Solunars |
67 ft | 29° 53' 38" N | 85° 32' 38" W |
Fontainbleau Site #7 |
Bundled Tires 15Th Of 16 Loads This Grant Date of Deployment: September 16 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 9' 52" N | 85° 53' 27" W | |
Fontainbleau Site #7 |
Scrap Steel 8Th Of 16 Loads This Grant Date of Deployment: July 29 1980 Primary Material: STEEL SCRAP County: BAY [1] Tides & Solunars |
30° 9' 52" N | 85° 53' 27" W | |
Fountainbleau Boxcars |
Boxcars Date of Deployment: December 31 1988 Primary Material: BOXCARS County: BAY Depth: 75 ft [1] Tides & Solunars |
75 ft | 30° 9' 0" N | 85° 52' 60" W |
Fountainbleau Site #7 |
Concrete Rubble 5Th Of 16 Loads This Grant Date of Deployment: July 3 1980 Primary Material: CONCRETE RUBBLE County: BAY [1] Tides & Solunars |
30° 9' 52" N | 85° 53' 27" W | |
Fountainbleau Site #7 |
8 Bridge Spans 2Nd Of 16 Loads This Grant Date of Deployment: June 19 1980 Primary Material: BRIDGE SPANS CONCRETE (8) Tonnage: 121 County: BAY [1] Tides & Solunars |
30° 9' 52" N | 85° 53' 27" W | |
G . Merrill Clift Memorial Reef |
1 Walter Coqunia Florida Special Units Funded By Private Funds Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS COQUINA (1 Tonnage: 2.5 County: BAY Depth: 128 ft Relief: 10 ft [1] Tides & Solunars |
128 ft | 29° 44' 27" N | 85° 52' 23" W |
Gateway Barge |
70 Foot Barge Steel Tanks Tires And Boxcars Date of Deployment: December 31 1988 Primary Material: BARGE STEEL 70’ County: GULF Depth: 80 ft Relief: 8 ft [1] Tides & Solunars |
80 ft | 29° 50' 14" N | 85° 34' 52" W |
Grey Ghost - Archer |
Bundled Tires Date of Deployment: December 31 1987 Primary Material: TIRES County: BAY Depth: 105 ft [1] Tides & Solunars |
105 ft | 30° 2' 49" N | 86° 5' 32" W |
Grey Ghost - Blount |
Fiberglass Boats Tires Scrap Steel Date of Deployment: December 31 1987 Primary Material: SHIP FIBERGLASS County: BAY Depth: 105 ft [1] Tides & Solunars |
105 ft | 30° 2' 30" N | 86° 5' 42" W |
Grey Ghost - Ship |
105 Foot Navy Tugboat The Grey Ghost Date of Deployment: July 12 1978 Primary Material: SHIP STEEL 105’ County: BAY Depth: 105 ft [1] Tides & Solunars |
105 ft | 30° 2' 49" N | 86° 5' 32" W |
Hammerhead Reef |
Hammerhead Reefs 10 Reefballs Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 45 ft Relief: 3 ft [1] Tides & Solunars |
45 ft | 29° 53' 19" N | 85° 31' 27" W |
Hathaway Span #10 -Stage 1 West |
#10 H. Bridge 5/7/88 Steel Truss Spans Date of Deployment: May 7 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 114 ft Relief: 36 ft [1] Tides & Solunars |
114 ft | 30° 1' 28" N | 85° 57' 45" W |
Hathaway Span #7 -Stage 1 West |
#7 H. Bridge 5/6/88 Steel Truss Date of Deployment: May 6 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 111 ft Relief: 36 ft [1] Tides & Solunars |
111 ft | 29° 59' 8" N | 85° 57' 1" W |
Hathaway Span #8 -Stage 1 West |
#8 H. Bridge 5/6/88 Steel Truss Spans Date of Deployment: May 6 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 113 ft Relief: 36 ft [1] Tides & Solunars |
113 ft | 29° 59' 53" N | 85° 56' 54" W |
Hathaway Span #9 -Stage 1 West |
#9 H. Bridge 5/7/88 Steel Truss Spans Date of Deployment: May 7 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 113 ft Relief: 36 ft [1] Tides & Solunars |
113 ft | 30° 0' 32" N | 85° 56' 59" W |
Hathaway Bridge 1 Finish |
Large Concrete Beams 66 Ft Long End Of May 6 Drop 1 Of 2 Drops Date of Deployment: May 6 2004 Primary Material: BRIDGE CONCRETE BEAMS Tonnage: 4187 County: BAY [1] Tides & Solunars |
30° 3' 12" N | 85° 58' 24" W | |
Hathaway Bridge 1 Start |
Large Concrete Beams 66 Ft Long Start Of May 6 Drop 1 Of 2 Drops Date of Deployment: May 6 2004 Primary Material: BRIDGE CONCRETE BEAMS Tonnage: 4187 County: BAY [1] Tides & Solunars |
30° 4' 36" N | 85° 58' 12" W | |
Hathaway Bridge 2 Finish |
Large Concrete Beams 66 Ft Long End Of May 14 Drop 2 Of 2 Drops Date of Deployment: May 14 2004 Primary Material: BRIDGE CONCRETE BEAMS Tonnage: 4187 County: BAY [1] Tides & Solunars |
29° 58' 18" N | 85° 51' 30" W | |
Hathaway Bridge 2 Start |
Large Concrete Beams 66 Ft Long Start Of May 14 Drop 2 Of 2 Drops Date of Deployment: May 14 2004 Primary Material: BRIDGE CONCRETE BEAMS Tonnage: 4187 County: BAY [1] Tides & Solunars |
29° 59' 6" N | 85° 51' 12" W | |
Hathaway Rubble-#16 |
#16 H.Bridge3 Spans5/11/88Concrete Decks Date of Deployment: May 11 1988 Primary Material: BRIDGE SLABS CONCRETE Tonnage: 80 County: BAY Depth: 75 ft Relief: 8 ft [1] Tides & Solunars |
75 ft | 30° 4' 7" N | 85° 49' 27" W |
Hathaway Span #1 - Midway Site |
#1 H. Bridge 4/29/88Steel Truss Spans Date of Deployment: April 29 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 72 ft Relief: 37 ft [1] Tides & Solunars |
72 ft | 30° 2' 40" N | 85° 43' 44" W |
Hathaway Span #12 -Midway Site |
#12 H. Bridge 5/9/88 Steel Truss Spans Date of Deployment: May 9 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 72 ft Relief: 27 ft [1] Tides & Solunars |
72 ft | 30° 2' 5" N | 85° 43' 54" W |
Hathaway Span #13 -Stage 1 East |
#13 H. Bridge 5/9/88 Steel Truss Spans Date of Deployment: May 9 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 100 ft Relief: 36 ft [1] Tides & Solunars |
100 ft | 29° 57' 24" N | 85° 50' 31" W |
Hathaway Span #14 Warsaw Site |
#14 H. Bridge 5/10/88 Steel Truss Spans Date of Deployment: May 10 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 75 ft Relief: 20 ft [1] Tides & Solunars |
75 ft | 30° 4' 17" N | 85° 48' 53" W |
Hathaway Span #2 -Midway Site |
#2 H. Bridge 4/30/88 Steel Truss Spans Date of Deployment: April 30 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 70 ft Relief: 15 ft [1] Tides & Solunars |
