Collier County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Amt Reef About 400 Large (3 Ft) Pieces Of Concrete Rubble Three Drops Also 11
Date of Deployment: November 23 2004
Primary Material: CONCRETE RUBBLE (400)
Tonnage: 1800
County: COLLIER
Depth: 45 ft

Relief: 10 ft [1]
Tides & Solunars
45 ft 25° 54' 36" N 81° 59' 5" W
Caxambas Pass 14 Miles Reef 360 Tons Of Concrete Culverts (Not Located 12/01).
Date of Deployment: May 18 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 360
County: COLLIER
Depth: 46 ft
[1]
Tides & Solunars
46 ft 25° 47' 31" N 81° 57' 15" W
Caxambas Pass 2.5 Mile 180 Tons Pipe And 160 Tons Pilings 20K Sq. Ft 1 Of 2 Loads (Not Foun
Date of Deployment: May 22 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 340
County: COLLIER
Depth: 24 ft
[1]
Tides & Solunars
24 ft 25° 55' 48" N 81° 46' 0" W
Caxambas Pass 2.5 Mile 170 Tons Of Pilings 2Nd Of Two Loads (Not Found 12/01)
Date of Deployment: May 28 1997
Primary Material: CONCRETE PILINGS
Tonnage: 170
County: COLLIER
Depth: 24 ft
[1]
Tides & Solunars
24 ft 25° 55' 55" N 81° 45' 12" W
Caxambas Pass 5.0 Mile Marco 5 Mile 1972 Concrete And Pipe (Not Located 12/01)
Date of Deployment: December 31 1972
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 30 ft
[1]
Tides & Solunars
30 ft 25° 51' 47" N 81° 47' 40" W
Clam Pass 3 Mile - 03 Concrete Manhole Risers And Covers ,20000 Funded By City Of Naples And C
Date of Deployment: May 31 2001
Primary Material: CONCRETE MANHOLE RISERS (28)
Tonnage: 358.5
County: COLLIER
Depth: 25 ft

Relief: 8 ft [1]
Tides & Solunars
25 ft 26° 13' 35" N 81° 52' 13" W
Clam Pass 3 Mile - Pile 1800 Concrete Railroad Ties 8’X12X10
Date of Deployment: June 1 2001
Primary Material: CONCRETE RAILROAD TIES (1800)
Tonnage: 591.7
County: COLLIER
Depth: 26 ft

Relief: 11 ft [1]
Tides & Solunars
26 ft 26° 13' 34" N 81° 52' 4" W
Clam Pass 3 Mile -01 Six Feet Across Concrete Slabs And Pilings (1 Of 2 Deployments)
Date of Deployment: May 14 2000
Primary Material: CONCRETE RUBBLE (100)
Tonnage: 345.8
County: COLLIER
Depth: 25 ft

Relief: 8 ft [1]
Tides & Solunars
25 ft 26° 13' 34" N 81° 52' 4" W
Clam Pass 3 Mile -02 Six Feet Across Concrete Slabs Pilings And Cutoffs (2 Of 2 Deploymen
Date of Deployment: May 22 2000
Primary Material: CONCRETE RUBBLE (100)
Tonnage: 392.6
County: COLLIER
Depth: 25 ft

Relief: 8 ft [1]
Tides & Solunars
25 ft 26° 13' 23" N 81° 52' 3" W
Clam Pass 3 Mile -C And D Rubble And Pilings County Funded ,25695
Date of Deployment: September 26 2003
Primary Material: CONCRETE RUBBLE (500)
Tonnage: 571
County: COLLIER [1]
Tides & Solunars
26° 13' 27" N 81° 52' 14" W
Collier 5 Mile Reef 1000 Yards Of Concrete Pilings (Curbs) 2Nd Of 3 Loads This Grant
Date of Deployment: November 4 1980
Primary Material: CONCRETE PILINGS
County: COLLIER
Depth: 31 ft

