Sarasota County
GPS Coordinates for Fishing

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.

Waypoint Map

Click or tap on a marker to see more information about that waypoint.
Coordinate Display Format: DMS | DM | DD
Waypoint Name Description Depth Latitude Longitude
Alan Fisher Concrete Rubble Boxes And Piles
Date of Deployment: September 16 1980
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 31 ft

Relief: 2 ft [1]
Tides & Solunars
31 ft 27° 18' 5" N 82° 37' 10" W
Bob Johnson Ten Steel Boxcars-Two Stacks Of Five.
Date of Deployment: May 11 1988
Primary Material: BOXCARS STEEL
Tonnage: 275
County: SARASOTA
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 27° 16' 8" N 82° 48' 7" W
Channel Marker Reefs (Bay) Last Seven Of 15 Channel Markers Number For Marker #18
Date of Deployment: September 29 1997
Primary Material: MODULES CONCRETE REEFBALLS(7)
County: SARASOTA
Depth: 10 ft

Relief: 2 ft [1]
Tides & Solunars
10 ft 27° 19' 55" N 82° 34' 21" W
Coker (#8) (Bay) Cinder Blocks In Sarasota Bay.
Date of Deployment: June 25 1987
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 9 ft

Relief: 2 ft [1]
Tides & Solunars
9 ft 27° 18' 42" N 82° 32' 32" W
County M-13 Site Concrete Culverts Second Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: SARASOTA
Depth: 43 ft

Relief: 3 ft [1]
Tides & Solunars
43 ft 26° 55' 0" N 82° 28' 0" W
County M-13 Site Concrete Culverts Fifth Of 5 Drops 2 Loads 2 Drops This Date
Date of Deployment: June 28 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 232
County: SARASOTA
Depth: 43 ft

Relief: 3 ft [1]
Tides & Solunars
43 ft 26° 55' 1" N 82° 27' 58" W
County M-13 Site Concrete Culverts Third Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 150
County: SARASOTA
Depth: 42 ft

Relief: 2 ft [1]
Tides & Solunars
42 ft 26° 55' 7" N 82° 27' 54" W
County M-13 Site Concrete Culverts Fourth Of 5 Drops 2 Loads 2 Drops This Date
Date of Deployment: June 28 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: SARASOTA
Depth: 42 ft

Relief: 4 ft [1]
Tides & Solunars
42 ft 26° 55' 8" N 82° 27' 54" W
County M-13 Site Concrete Culverts First Of 5 Drops 2 Loads 3 Drops This Date
Date of Deployment: June 26 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: SARASOTA
Depth: 42 ft

Relief: 2 ft [1]
Tides & Solunars
42 ft 26° 55' 8" N 82° 27' 54" W
D-3 Five Boxcars All Collapsed Average Height 4’
Date of Deployment: May 11 1988
Primary Material: BOXCARS STEEL
Tonnage: 275
County: SARASOTA
Depth: 105 ft

Relief: 4 ft [1]
Tides & Solunars
105 ft 27° 15' 57" N 83° 7' 12" W
D-3 Five Boxcars 2 End Wall Standing 14’ Tall Average Height 4’
Date of Deployment: May 11 1988
Primary Material: BOXCARS STEEL
Tonnage: 275
County: SARASOTA
Depth: 105 ft

Relief: 14 ft [1]
Tides & Solunars
105 ft 27° 15' 57" N 83° 7' 16" W
D-4 Five Boxcars Most Walls Standing - Good Vertical Relief
Date of Deployment: May 11 1988
Primary Material: BOXCARS STEEL
Tonnage: 275
County: SARASOTA
Depth: 105 ft

Relief: 15 ft [1]
Tides & Solunars
105 ft 27° 15' 28" N 83° 7' 7" W
D-4 Five Boxcars All Collapsed
Date of Deployment: May 11 1988
Primary Material: BOXCARS STEEL
Tonnage: 275
County: SARASOTA
Depth: 105 ft

Relief: 4 ft [1]
Tides & Solunars
105 ft 27° 15' 29" N 83° 7' 9" W
D-6 Only 17 Molds Seen Most Upside Down 17 - 22 Feet Long
Date of Deployment: February 8 1990
Primary Material: BOAT MOLDS STEEL
County: SARASOTA
Depth: 110 ft

Relief: 4 ft [1]
Tides & Solunars
110 ft 27° 6' 11" N 83° 3' 12" W
D-9 Rightside Up Barge With 600 Lb. Jewfish And 9 Other Jewfish
Date of Deployment:
Primary Material: BARGE STEEL
County: SARASOTA
Depth: 105 ft