70 ft | 30° 2' 13" N | 85° 43' 40" W |
Hathaway Span #3 - Stage 1 East |
#3 H. Bridge 5/2/88 Steel Truss Spans Lor Date of Deployment: May 2 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 105 ft [1] Tides & Solunars |
105 ft | 29° 56' 35" N | 85° 49' 18" W |
Hathaway Span #3A - Stage 1 East |
#3A H. Bridge 5/2/88 Steel Truss Spans Date of Deployment: May 2 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 100 ft Relief: 36 ft [1] Tides & Solunars |
100 ft | 29° 56' 41" N | 85° 49' 7" W |
Hathaway Span #4 - Stage 1 East |
#4 H. Bridge 5/3/88 Steel Truss Spans Date of Deployment: May 3 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 101 ft Relief: 36 ft [1] Tides & Solunars |
101 ft | 29° 56' 41" N | 85° 49' 47" W |
Hathaway Span #5 -Fontainbleau |
#5 H. Bridge 5/4/88 Steel Truss Spans Date of Deployment: May 4 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 73 ft Relief: 36 ft [1] Tides & Solunars |
73 ft | 30° 9' 51" N | 85° 53' 49" W |
Hathaway Span #6 -Fontainbleau |
#6 H. Bridge 5/4/88 Steel Truss Spans Date of Deployment: May 4 1988 Primary Material: BRIDGE SPANS STEEL Tonnage: 360 County: BAY Depth: 73 ft Relief: 36 ft [1] Tides & Solunars |
73 ft | 30° 8' 55" N | 85° 53' 16" W |
Hathaway-Rubble #15 |
#15 H.Bridge3 Spans5/11/88Concrete Decks Date of Deployment: May 11 1988 Primary Material: BRIDGE SLABS Tonnage: 80 County: BAY Depth: 71 ft Relief: 8 ft [1] Tides & Solunars |
71 ft | 30° 9' 52" N | 85° 53' 8" W |
Highway 79 Bridge |
400 Cubic Yards Of Concrete Bridge Spans. Date of Deployment: May 13 1993 Primary Material: BRIDGE RUBBLE County: BAY Depth: 74 ft [1] Tides & Solunars |
74 ft | 30° 3' 34" N | 85° 49' 23" W |
Highway 79 Bridge |
400 Cubic Yards Of Concrete Bridge Spans. Date of Deployment: May 10 1993 Primary Material: BRIDGE RUBBLE County: BAY Depth: 74 ft [1] Tides & Solunars |
74 ft | 30° 3' 43" N | 85° 49' 18" W |
Hovercraft-Llcat |
100 Feet Long Navy Hovercraft 8/18/95 Date of Deployment: August 18 1995 Primary Material: SHIP STEEL 100’ HOVERCRAFT County: BAY Depth: 74 ft Relief: 10 ft [1] Tides & Solunars |
74 ft | 30° 4' 15" N | 85° 48' 43" W |
Inshore Mexico Bch - Amberjack |
9 4Th Of 11 Drops This Date Amberjack 5 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (5) Tonnage: 10 County: BAY Depth: 25 ft Relief: 4 ft [1] Tides & Solunars |
25 ft | 29° 54' 25" N | 85° 24' 18" W |
Inshore Mexico Bch - Cobia |
9 4Th Of 11 Drops This Date Cobia 5 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (5) Tonnage: 10 County: BAY Depth: 25 ft Relief: 4 ft [1] Tides & Solunars |
25 ft | 29° 54' 23" N | 85° 24' 19" W |
Inshore Mexico Bch - Grouper |
10 4Th Of 11 Drops This Date Grouper 5 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (5) Tonnage: 10 County: BAY Depth: 25 ft Relief: 4 ft [1] Tides & Solunars |
25 ft | 29° 54' 24" N | 85° 24' 15" W |
Inshore Site #1 |
Ave. Center Of 8 Modules 8-Fish Haven Units (Fh) (Complex#4) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(8) Tonnage: 8 County: BAY Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 29° 54' 52" N | 85° 24' 19" W |
Inshore Site #1 |
Ave. Center Of 12 Modules 12-Fish Haven Units (Fh) (Complex#3) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(12) Tonnage: 12 County: BAY Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 29° 54' 57" N | 85° 24' 22" W |
Inshore Site #1 |
Ave. Center Of 21 Modules 21-Fish Haven Units (Fh) (Complex#2) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(21) Tonnage: 21 County: BAY Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 29° 55' 2" N | 85° 24' 26" W |
Inshore Site #1 |
Ave. Center Of 22 Modules 12-Fht 8 Fh And 2 Fhjr (Complex#1) Date of Deployment: June 3 1999 Primary Material: MODULES CONCRETE FISH HAVENS(22) Tonnage: 30 County: BAY Depth: 25 ft Relief: 6 ft [1] Tides & Solunars |
25 ft | 29° 55' 7" N | 85° 24' 30" W |
Japan Frp Tube Reef |
21’ X 18’ Fiberglass Module 1 Of 4 Loads Date of Deployment: August 28 1981 Primary Material: MODULES FIBERGLASS County: BAY Depth: 75 ft Relief: 12 ft [1] Tides & Solunars |
75 ft | 30° 2' 20" N | 85° 47' 24" W |
Japan Frp Tube Reef |
21’ X 18’ Fiberglass Module 1 Of 4 Loads Date of Deployment: August 28 1981 Primary Material: MODULES FIBERGLASS County: BAY Depth: 74 ft Relief: 15 ft [1] Tides & Solunars |
74 ft | 30° 2' 23" N | 85° 47' 23" W |
Japan Reference Reef1 |
Concrete Culverts Reference Reefs Near Japan Reefs 3 Of 4 Loads Date of Deployment: September 22 1981 Primary Material: CONCRETE CULVERTS County: BAY Depth: 75 ft Relief: 3 ft [1] Tides & Solunars |
75 ft | 30° 2' 1" N | 85° 47' 31" W |
Japan Reference Reef2 |
Concrete Culverts Reference Reefs Near Japan Reefs 4 Of 4 Loads Date of Deployment: September 29 1981 Primary Material: CONCRETE CULVERTS County: BAY Depth: 75 ft Relief: 3 ft [1] Tides & Solunars |
75 ft | 30° 2' 1" N | 85° 47' 31" W |
Jaycee Reef |
Concrete Rubble Car Bodies And Steel Containers Date of Deployment: December 31 1987 Primary Material: CONCRETE RUBBLE County: GULF Depth: 45 ft Relief: 10 ft [1] Tides & Solunars |
45 ft | 29° 50' 18" N | 85° 29' 32" W |
Jaycee Reef |
Concrete Rubble And Steel Containers. Date of Deployment: March 1 1990 Primary Material: CONCRETE CULVERTS County: GULF [1] Tides & Solunars |
29° 50' 25" N | 85° 29' 25" W | |
LA-1L (S36) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 143 ft Relief: 15 ft [2] Tides & Solunars |
143 ft | 30° 5' 34" N | 86° 24' 10" W |
LA-2L (S37) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 146 ft Relief: 15 ft [2] Tides & Solunars |
146 ft | 30° 5' 4" N | 86° 24' 45" W |
LA-3L (S38) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 153 ft Relief: 15 ft [2] Tides & Solunars |