Relief: 6 ft [1]
Tides & Solunars
31 ft 25° 51' 20" N 81° 47' 37" W
Collier 5 Mile Reef 800 Yards Of Concrete Pilings (Curbs) Confirmed By Rbf Grant Fwcc-01
Date of Deployment: November 8 1980
Primary Material: CONCRETE PILINGS
County: COLLIER
Depth: 31 ft

Relief: 3 ft [1]
Tides & Solunars
31 ft 25° 51' 50" N 81° 47' 38" W
Collier 5 Mile Reef 72X32x6 Ft Barge And 512Yds Of Pilings Confirmed By Rbf Grant Fwcc-0
Date of Deployment: October 29 1980
Primary Material: BARGE STEEL 72’
County: COLLIER
Depth: 31 ft

Relief: 6 ft [1]
Tides & Solunars
31 ft 25° 51' 54" N 81° 47' 47" W
Doc Kline Lincolin Logs 2 Piles Of Pilings(36 Total) At 30’ X 1’ X 1’
Date of Deployment: September 5 2000
Primary Material: CONCRETE PILINGS
County: LEE
Depth: 30 ft

Relief: 8 ft [1]
Tides & Solunars
30 ft 26° 20' 21" N 82° 5' 24" W
Doctor's Pass 5 Mile 800 Tons Of Concrete Culverts (Not Located 12/01)
Date of Deployment: May 27 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 800
County: COLLIER
Depth: 34 ft

Relief: 4 ft [1]
Tides & Solunars
34 ft 26° 10' 13" N 81° 54' 22" W
E-F (Jaycees) Reef 310 Tons Of Concrete Culverts.
Date of Deployment: June 30 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 310
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 5" N 82° 5' 21" W
E-F (Jaycees) Reef 225 Tons Of Concrete Culverts.
Date of Deployment: June 7 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 225
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 82° 5' 21" W
E-F (Jaycees) Reef 300 Tons Of Precast Concrete.
Date of Deployment: June 30 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: LEE
Depth: 31 ft

Relief: 8 ft [1]
Tides & Solunars
31 ft 26° 20' 9" N 82° 5' 33" W
Eca Reef Concrete Rubble And Steel I Beams ,10000 Funded By Eca
Date of Deployment: May 24 2001
Primary Material: CONCRETE RUBBLE (200)
Tonnage: 319.1
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 22" N 81° 52' 21" W
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 26 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 82° 5' 7" W
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Date of Deployment: May 25 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 82° 5' 7" W
Evan Thompson Reef Units Five 7’ X 7’ Slabs With Two Culverts Each
Date of Deployment: May 27 2000
Primary Material: CONCRETE CULVERTS (10)
County: LEE
Depth: 32 ft

Relief: 12 ft [1]
Tides & Solunars
32 ft 26° 20' 17" N 82° 5' 7" W
G-H Reef 110’ Steel Barge-35’ Steel Tugboat-Steel Dumpsters.
Date of Deployment: August 1 1984
Primary Material: BARGE STEEL
County: LEE
Depth: 30 ft
[1]
Tides & Solunars
30 ft 26° 20' 35" N 81° 57' 14" W
G-H Reef Limestone Added To Previous Materials.
Date of Deployment: May 7 1994
Primary Material: ROCK LIMESTONE
Tonnage: 510
County: LEE
Depth: 28 ft

Relief: 6 ft [1]
Tides & Solunars
28 ft 26° 20' 39" N 81° 57' 31" W
G-H Reef 8 Concrete And Screen Juvenile Habitats Large Diameter Vertical
Date of Deployment: December 14 1995
Primary Material: CONCRETE CULVERTS
County: LEE
Depth: 27 ft