Relief: 10 ft [1]
Tides & Solunars
105 ft 26° 54' 43" N 82° 55' 54" W
Donald Roeher-Lido Key Reef Concrete Rubble
Date of Deployment: June 21 1981
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 23 ft

Relief: 3 ft [1]
Tides & Solunars
23 ft 27° 18' 12" N 82° 35' 31" W
Donald Roeher-Lido Key Reef Concrete Rubble
Date of Deployment: June 21 1981
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 23 ft

Relief: 3 ft [1]
Tides & Solunars
23 ft 27° 18' 13" N 82° 35' 33" W
Evans (#6) (Bay) 392 Cubic Yards Of Concrete Block.
Date of Deployment: March 12 1991
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft

Relief: 2 ft [1]
Tides & Solunars
10 ft 27° 19' 43" N 82° 33' 28" W
Evans (#6) (Bay) 392 Cubic Yards Of Concrete Block.
Date of Deployment: March 12 1991
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft

Relief: 2 ft [1]
Tides & Solunars
10 ft 27° 19' 43" N 82° 33' 28" W
Gerkin (Bay) 9 Concrete Bay Balls At New Bay Site
Date of Deployment: July 30 1999
Primary Material: MODULES CONCRETE REEFBALLS (9)
Tonnage: 3
County: SARASOTA
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 27° 20' 26" N 82° 33' 17" W
Hart #2 (Bay) 75 Bay Balls In Bay Site The Hart (50 Others In 9/96)
Date of Deployment: September 24 1997
Primary Material: MODULES CONCRETE REEFBALLS(75)
County: SARASOTA
Depth: 12 ft

Relief: 2 ft [1]
Tides & Solunars
12 ft 27° 22' 5" N 82° 34' 29" W
Hart (#2) (Bay) 440 Cubic Yards Of Concrete Block.
Date of Deployment: March 7 1991
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft
[1]
Tides & Solunars
10 ft 27° 22' 1" N 82° 34' 34" W
Hart (#2) (Bay) Cinder Blocks In Sarasota Bay.
Date of Deployment: June 25 1987
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft
[1]
Tides & Solunars
10 ft 27° 22' 1" N 82° 34' 34" W
Hart (#2) (Bay) Broken Concrete Block Reef-Located Inside Sarasota Bay.
Date of Deployment: April 8 1993
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft
[1]
Tides & Solunars
10 ft 27° 22' 1" N 82° 34' 34" W
Hart (#2) (Bay) 750 Cubic Yards Of Concrete Block.
Date of Deployment: February 27 1992
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft
[1]
Tides & Solunars
10 ft 27° 22' 1" N 82° 34' 34" W
Hart (#2) (Bay) 820 Cubic Yards Of Concrete Block.
Date of Deployment: May 12 1989
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft

Relief: 2 ft [1]
Tides & Solunars
10 ft 27° 22' 7" N 82° 34' 30" W
I-1 Lynn Silvertooth Concrete Rubble 10Th Of 10 Loads This Grant
Date of Deployment: June 23 1981
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 30 ft

Relief: 2 ft [1]
Tides & Solunars
30 ft 27° 17' 1" N 82° 36' 0" W
I-1 Lynn Silvertooth Concrete Rubble First Of 10 Loads This Grant
Date of Deployment: May 12 1980
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 30 ft