153 ft | 30° 5' 4" N | 86° 24' 10" W |
LA-4L (S39) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 146 ft Relief: 15 ft [2] Tides & Solunars |
146 ft | 30° 5' 4" N | 86° 23' 36" W |
LA-5L (S40) Center |
7 Walter Tetrahedrons (FLARs) and 1 Large Walter Tetrahedron Primary Material: Module Deploy Date: 2020/05/27 Depth: 147 ft Relief: 15 ft [2] Tides & Solunars |
147 ft | 30° 4' 34" N | 86° 24' 10" W |
LAARS Site A - M-60 Tank #10 (E5) |
M-60 Tank E5 - Tank laying on side Primary Material: Tank Deploy Date: 1994/12/19 Depth: 107 ft Relief: 12 ft [2] Tides & Solunars |
107 ft | 30° 9' 4" N | 86° 24' 8" W |
LAARS Site A - M-60 Tank #11 (E1) |
M-60 Tank E1 - Tank laying on side Primary Material: Tank Deploy Date: 1994/12/19 Depth: 110 ft Relief: 12 ft [2] Tides & Solunars |
110 ft | 30° 9' 2" N | 86° 24' 3" W |
LAARS Site A - M-60 Tank #12 |
LAARS Site A-Tank #12-Deep Primary Material: Tank Deploy Date: 1994/12/19 Depth: 113 ft Relief: 12 ft [2] Tides & Solunars |
113 ft | 30° 8' 42" N | 86° 23' 8" W |
LAARS Site A - M-60 Tank #13 |
M-60 Tank - Tank Upright Primary Material: Tank Deploy Date: 1994/12/19 Depth: 121 ft Relief: 12 ft [2] Tides & Solunars |
121 ft | 30° 8' 26" N | 86° 22' 23" W |
LAARS Site A - M-60 Tank #14 |
M-60 Tank - Tank Upside Down Primary Material: Tank Deploy Date: 1994/12/19 Depth: 105 ft Relief: 12 ft [2] Tides & Solunars |
105 ft | 30° 8' 32" N | 86° 21' 31" W |
Liberty Ship-Uss Grierson |
Liberty Ship The Benjamin H. Grierson Date of Deployment: July 31 1977 Primary Material: SHIP STEEL 441’ County: BAY Depth: 72 ft Relief: 20 ft [1] Tides & Solunars |
72 ft | 29° 59' 4" N | 85° 42' 44" W |
Life Boats (Bay) |
7 Lifeboats Tied Together Date of Deployment: Primary Material: SHIP STEEL (7) County: BAY Depth: 25 ft [1] Tides & Solunars |
25 ft | 30° 6' 57" N | 85° 42' 21" W |
Lindberg Circle Reef - 1A |
1st of 10 Drops This Day, 5 Drops This Reef Destin -Lindberg 1A Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [2] Tides & Solunars |
107 ft | 30° 9' 54" N | 86° 17' 5" W |
Lindberg Circle Reef - 1B |
2nd of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1B Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [2] Tides & Solunars |
107 ft | 30° 10' 5" N | 86° 16' 59" W |
Lindberg Circle Reef - 1C |
3rd of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1C Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [2] Tides & Solunars |
107 ft | 30° 10' 4" N | 86° 16' 49" W |
Lindberg Circle Reef - 1D |
4th of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1D Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [2] Tides & Solunars |
107 ft | 30° 9' 55" N | 86° 16' 40" W |
Lindberg Circle Reef - 1E |
5th of 10 Drops This Day, 5 Drops This Reef Destin- Lindberg 1E Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 107 ft Relief: 6 ft [2] Tides & Solunars |
107 ft | 30° 9' 58" N | 86° 16' 56" W |
Loss Pontoon |
Concrete And Metal 3 Loads Also 10/8/81 And 8/13/81 Date of Deployment: April 21 1982 Primary Material: CONCRETE CULVERTS County: BAY Depth: 66 ft Relief: 5 ft [1] Tides & Solunars |
66 ft | 30° 0' 53" N | 85° 41' 29" W |
Loss Pontoon Site - Hath |
#19 H.Bridge4 Spans5/14/88Concrete Decks Date of Deployment: May 14 1988 Primary Material: BRIDGE SLABS CONCRETE Tonnage: 80 County: BAY Depth: 45 ft [1] Tides & Solunars |
45 ft | 30° 5' 8" N | 85° 43' 24" W |
Loss Pontoon #3- |
Scrap Metal And Concrete 8Th Of 11 Loads This Grant Date of Deployment: August 13 1981 Primary Material: METAL SCRAP County: BAY [1] Tides & Solunars |
30° 5' 20" N | 85° 43' 55" W | |
Loss Pontoon Site |
Scrap Steel Tank Tires And Concrete Rubble Date of Deployment: July 1 1978 Primary Material: STEEL SCRAP TANK County: BAY Depth: 65 ft Relief: 25 ft [1] Tides & Solunars |
65 ft | 30° 4' 58" N | 85° 44' 7" W |
Lst Port St. Joe |
75 Foot Long Steel Lst Date of Deployment: December 31 1993 Primary Material: SHIP STEEL LAST 75’ County: GULF Depth: 90 ft Relief: 10 ft [1] Tides & Solunars |
90 ft | 29° 40' 25" N | 85° 30' 38" W |
M/V Angelina B. |
M/V "Angelina B", In Okaloosa Large Area "C" Primary Material: Vessel Deploy Date: 1999/06/23 Depth: 135 ft Relief: 35 ft [2] Tides & Solunars |
135 ft | 30° 7' 23" N | 86° 36' 42" W |
M/V Deborah |
135’ Tugboat The M/V Deborah, Okaloosa Flap "C" Site Primary Material: Vessel Deploy Date: 1999/06/23 Depth: 135 ft Relief: 40 ft [2] Tides & Solunars |
135 ft | 30° 7' 30" N | 86° 35' 24" W |
M/V Prewitt |
80’ Long Tugboat The M/V Prewitt, DEP Flap Site Primary Material: Vessel Deploy Date: 1998/06/10 Depth: 137 ft Relief: 30 ft [2] Tides & Solunars |
137 ft | 30° 3' 42" N | 86° 18' 28" W |
Mb-82 |
1 Walter Coqunia Florida Special Units Funded By Mbara Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS COQUINA (1 Tonnage: 2.5 County: BAY Depth: 124 ft Relief: 10 ft [1] Tides & Solunars |
124 ft | 29° 46' 11" N | 85° 51' 12" W |
Mb-84 |
3 Walter Coqunia Florida Special Units Funded By Mbara Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS COQUINA (3 Tonnage: 7.5 County: BAY Depth: 124 ft Relief: 10 ft [1] Tides & Solunars |
124 ft | 29° 45' 20" N | 85° 53' 43" W |
Mb-88-A1 |
5 Walter Florida Special Modules 1 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 29" N | 85° 52' 2" W |
Mb-88-B1 |
5 Walter Florida Special Modules 2 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 31" N | 85° 51' 59" W |
Mb-88-C1 |
5 Walter Florida Special Modules 3 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 29" N | 85° 52' 0" W |
Mb-88-D1 |
5 Walter Florida Special Modules 4 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 29" N | 85° 51' 60" W |