Relief: 8 ft [1]
Tides & Solunars
27 ft 26° 20' 40" N 81° 56' 42" W
G-H Reef Concrete Culverts 4.5 Miles From Big Carlos Pass
Date of Deployment: May 24 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 450
County: LEE
Depth: 28 ft
[1]
Tides & Solunars
28 ft 26° 20' 45" N 81° 57' 11" W
Gordon Pass 14 Mile Reef 1993 800 Tons Concrete Culvert And Rubble (Not Located 12/01)
Date of Deployment: December 31 1993
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 42 ft
[1]
Tides & Solunars
42 ft 26° 14' 11" N 82° 7' 35" W
Gordon Pass 5 Mile Reef - #1 1 Barge Of Square Shaped Power Poles Hollow Inside (Not Found 12/01)
Date of Deployment: June 5 1996
Primary Material: CONCRETE PILINGS
Tonnage: 680
County: COLLIER
Depth: 26 ft

Relief: 3 ft [1]
Tides & Solunars
26 ft 26° 5' 9" N 81° 53' 20" W
Gordon Pass 5 Mile Reef - #10 Confirmed By Rbf Grant Fwcc-01002
Date of Deployment:
Primary Material: BRIDGE RUBBLE CONCRETE
County: COLLIER
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 26° 5' 48" N 81° 53' 18" W
Gordon Pass 5 Mile Reef - #11 Dc3 Fuselage And Concrete Culverts (Not Located 12/01)
Date of Deployment: December 7 1987
Primary Material: AIRPLANE DC3
County: COLLIER
Depth: 25 ft
[1]
Tides & Solunars
25 ft 26° 5' 26" N 81° 53' 42" W
Gordon Pass 5 Mile Reef - #2 Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100
Date of Deployment: March 1 1993
Primary Material: STEEL RECTANGULAR TANKS
County: COLLIER
Depth: 35 ft

Relief: 4 ft [1]
Tides & Solunars
35 ft 26° 5' 47" N 81° 53' 21" W
Gordon Pass 5 Mile Reef - #3 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 53" N 81° 53' 8" W
Gordon Pass 5 Mile Reef - #4 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 52" N 81° 53' 9" W
Gordon Pass 5 Mile Reef - #5 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 54" N 81° 53' 8" W
Gordon Pass 5 Mile Reef - #6 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 54" N 81° 53' 7" W
Gordon Pass 5 Mile Reef - #7 Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 26° 4' 54" N 81° 53' 8" W
Gordon Pass 5 Mile Reef - #8 Confirmed By Rbf Grant Fwcc-01002
Date of Deployment:
Primary Material: BRIDGE RUBBLE CONCRETE
County: COLLIER
Depth: 35 ft

Relief: 5 ft [1]
Tides & Solunars
35 ft 26° 5' 47" N 81° 53' 20" W
Gordon Pass 5 Mile Reef - #9 Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100
Date of Deployment: March 1 1993
Primary Material: BRIDGE RUBBLE CONCRETE
County: COLLIER
Depth: 35 ft

Relief: 4 ft [1]
Tides & Solunars
35 ft 26° 5' 48" N 81° 53' 19" W
Gordon Pass 9 Mile 92 Concrete Modules Set In Six Rows From North To South.
Date of Deployment: June 29 1992
Primary Material: MODULES CONCRETE
County: COLLIER
Depth: 23 ft
[1]
Tides & Solunars
23 ft 26° 3' 46" N 81° 59' 21" W
Keewaydin 3 Mile - C And D Reef 01 Rubble And Culverts County Funded
Date of Deployment: June 19 2003
Primary Material: CONCREETE SLABS (100)
Tonnage: 612
County: COLLIER
Depth: 28 ft

Relief: 10 ft [1]
Tides & Solunars
28 ft 26° 2' 5" N 81° 49' 51" W
Keewaydin 3 Mile - C And D Reef 02 Rubble And Culverts County Funded
Date of Deployment: June 24 2003
Primary Material: CONCRETE RUBBLE (150)
Tonnage: 632
County: COLLIER
Depth: 28 ft