Mb-88-E1 |
5 Walter Florida Special Modules 5 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 28" N | 85° 51' 59" W |
Mb-88-F1 |
5 Walter Florida Special Modules 6 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 29" N | 85° 51' 59" W |
Mb-88-G1 |
5 Walter Florida Special Modules 7 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 29" N | 85° 51' 59" W |
Mb-88-H1 |
5 Walter Florida Special Modules 8 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 29" N | 85° 51' 59" W |
Mb-88-I1 |
5 Walter Florida Special Modules 9 Of 9 Drops This Grant Date of Deployment: April 25 2006 Primary Material: MODULES CONCRETE WALTERS FL (5) Tonnage: 10 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 47' 28" N | 85° 51' 58" W |
Mbara |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: STEEL COUNTERS (14) County: BAY Depth: 20 ft [1] Tides & Solunars |
20 ft | 29° 56' 21" N | 85° 29' 49" W |
Mbara Barge |
Steel Hopper Barge 195’X30’x12’ With Steel Pipes Mbara Funded ,25000 Date of Deployment: June 19 2001 Primary Material: BARGE STEEL 195’ County: BAY Depth: 71 ft Relief: 12 ft [1] Tides & Solunars |
71 ft | 29° 53' 9" N | 85° 32' 48" W |
Mbara Barge Addition |
1 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 68 ft Relief: 6 ft [1] Tides & Solunars |
68 ft | 29° 53' 9" N | 85° 32' 48" W |
Mbara-Laars-1 |
4 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (4) Tonnage: 8 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 46' 60" N | 85° 50' 0" W |
Mbara-Laars-2 |
2 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (2) Tonnage: 4 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 46' 59" N | 85° 51' 11" W |
Mbara-Laars-3 |
4 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (4) Tonnage: 8 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 46' 59" N | 85° 52' 25" W |
Mbara-Laars-4 |
1 Walter Florida Special Module Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (1) Tonnage: 2 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 46' 12" N | 85° 51' 12" W |
Mbara-Laars-5 |
3 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (3) Tonnage: 3 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 45' 20" N | 85° 51' 12" W |
Mbara-Laars-6 |
3 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (3) Tonnage: 3 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 45' 21" N | 85° 53' 44" W |
Mbara-Laars-7 |
2 Walter Florida Special Modules Funded By Mbara Date of Deployment: January 11 2005 Primary Material: MODULES CONCRETE WALTERS FL (2) Tonnage: 2 County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 44' 26" N | 85° 53' 46" W |
Mc Comick Barge |
Barge Date of Deployment: August 1 1994 Primary Material: BARGE STEEL County: BAY Depth: 60 ft Relief: 5 ft [1] Tides & Solunars |
60 ft | 30° 4' 27" N | 85° 42' 22" W |
Mexico Beach Site - #1 |
Scrap Steel And Tires Date of Deployment: December 31 1979 Primary Material: STEEL SCRAP County: GULF Depth: 54 ft [1] Tides & Solunars |
54 ft | 29° 54' 4" N | 85° 31' 60" W |
Mexico Beach Site - #2 |
Boxcars Date of Deployment: December 31 1988 Primary Material: BOXCARS County: GULF Depth: 55 ft Relief: 10 ft [1] Tides & Solunars |
55 ft | 29° 54' 4" N | 85° 31' 60" W |
Mexico Beach Site - #3 |
Boxcars Date of Deployment: December 31 1988 Primary Material: BOXCARS County: GULF Depth: 55 ft Relief: 10 ft [1] Tides & Solunars |
55 ft | 29° 54' 0" N | 85° 31' 60" W |
Mexico Beach Site - #4 |
Split And Bundled Tires And Concrete 2 Loads Also 7/28/81 Date of Deployment: September 1 1981 Primary Material: TIRES County: BAY Depth: 54 ft [1] Tides & Solunars |
54 ft | 29° 54' 0" N | 85° 32' 1" W |
Mexico Beach Site - #5 |
Bundled Tires 6Th Of 11 Loads This Grant Date of Deployment: July 28 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
29° 54' 25" N | 85° 31' 47" W | |
Mexico Beach Site - Bluefish |
4 4Th Of 11 Drops This Date Bluefish 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 57 ft Relief: 4 ft [1] Tides & Solunars |
57 ft | 29° 53' 33" N | 85° 31' 59" W |
Mexico Beach Site - Bonita |
7 4Th Of 11 Drops This Date Bonita Reef 10 Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 54' 11" N | 85° 31' 58" W |
Mexico Beach Site - Flounder |
6 4Th Of 11 Drops This Date Flounder 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 54' 3" N | 85° 31' 57" W |
Mexico Beach Site - Hat #1 |
#17 H.Bridge3 Spans5/12/88Concrete Decks Date of Deployment: May 12 1988 Primary Material: BRIDGE SLABS CONCRETE Tonnage: 80 County: GULF [1] Tides & Solunars |
29° 53' 51" N | 85° 31' 59" W | |
Mexico Beach Site - Kingfish |
1 1St Of 11 Drops This Date Kingfish 3 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (3) Tonnage: 6 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 54' 3" N | 85° 32' 37" W |
Mexico Beach Site - Mako Shark |
5 4Th Of 11 Drops This Date Mako Shark 5 Reef Ball Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (5) Tonnage: 10 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 54' 52" N | 85° 32' 33" W |
Mexico Beach Site - Redfish |
2 Nd Of 11 Drops This Date Redfish 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 57 ft Relief: 4 ft [1] Tides & Solunars |
57 ft | 29° 53' 9" N | 85° 31' 60" W |
Mexico Beach Site - Snapper |
11 4Th Of 11 Loads This Date Snapper Reef 10 Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 57 ft Relief: 4 ft [1] Tides & Solunars |
57 ft | 29° 53' 18" N | 85° 31' 59" W |
Mexico Beach Site - Spanish |
3 Rd Of 11 Drops This Date Spanish 10 Reef Balls Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 40 ft Relief: 4 ft [1] Tides & Solunars |
40 ft | 29° 53' 25" N | 85° 31' 59" W |
Midway Site - 331 Bridge - #1 |
331 Bridge 7 Pieces 5/3/91 Concrete Decks Date of Deployment: May 3 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 2' 23" N | 85° 43' 14" W | |
Midway Site - 331 Bridge - #2 |
331 Bridge 8 Pieces 5/7/91 Concrete Decks Date of Deployment: May 7 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 2' 23" N | 85° 43' 14" W | |
Midway Site - 331 Bridge - #3 |
331 Bridge10 Pieces 5/28/91 Concrete Decks Date of Deployment: May 28 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 2' 28" N | 85° 43' 34" W | |
Midway Site - 331 Bridge - #4 |
331 Bridge10 Pieces 5/30/91 Concrete Decks Date of Deployment: May 30 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 2' 28" N | 85° 43' 34" W | |
Midway Original Site |
Concrete Culverts Date of Deployment: July 10 1978 Primary Material: CONCRETE CULVERTS County: BAY Depth: 74 ft Relief: 8 ft [1] Tides & Solunars |
74 ft | 30° 2' 22" N | 85° 43' 20" W |
Midway Site |
Split And Bundled Tires 4 Of 9 Loads-Also-8/18/838/30 And 9/26/83 Date of Deployment: October 26 1983 Primary Material: TIRES County: BAY Depth: 72 ft [1] Tides & Solunars |
72 ft | 30° 2' 18" N | 85° 43' 23" W |
Midway Site - Tires |
Split And Bundled Tires 9 4Th Of 9 Loads Documented (3 Undocumented) Date of Deployment: November 8 1983 Primary Material: TIRES County: BAY Depth: 71 ft [1] Tides & Solunars |
71 ft | 30° 2' 17" N | 85° 43' 24" W |
Midway Site - Tires |
Bundled Tires 8 4Th Of 9 Loads This Grant Date of Deployment: November 8 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 41" N | 85° 43' 12" W | |
Midway Site - Tires |
Bundled Tires 4 4Th Of 9 Loads This Grant Date of Deployment: August 18 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site - Tires |
Bundled Tires 7Th Of 9 Loads This Grant Date of Deployment: October 6 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site - Tires |
Bundled Tires 5Th Of 9 Loads This Grant Date of Deployment: August 30 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site - Tires |
Bundled Tires 6Th Of 9 Loads This Grant Date of Deployment: September 26 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site - Tires |
Bundled Tires 3Rd Of 11 Loads This Grant Date of Deployment: June 27 1980 Primary Material: TIRES (1650) County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site - Tires |
12 Bridge Spans 464 Tires 1Rst Of 16 Loads This Grant Date of Deployment: June 17 1980 Primary Material: BRIDGE SPANS CONCRETE (12) Tonnage: 127 County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site #6 |
Concrete Rubble And Tires (19Yds) 12Th Of 16 Loads This Grant Date of Deployment: August 26 1980 Primary Material: CONCRETE RUBBLE County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site #6 - Tires |
Bundled Tires 14Th Of 16 Loads This Grant Date of Deployment: September 9 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site #6 - Tires |
Bundled Tires 13Th Of 16 Loads This Grant Date of Deployment: September 2 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site #6 - Tires |
Bundled Tires 7Th Of 16 Loads This Grant Date of Deployment: July 23 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site #6 -Tires |
Bundled Tires 16Th Last Loads Of 16 Loads This Grant Date of Deployment: September 22 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site #6- Tires |
Bundled Tires 6Th Of 16 Loads This Grant Date of Deployment: July 8 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 2' 42" N | 85° 43' 10" W | |
Midway Site Boxcars |
Boxcars Date of Deployment: December 31 1988 Primary Material: BOXCARS County: BAY Depth: 72 ft Relief: 10 ft [1] Tides & Solunars |
72 ft | 30° 2' 23" N | 85° 43' 21" W |
Monica Lee Tugboat |
Steel Hull 49’ Long Tugboat, the "Monica Lee" Primary Material: Vessel Deploy Date: 2011/05/10 Depth: 117 ft Relief: 20 ft [2] Tides & Solunars |
117 ft | 30° 9' 20" N | 86° 22' 13" W |
Mooring Buoy Site - 331 |
331 Bridge 7 Pieces 4/23/91 Concrete Decks Date of Deployment: April 23 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 4' 56" N | 85° 43' 24" W | |
Navy Barge |
Navy Barge 45 Feet Deep Date of Deployment: Primary Material: BARGE STEEL County: BAY Depth: 45 ft [1] Tides & Solunars |
45 ft | 30° 4' 21" N | 85° 42' 28" W |
Navy Barge |
Steel Barge Donated By The Navy Date of Deployment: June 5 1994 Primary Material: BARGE STEEL County: BAY Depth: 48 ft Relief: 5 ft [1] Tides & Solunars |
48 ft | 30° 4' 60" N | 85° 43' 56" W |
Okaloosa County Lap Site B |
16 Fish Haven Modules Primary Material: Module Deploy Date: 2000/05/25 Depth: 244 ft Relief: 6 ft [2] Tides & Solunars |
244 ft | 29° 58' 23" N | 86° 31' 11" W |
Okaloosa County Lap Site C |
Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #4 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [2] Tides & Solunars |
118 ft | 30° 8' 1" N | 86° 36' 16" W |
Okaloosa County Lap Site C |
Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #5 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [2] Tides & Solunars |
118 ft | 30° 8' 2" N | 86° 36' 16" W |
Okaloosa County Lap Site C |
Center of 15 Fish Havens (5-FHT, 5-FH, 5-FHJR), Complex #1 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 116 ft Relief: 6 ft [2] Tides & Solunars |
116 ft | 30° 8' 2" N | 86° 36' 18" W |
Okaloosa County Lap Site C |
Center of 14 Fish Havens (4-FHT, 5-FH, 5-FHJR), Complex #2 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [2] Tides & Solunars |
118 ft | 30° 8' 3" N | 86° 36' 18" W |
Okaloosa County Lap Site C |
Center of 11 Fish Havens (5-FHT, 6-Fh, 0-FHJR), Complex #3 of 5 Primary Material: Module Deploy Date: 1999/05/10 Depth: 118 ft Relief: 6 ft [2] Tides & Solunars |