Relief: 10 ft [1]
Tides & Solunars
28 ft 26° 2' 11" N 81° 49' 52" W
Keewaydin 3 Mile - Site 1 Limestone Boulders -#1 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 8 ft [1]
Tides & Solunars
27 ft 26° 2' 2" N 81° 49' 47" W
Keewaydin 3 Mile - Site 2 Limestone Boulders -#2 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 9 ft [1]
Tides & Solunars
27 ft 26° 2' 7" N 81° 49' 51" W
Keewaydin 3 Mile - Site 3 Limestone Boulders -#3 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 12 ft [1]
Tides & Solunars
27 ft 26° 2' 10" N 81° 49' 54" W
Keewaydin 3 Mile - Site 4 Limestone Boulders -#4 Of 4 Patch Reefs This Day/Grant
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER
Depth: 27 ft

Relief: 11 ft [1]
Tides & Solunars
27 ft 26° 2' 14" N 81° 49' 58" W
Lee-Collier Lee-Collierbusses10/87Dgps
Date of Deployment: October 31 1987
Primary Material: STEEL BUSES
County: LEE
Depth: 35 ft
[1]
Tides & Solunars
35 ft 26° 17' 26" N 81° 55' 3" W
Marco 12 Mile Site M12a 1 Of 6 Drops This Grant 1 Of 2 This Date
Date of Deployment: June 9 2003
Primary Material: CONCRETE RAILROAD TIES
Tonnage: 417.8
County: COLLIER
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 25° 54' 35" N 81° 59' 9" W
Marco 12 Mile Site M12b 4 Of 6 Drops This Grant 2 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: LIMESTONE BOULDERS (50)
Tonnage: 142.8
County: COLLIER
Depth: 45 ft

Relief: 10 ft [1]
Tides & Solunars
45 ft 25° 54' 40" N 81° 59' 12" W
Marco 12 Mile Site M12c 3 Of 6 Drops This Grant 1 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: CONCRETE CULVERTS AND BOXES (720)
Tonnage: 44.9
County: COLLIER
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 25° 54' 42" N 81° 59' 2" W
Marco 12 Mile Site M12c 2 Of 6 Drops This Grant 2 Of 2 This Date
Date of Deployment: June 9 2003
Primary Material: CONCRETE RAILROAD TIES (180)
Tonnage: 81.6
County: COLLIER
Depth: 45 ft

Relief: 6 ft [1]
Tides & Solunars
45 ft 25° 54' 42" N 81° 59' 2" W
Marco 9 Mile M9b Richie Reef 5 Of 6 Drops This Grant 3 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: LIMESTONE BOULDERS (50)
Tonnage: 122.4
County: COLLIER
Depth: 39 ft

Relief: 10 ft [1]
Tides & Solunars
39 ft 25° 52' 58" N 81° 54' 12" W
Marco 9 Mile M9c 6 Of 6 Drops This Grant 4 Of 4 This Date
Date of Deployment: June 14 2003
Primary Material: CONCRETE CULVERTS AND BOXES (40)
Tonnage: 142.8
County: COLLIER
Depth: 39 ft

Relief: 8 ft [1]
Tides & Solunars
39 ft 25° 52' 58" N 81° 54' 3" W
Marco Island 12 Mile M12cd05 900 Tons Of Concrete Rubble
Date of Deployment: May 22 2005
Primary Material: CONCRETE RUBBLE
Tonnage: 900
County: COLLIER
Depth: 46 ft

Relief: 8 ft [1]
Tides & Solunars
46 ft 25° 54' 32" N 81° 59' 2" W
Marco Island 2 Mile - #1 Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 25° 55' 26" N 81° 46' 14" W
Marco Island 2 Mile - #2 Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 23 ft

Relief: 5 ft [1]
Tides & Solunars
23 ft 25° 55' 27" N 81° 46' 13" W
Marco Island 2 Mile - #3 Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 22 ft

Relief: 5 ft [1]
Tides & Solunars
22 ft 25° 55' 49" N 81° 46' 58" W
Marco Island 2 Mile - #4 Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1972
Primary Material: STEEL PIPE
County: COLLIER
Depth: 21 ft