118 ft | 30° 8' 3" N | 86° 36' 18" W |
Ozark |
Navy Mine Layer, Target Ship, AKA "USS Ozark" (MCS-2) Primary Material: Vessel Deploy Date: 1982/00/00 Depth: 325 ft Relief: 125 ft [2] Tides & Solunars |
325 ft | 29° 55' 6" N | 86° 34' 56" W |
PCMI Barge Site - PCMI Barge |
Steel Barge And Scrap Steel Date of Deployment: December 31 1980 Primary Material: BARGE STEEL County: BAY Depth: 75 ft Relief: 6 ft [1] Tides & Solunars |
75 ft | 30° 6' 50" N | 85° 49' 32" W |
PCMI Barge Site - Tires |
Split Tires And Airplane 5 Loads Also 3/102/12 And 1/6/82 And 11/24/81 Date of Deployment: April 14 1982 Primary Material: TIRES County: BAY Depth: 71 ft [1] Tides & Solunars |
71 ft | 30° 6' 60" N | 85° 49' 34" W |
PCMI Barge Site - Tires 1 |
Bundled Tires 1Rst Of 11 Loads This Grant Date of Deployment: July 7 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 7' 13" N | 85° 49' 20" W | |
PCMI Barge Site - Tires 2 |
Bundled Tires 2Nd Of 11 Loads This Grant Date of Deployment: July 9 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 7' 13" N | 85° 49' 20" W | |
PCMI Barge Site - Tires 3 |
Bundled Tires 3Rd Of 11 Loads This Grant Date of Deployment: July 14 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 7' 13" N | 85° 49' 20" W | |
PCMI Barge Site - Tires 4 |
Bundled Tires 4Th Of 11 Loads This Grant Date of Deployment: July 16 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 7' 13" N | 85° 49' 20" W | |
PCMI Barge Site - Tires 5 |
Bundled Tires 5Th Of 11 Loads This Grant Date of Deployment: July 23 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 7' 13" N | 85° 49' 20" W | |
PCMI Barge Site - Tires 7 |
Bundled Tires 7Th Of 11 Loads This Grant Date of Deployment: August 4 1981 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 7' 13" N | 85° 49' 20" W | |
PCMI Barge Site - Tires 8 |
Split Bundled Tires 8 Loads Also 7/77/97/147/167/238/4 And 8/18/8 Date of Deployment: August 11 1981 Primary Material: TIRES County: BAY Depth: 71 ft Relief: 7 ft [1] Tides & Solunars |
71 ft | 30° 6' 49" N | 85° 49' 32" W |
PCMI Barge Site - Tires 9 |
Bundled Tires 9Th Of 11 Loads This Grant Date of Deployment: August 18 1981 Primary Material: TIRES County: BAY Depth: 71 ft [1] Tides & Solunars |
71 ft | 30° 6' 47" N | 85° 49' 34" W |
Phinizy Reef |
4 Of 5 Drops Of Reefballs This Date Mbara Funded Date of Deployment: June 21 2002 Primary Material: MODULES CONCRETE REEFBALLS (10) Tonnage: 20 County: BAY Depth: 25 ft Relief: 6 ft [1] Tides & Solunars |
25 ft | 29° 54' 9" N | 85° 28' 26" W |
Raffield's Reef |
Fiberglass Boat Parts Tires Scrap Steel Date of Deployment: December 31 1987 Primary Material: SHIP FIBERGLASS County: BAY Depth: 110 ft [1] Tides & Solunars |
110 ft | 29° 55' 1" N | 85° 48' 46" W |
Red Dove Reef |
Funded By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS (10) County: BAY Depth: 40 ft Relief: 3 ft [1] Tides & Solunars |
40 ft | 29° 53' 29" N | 85° 32' 51" W |
Reef Ex Center Site - #1 |
Reef-Ex Tank #6 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 37" N | 85° 51' 56" W |
Reef Ex Center Site - #2 |
Reef-Ex Tank #8 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 40" N | 85° 51' 57" W |
Reef Ex Center Site - #3 |
Reef-Ex Tank #7 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 38" N | 85° 51' 56" W |
Reef Ex Center Site - #4 |
Reef-Ex Tank #9 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 41" N | 85° 51' 56" W |
Reef Ex Center Site - #5 |
Reef-Ex Tank #10-Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 39" N | 85° 51' 55" W |
Reef Ex East Site - #1 |
Reef-Ex Tank #12-Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 14" N | 85° 51' 4" W |
Reef Ex East Site - #2 |
Reef-Ex Tank #13-Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 14" N | 85° 51' 1" W |
Reef Ex East Site - #3 |
Reef-Ex Tank #11-Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 59' 14" N | 85° 51' 4" W |
Reef Ex West Site - #1 |
Reef-Ex Tank #3 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 30° 0' 6" N | 85° 52' 40" W |
Reef Ex West Site - #2 |
Reef-Ex Tank #1 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 30° 0' 8" N | 85° 52' 39" W |
Reef Ex West Site - #3 |
Reef-Ex Tank #5 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 30° 0' 6" N | 85° 52' 42" W |
Reef Ex West Site - #4 |
Reef-Ex Tank #4 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 30° 0' 6" N | 85° 52' 43" W |
Reef Ex West Site - #5 |
Reef-Ex Tank #2 -Panama City Date of Deployment: December 20 1994 Primary Material: ARMY TANKS M-60 Tonnage: 50 County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 30° 0' 7" N | 85° 52' 42" W |
Sandy Reef - 1 |
Bridge Spans 1Rst Load Of 4 Date of Deployment: October 1 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 216 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 51" N | 85° 41' 14" W |
Sandy Reef - 2 |
Bridge Spans 2 Nd Load Of 4 Date of Deployment: October 8 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 216 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 52" N | 85° 41' 19" W |
Sandy Reef - 3 |
Bridge Spans 3 Rd Load Of 4 Date of Deployment: October 13 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 216 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 51" N | 85° 41' 18" W |
Sandy Reef - 4 |
Bridge Spans 4 4Th Load Of 4 Date of Deployment: October 30 1996 Primary Material: BRIDGE SPANS CONCRETE Tonnage: 106 County: GULF Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 39' 50" N | 85° 41' 16" W |
Sandy Reef Phase II - 1 |
1Rst Of 4 Deployments This Date192 Reef Balls Total Patch #1 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEF BALLS(48) County: GULF Depth: 100 ft Relief: 4 ft [1] Tides & Solunars |
100 ft | 29° 40' 0" N | 85° 41' 13" W |
Sandy Reef Phase II - 2 |
2Nd Of 4 Deployments This Date Patch#2 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEFBALLS (48) County: GULF Depth: 100 ft Relief: 2 ft [1] Tides & Solunars |
100 ft | 29° 39' 58" N | 85° 41' 9" W |
Sandy Reef Phase II - 3 |
3Rd Of 4 Deployments This Date Patch#3 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEFBALLS (48) County: GULF Depth: 100 ft Relief: 2 ft [1] Tides & Solunars |
100 ft | 29° 39' 55" N | 85° 41' 8" W |
Sandy Reef Phase II - 4 |
4Th Of 4 Deployments This Date Patch#4 Date of Deployment: May 5 1998 Primary Material: MODULES CONCRETE REEFBALLS (48) County: GULF Depth: 100 ft Relief: 2 ft [1] Tides & Solunars |
100 ft | 29° 39' 48" N | 85° 41' 10" W |
Sherman X Tug Boat |
80 Feet Long Steel Hulled Tug Boat Date of Deployment: May 22 1996 Primary Material: SHIP STEEL TUG 80’ County: BAY Depth: 80 ft Relief: 20 ft [1] Tides & Solunars |
80 ft | 29° 55' 4" N | 85° 40' 28" W |
Smith Barge Site - 331 Bridge |
331 Bridge 8 Pieces 5/17/91 Concrete Decks Date of Deployment: May 17 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 4' 50" N | 85° 45' 36" W | |
Smurfit-Stone - #1 |
4 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: September 19 2002 Primary Material: STEEL CYLINDERS (4) Tonnage: 80 County: BAY Depth: 60 ft Relief: 12 ft [1] Tides & Solunars |
60 ft | 29° 54' 44" N | 85° 32' 31" W |
Smurfit-Stone - #2 |
4 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: September 18 2002 Primary Material: STEEL CYLINDERS (4) Tonnage: 80 County: BAY Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 29° 53' 14" N | 85° 32' 26" W |
Smurfit-Stone - #3 |
2 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: September 19 2002 Primary Material: STEEL CYLINDERS (2) Tonnage: 40 County: BAY Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 29° 53' 50" N | 85° 32' 34" W |
Smurfit-Stone - #4 |
2 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: September 18 2002 Primary Material: STEEL CYLINDERS (2) Tonnage: 40 County: BAY Depth: 60 ft Relief: 12 ft [1] Tides & Solunars |
60 ft | 29° 53' 50" N | 85° 32' 1" W |
Smurfit-Stone - #5 |
2 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: October 25 2002 Primary Material: STEEL CYLINDERS (2) Tonnage: 40 County: BAY Depth: 60 ft Relief: 12 ft [1] Tides & Solunars |
60 ft | 29° 54' 9" N | 85° 31' 39" W |
Smurfit-Stone - #6 |
4 Steel Cylinders Each 24’ Long By 12’ Diameter Date of Deployment: October 25 2002 Primary Material: STEEL CYLINDERS (4) Tonnage: 80 County: BAY Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 29° 53' 26" N | 85° 31' 44" W |
Spanish Shanty Barge (Bay) |
150 Feet Long Barge Inside The Bay Date of Deployment: Primary Material: BARGE STEEL County: BAY Depth: 20 ft [1] Tides & Solunars |
20 ft | 30° 6' 42" N | 85° 42' 15" W |
Stage 1 East -Boxcars |
Boxcars Date of Deployment: December 31 1988 Primary Material: BOXCARS County: BAY Depth: 95 ft [1] Tides & Solunars |
95 ft | 29° 58' 1" N | 85° 48' 55" W |
Stage 1 East -Original Site |
Concrete Rubble Date of Deployment: July 15 1978 Primary Material: CONCRETE RUBBLE County: BAY Depth: 100 ft [1] Tides & Solunars |
100 ft | 29° 58' 1" N | 85° 48' 56" W |
Stage I East- Hathaway |
#18 H.Bridge3 Spans5/13/88Concrete Decks Date of Deployment: May 13 1988 Primary Material: BRIDGE SLABS CONCRETE Tonnage: 80 County: BAY Depth: 96 ft Relief: 8 ft [1] Tides & Solunars |
96 ft | 29° 56' 40" N | 85° 49' 12" W |
Stage I Site #5 |
Tires And Scrap Steel 11 4Th Of 16 Loads This Grant Date of Deployment: August 19 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
29° 58' 27" N | 85° 48' 42" W | |
Stage I Site #5- |
Concrete Rubble 4Th Of 16 Loads This Grant Date of Deployment: July 1 1980 Primary Material: CONCRETE RUBBLE County: BAY [1] Tides & Solunars |
29° 58' 27" N | 85° 48' 42" W | |
Stage I Site #5- Tires |
Bundled Tires 10Th Of 16 Loads This Grant Date of Deployment: August 13 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
29° 58' 27" N | 85° 48' 42" W | |
Stage I Site #5- Tires |
Bundled Tires 9Th Of 16 Loads This Grant Date of Deployment: August 1 1980 Primary Material: TIRES County: BAY [1] Tides & Solunars |
29° 58' 27" N | 85° 48' 42" W | |
Starfish Reef - Patch #1 |
15 Walter Tetrahedrons, 1 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [2] Tides & Solunars |
100 ft | 30° 8' 58" N | 86° 37' 40" W |
Starfish Reef - Patch #2 |
16 Walter Tetrahedrons, 2 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [2] Tides & Solunars |
100 ft | 30° 8' 55" N | 86° 37' 32" W |
Starfish Reef - Patch #3 |
16 Walter Tetrahedrons, 3 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [2] Tides & Solunars |
100 ft | 30° 8' 48" N | 86° 37' 28" W |
Starfish Reef - Patch #4 |
15 Walter Tetrahedrons, 4 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/06/08 Depth: 100 ft Relief: 10 ft [2] Tides & Solunars |
100 ft | 30° 8' 42" N | 86° 37' 32" W |
Starfish Reef - Patch #5 |
16 Walter Tetrahedrons, 1 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [2] Tides & Solunars |
103 ft | 30° 8' 37" N | 86° 37' 40" W |
Starfish Reef - Patch #6 |
15 Walter Tetrahedrons, 2 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [2] Tides & Solunars |
103 ft | 30° 8' 40" N | 86° 37' 48" W |
Starfish Reef - Patch #7 |
16 Walter Tetrahedrons, 3 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [2] Tides & Solunars |
103 ft | 30° 8' 48" N | 86° 37' 52" W |
Starfish Reef - Patch #8 |