Relief: 3 ft [1]
Tides & Solunars
21 ft 25° 55' 24" N 81° 45' 46" W
Marco Island 2 Mile - #5 Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1972
Primary Material: CONCRETE RUBBLE
County: COLLIER
Depth: 21 ft

Relief: 5 ft [1]
Tides & Solunars
21 ft 25° 55' 24" N 81° 45' 47" W
Marco Island 2 Mile - #6 Concrete Rubble And Tires No Buoy Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1972
Primary Material: CONCRETE RUBBLE
County: COLLIER
Depth: 23 ft

Relief: 4 ft [1]
Tides & Solunars
23 ft 25° 55' 26" N 81° 46' 14" W
Marco Island 5 Mile Reef - #1 Marco 5 Mile Dredge Pipe Pontoons1986
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 30 ft

Relief: 4 ft [1]
Tides & Solunars
30 ft 25° 51' 56" N 81° 47' 52" W
Marco Island 5 Mile Reef - #2 Marco 5 Mile 1986 Dredge Pipe
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 30 ft

Relief: 4 ft [1]
Tides & Solunars
30 ft 25° 51' 47" N 81° 47' 52" W
Marco Island 5 Mile Reef - #3 Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 31 ft

Relief: 4 ft [1]
Tides & Solunars
31 ft 25° 51' 56" N 81° 47' 49" W
Marco Island 5 Mile Reef - #4 Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
County: COLLIER
Depth: 31 ft

Relief: 4 ft [1]
Tides & Solunars
31 ft 25° 51' 49" N 81° 47' 39" W
Marco Island 5 Mile Reef - #5 Steel Barge Steel Pipe And Concrete Rubble
Date of Deployment: December 31 1986
Primary Material: BARGE STEEL
County: COLLIER
Depth: 30 ft

Relief: 7 ft [1]
Tides & Solunars
30 ft 25° 51' 53" N 81° 47' 58" W
Marco Island 5 Mile Reef - #6 Large Diameter Concrete Culverts
Date of Deployment: June 1 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: COLLIER
Depth: 32 ft

Relief: 4 ft [1]
Tides & Solunars
32 ft 25° 51' 54" N 81° 47' 47" W
Marco Island 9 Mile Reef - #1 Concrete Bridge And Pilings ,15000 Funded By City Of Marco Is. (1 Of 2
Date of Deployment: June 5 2001
Primary Material: BRIDGE CONCRETE DECKING (11)
Tonnage: 212.7
County: COLLIER
Depth: 39 ft

Relief: 5 ft [1]
Tides & Solunars
39 ft 25° 52' 51" N 81° 54' 9" W
Marco Island 9 Mile Reef - #2 Concrete Bridge Pilings And Rubble ,15000 Funded By City Of Marco Is.
Date of Deployment: June 7 2001
Primary Material: BRIDGE CONCRETE DECKING (7)
Tonnage: 239.4
County: COLLIER
Depth: 39 ft

Relief: 5 ft [1]
Tides & Solunars
39 ft 25° 52' 51" N 81° 54' 9" W
Marco Pass Reef Site 6 Loads10/3-5-20/83 And 12/1-2-3/83 (Not Located 12/01)
Date of Deployment: December 30 1983
Primary Material: CONCRETE CULVERTS
Tonnage: 1435
County: COLLIER
Depth: 22 ft
[1]
Tides & Solunars
22 ft 25° 55' 24" N 81° 46' 15" W
Memorial Reef Balls 1 Ultra 6 Reefballs And 8 Pallet Balls As Memorial Reef
Date of Deployment: August 6 2002
Primary Material: MODULES CONCRETE REEFBALLS (15)
Tonnage: 3.7
County: COLLIER
Depth: 39 ft

Relief: 5 ft [1]
Tides & Solunars
39 ft 25° 52' 47" N 81° 54' 5" W
Naples Pier Reef Widely Scattered Piles Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: June 17 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 250
County: COLLIER
Depth: 22 ft

Relief: 3 ft [1]
Tides & Solunars
22 ft 26° 7' 49" N 81° 50' 42" W
Naples Pier Reef Large Pile Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: June 17 1995
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 25 ft