15 Walter Tetrahedrons, 4 of 4 Drops This Grant And Date Primary Material: Module Deploy Date: 2004/04/20 Depth: 103 ft Relief: 10 ft [2] Tides & Solunars |
103 ft | 30° 8' 55" N | 86° 37' 48" W |
Steel Dredge Boat |
Old Steel Dredge Boat Deployed By City Of Mexico Beach Date of Deployment: April 17 2004 Primary Material: SHIP STEEL DREDGE BOAT 50’ County: BAY Depth: 115 ft Relief: 10 ft [1] Tides & Solunars |
115 ft | 29° 46' 43" N | 85° 50' 2" W |
T Square Reef |
Bundles Of Tires Date of Deployment: December 31 1987 Primary Material: TIRES County: BAY Depth: 132 ft [1] Tides & Solunars |
132 ft | 29° 37' 5" N | 85° 55' 5" W |
The Black Bart |
180’ Oil Rig Supply Ship The Black Bart. Date of Deployment: July 16 1993 Primary Material: SHIP STEEL 180’ County: BAY Depth: 79 ft Relief: 25 ft [1] Tides & Solunars |
79 ft | 30° 3' 37" N | 85° 49' 27" W |
Triggerfish Reef |
Funded And Deployed By Mbara Date of Deployment: October 28 1997 Primary Material: MODULES CONCRETE REEFBALLS County: BAY Depth: 40 ft Relief: 3 ft [1] Tides & Solunars |
40 ft | 29° 54' 1" N | 85° 32' 38" W |
Tully |
100ft push tug Primary Material: Vessel Deploy Date: 0//0 Depth: 135 ft Relief: 20 ft [2] Tides & Solunars |
135 ft | 30° 7' 9" N | 86° 26' 4" W |
Unnamed |
Concrete Pipes And Junction Boxes 112 Pieces 1Rst Of 2 Loads This Gran Date of Deployment: June 26 2001 Primary Material: CONCRETE PRECAST STRUCTURES (112) Tonnage: 160.1 County: BAY Depth: 52 ft Relief: 8 ft [1] Tides & Solunars |
52 ft | 29° 53' 42" N | 85° 31' 17" W |
Unnamed |
Concrete Pipes And Junction Boxes 112 Pieces 2Nd Of 2 Loads This Grant Date of Deployment: June 28 2001 Primary Material: CONCRETE PRECAST STRUCTURES (117) Tonnage: 190.1 County: BAY Depth: 52 ft Relief: 8 ft [1] Tides & Solunars |
52 ft | 29° 53' 42" N | 85° 31' 17" W |
Unnamed |
30-40 Pieces Culverts/Boxes/Risers Date of Deployment: December 10 1999 Primary Material: CONCRETE PRECAST STRUCTURES County: BAY Depth: 20 ft Relief: 5 ft [1] Tides & Solunars |
20 ft | 29° 54' 28" N | 85° 27' 50" W |
Uss Strength |
184 Feet Minesweeper Tender The Uss Strength Date of Deployment: May 19 1987 Primary Material: SHIP STEEL 184’ County: BAY Depth: 77 ft Relief: 35 ft [1] Tides & Solunars |
77 ft | 30° 1' 57" N | 85° 42' 31" W |
VALP #3 |
65’ Steel Hull (broken up), Concrete Culvert Pipe Sections Primary Material: Culverts Deploy Date: 1996/08/05 Depth: 109 ft Relief: 6 ft [2] Tides & Solunars |
109 ft | 30° 9' 48" N | 86° 24' 44" W |
Valparaiso #8 |
18" Dia. Culverts Nested Inside 30" Dia. Culverts, 94 Pairs All in one Location Primary Material: Culverts Deploy Date: 2002/05/08 Depth: 105 ft Relief: 5 ft [2] Tides & Solunars |
105 ft | 30° 8' 60" N | 86° 33' 16" W |
Virginia Reef - Site 1 |
Boat Hulls-Metal Crates-And Concrete Rubble. Date of Deployment: August 2 1991 Primary Material: SHIP FIBERGLASS BOAT HULL County: GULF Depth: 65 ft [1] Tides & Solunars |
65 ft | 29° 50' 50" N | 85° 31' 30" W |
Virginia Reef - Site 2 |
Bridge Rubble-Concrete Boxes-And Steel Hoppers. Date of Deployment: July 20 1993 Primary Material: BRIDGE RUBBLE County: GULF Depth: 66 ft Relief: 15 ft [1] Tides & Solunars |
66 ft | 29° 50' 33" N | 85° 31' 31" W |
Warsaw Site - 331 Bridge |
331 Bridge 7 Pieces 4/29/91 Concrete Decks Date of Deployment: April 29 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 3' 35" N | 85° 49' 4" W | |
Warsaw - Tires |
Bundled Tire 1Rs Of 9 Loads This Grant Date of Deployment: April 28 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 4' 36" N | 85° 48' 46" W | |
Warsaw Reef |
Spilt And Bundled Tires 4 Of 9 Loads-Also-4/287/13& 8/3/1983 Date of Deployment: April 21 1983 Primary Material: TIRES County: BAY Depth: 75 ft Relief: 3 ft [1] Tides & Solunars |
75 ft | 30° 4' 11" N | 85° 48' 59" W |
Warsaw Site |
Concrete Rubble Date of Deployment: December 31 1988 Primary Material: CONCRETE RUBBLE County: BAY Depth: 80 ft [1] Tides & Solunars |
80 ft | 30° 4' 0" N | 85° 48' 7" W |
Warsaw Site - Tires |
Bundled Tires 3Rd Of 9 Loads This Grant Date of Deployment: August 3 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 4' 36" N | 85° 48' 46" W | |
Warsaw Site - Tires |
Bundled Tires 2Nd Of 9 Loads This Grant Date of Deployment: July 13 1983 Primary Material: TIRES County: BAY [1] Tides & Solunars |
30° 4' 36" N | 85° 48' 46" W | |
Wet And Wild Site - 331 |
331 Bridge 8 Pieces 5/24/91 Concrete Decks Date of Deployment: May 24 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 5' 22" N | 85° 44' 12" W | |
Wet And Wild Site - 331 |
331 Bridge10 Pieces 5/2/91 Concrete Decks Date of Deployment: May 2 1991 Primary Material: BRIDGE SLABS CONCRETE County: BAY [1] Tides & Solunars |
30° 5' 22" N | 85° 44' 12" W | |
Williams Reef - 1A |
6th of 10 Drops This Date, This Reef, Valparaiso-Williams 1A Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [2] Tides & Solunars |
109 ft | 30° 9' 53" N | 86° 24' 6" W |
Williams Reef - 1B |
7th of 10 Drops This Date, This Reef, Valparaiso-Williams 1B Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [2] Tides & Solunars |
109 ft | 30° 10' 2" N | 86° 24' 14" W |
Williams Reef - 1C |
8th of 10 Drops This Date, This Reef, Valparaiso-Williams 1C Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [2] Tides & Solunars |
109 ft | 30° 10' 12" N | 86° 23' 58" W |
Williams Reef - 1D |
9th of 10 Drops This Date, This Reef, Valparaiso-Williams 1D Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [2] Tides & Solunars |
109 ft | 30° 10' 9" N | 86° 23' 42" W |
Williams Reef - 1E |
10 4th of 10 Drops This Date, This Reef, Valparaiso-Williams 1E Primary Material: Culverts Deploy Date: 1998/05/20 Depth: 109 ft Relief: 6 ft [2] Tides & Solunars |
109 ft | 30° 9' 15" N | 86° 23' 45" W |