Relief: 6 ft [1]
Tides & Solunars
25 ft 26° 8' 2" N 81° 50' 39" W
Pavilion Key 6 Mile Reef - Site 1 Barge And Concrete Rubble Confirmed By Rbf Grant Fwcc-01002
Date of Deployment:
Primary Material: BARGE STEEL
County: COLLIER
Depth: 17 ft

Relief: 8 ft [1]
Tides & Solunars
17 ft 25° 40' 58" N 81° 27' 49" W
Pavilion Key 6 Mile Reef - Site 2 Concrete Culverts And Rubble From Docks
Date of Deployment: December 31 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 16 ft
[1]
Tides & Solunars
16 ft 25° 41' 11" N 81° 28' 0" W
Pavilion Key 6 Mile Reef - Site 3 Lowered By Crane To The Bottom (Not Located 12/01)
Date of Deployment: April 28 1989
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 18 ft
[1]
Tides & Solunars
18 ft 25° 41' 18" N 81° 28' 0" W
Rock Reef - #1 About 130 Pieces Of 3 Ft. Limestone Boulders 1 Of 4 Drops This Grant
Date of Deployment: June 4 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 25" N 81° 52' 27" W
Rock Reef - #2 About 130 Pieces Of 3 Ft. Limestone Boulders 2 Of 4 Drops This Grant
Date of Deployment: June 9 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER
Depth: 24 ft

Relief: 5 ft [1]
Tides & Solunars
24 ft 26° 18' 17" N 81° 52' 23" W
Rock Reef - #3 About 65 Pieces Of 3 Ft. Limestone Boulders 3 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 27" N 81° 52' 23" W
Rock Reef - #4 About 65 Pieces Of 3 Ft. Limestone Boulders 4 Of 4 Drops This Grant
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER
Depth: 24 ft

Relief: 10 ft [1]
Tides & Solunars
24 ft 26° 18' 20" N 81° 52' 17" W
Santa Lucia 81 Ton Cement Boat Called The Santa Lucia
Date of Deployment: April 30 1997
Primary Material: SHIP CEMENT
Tonnage: 81
County: COLLIER
Depth: 24 ft
[1]
Tides & Solunars
24 ft 26° 5' 23" N 81° 50' 38" W
Wiggins Pass 14 Mile Reef Concrete Culverts And Rubble (Not Located 12/01)
Date of Deployment: December 31 1991
Primary Material: CONCRETE CULVERTS
County: COLLIER
Depth: 48 ft
[1]
Tides & Solunars
48 ft 26° 14' 52" N 82° 5' 50" W
Wiggins Pass 3 Mile C And D Rubble And Culverts County Funded-,29379.00
Date of Deployment: October 1 2003
Primary Material: CONCRETE RUBBLE (600)
Tonnage: 652.8
County: COLLIER
Depth: 27 ft

Relief: 10 ft [1]
Tides & Solunars
27 ft 26° 18' 19" N 81° 52' 26" W
Wiggins Pass 4.5 Mile Reef Steel Barge And Crane
Date of Deployment: February 4 1987
Primary Material: BARGE STEEL
County: COLLIER
Depth: 31 ft

Relief: 5 ft [1]
Tides & Solunars
31 ft 26° 17' 28" N 81° 55' 10" W
Wiggins Pass 5 Mile School Buses Coke And Other Soft Drink Trucks.
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 28" N 81° 55' 48" W
Wiggins Pass 5 Mile School Buses Soft Drink Trucks Confirmed By Rbf Grant Fwcc-01002
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
County: COLLIER
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 26° 17' 29" N 81° 55' 49" W
Wiggins Pass 9 Mile 800 Tons Of Concrete Culverts (Not Located 12/01)
Date of Deployment: May 4 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 800
County: COLLIER
Depth: 42 ft
[1]
Tides & Solunars
42 ft 26° 14' 1" N 82° 7' 44" W