Relief: 2 ft [1]
Tides & Solunars
30 ft 27° 17' 11" N 82° 35' 54" W
I-1 Lynn Silvertooth 22 Pieces Of Concrete Deck Slabs
Date of Deployment: September 13 2005
Primary Material: CONCRETE DECK SLABS (22)
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 12" N 82° 35' 51" W
I-1 Lynn Silvertooth - #10 8Th Deployment Of Ringling Bridge
Date of Deployment: October 24 2003
Primary Material: BRIDGE PILINGS (40)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 35' 60" W
I-1 Lynn Silvertooth - #11 9Th Deployment Of Ringling Bridge
Date of Deployment: October 25 2003
Primary Material: BRIDGE DECKING WITH RAILS (5)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 35' 57" W
I-1 Lynn Silvertooth - #12 10Th Deployment Of Ringling Bridge
Date of Deployment: October 29 2003
Primary Material: BRIDGE DECKING WITH RAILS (6)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 35' 55" W
I-1 Lynn Silvertooth - #13 11Th Deployment Of Ringling Bridge (2Nd This Date)
Date of Deployment: October 29 2003
Primary Material: BRIDGE PILINGS (26)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 35' 53" W
I-1 Lynn Silvertooth - #14 12Th Deployment Of Ringling Bridge
Date of Deployment: October 30 2003
Primary Material: BRIDGE DECKING WITH RAILS (5)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 35' 51" W
I-1 Lynn Silvertooth - #15 14Th Deployment Of Ringling Bridge
Date of Deployment: November 1 2003
Primary Material: BRIDGE DECKING WITH RAILS (5)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 11" N 82° 36' 4" W
I-1 Lynn Silvertooth - #16 15Th Deployment Of Ringling Bridge (2Nd This Date)
Date of Deployment: November 1 2003
Primary Material: BRIDGE PILINGS (34)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 11" N 82° 36' 2" W
I-1 Lynn Silvertooth - #17 17Th Deployment Of Ringling Bridge
Date of Deployment: November 4 2003
Primary Material: BRIDGE DECKING WITH RAILS (7)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 11" N 82° 35' 60" W
I-1 Lynn Silvertooth - #18 18Th Deployment Of Ringling Bridge
Date of Deployment: November 5 2003
Primary Material: BRIDGE PILINGS (22)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 11" N 82° 35' 57" W
I-1 Lynn Silvertooth - #25 18 Eternal Reef Balls
Date of Deployment: October 27 2004
Primary Material: MODULES CONCRETE REEFBALLS(18)
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 57" W
I-1 Lynn Silvertooth - #27 Concrete Pilings(14X14X15’) And Caps (3’X2.6’X20’)
Date of Deployment: September 29 2004
Primary Material: CONCRETE PILINGS (63)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 53" W
I-1 Lynn Silvertooth - #28 12-30’X2’x12’-Decks 8-4’X25’ Piers And Rubble
Date of Deployment: May 4 2005
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 51" W
I-1 Lynn Silvertooth - #3 First Deployment Of Ringling Bridge
Date of Deployment: October 13 2003
Primary Material: BRIDGE DECKING WITH RAILS (5)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 35' 60" W
I-1 Lynn Silvertooth - #39 - 2 11 Drops Same Number December-234589910131516-2003 Total O
Date of Deployment: December 16 2003
Primary Material: BASCULE PIER RUBBLE
Tonnage: 7930
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 5" N 82° 35' 57" W
I-1 Lynn Silvertooth - #39 -1
Date of Deployment: June 2 2004
Primary Material: CONCRETE PILINGS (40)
County: SARASOTA
Depth: 30 ft

Relief: 10 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 53" W
I-1 Lynn Silvertooth - #4 2Nd Deployment Of Ringling Bridge
Date of Deployment: October 16 2003
Primary Material: BRIDGE PILINGS (24)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 35' 57" W
I-1 Lynn Silvertooth - #6 5Th Deployment Of Ringling Bridge (2Nd This Date)
Date of Deployment: October 18 2003
Primary Material: BRIDGE PILINGS (20)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 35' 53" W
I-1 Lynn Silvertooth - #7 4Th Deployment Of Ringling Bridge
Date of Deployment: October 18 2003
Primary Material: BRIDGE DECKING WITH RAILS (4)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 35' 51" W
I-1 Lynn Silvertooth - #8 6Th Deployment Of Ringling Bridge
Date of Deployment: October 20 2003
Primary Material: BRIDGE DECKING WITH RAILS (5)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 36' 4" W
I-1 Lynn Silvertooth - #9 7Th Deployment Of Ringling Bridge
Date of Deployment: October 22 2003
Primary Material: BRIDGE DECKING WITH RAILS (4)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 36' 2" W
I-1 Lynn Silvertooth - 29-06 Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 1 Of 6 Thi
Date of Deployment: June 5 2006
Primary Material: MODULES CONCRETE REEFBALLS (50)
County: SARASOTA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 27° 17' 7" N 82° 36' 4" W
I-1 Lynn Silvertooth - 30-06 Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 2 Of 6 Thi
Date of Deployment: June 5 2006
Primary Material: MODULES CONCRETE REEFBALLS (50)
County: SARASOTA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 27° 17' 7" N 82° 36' 2" W
I-1 Lynn Silvertooth - 31-06 Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 3 Of 6 Thi
Date of Deployment: June 5 2006
Primary Material: MODULES CONCRETE REEFBALLS (50)
County: SARASOTA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 27° 17' 7" N 82° 35' 60" W
I-1 Lynn Silvertooth - 32-06 Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 4 Of 6 Thi
Date of Deployment: June 5 2006
Primary Material: MODULES CONCRETE REEFBALLS (50)
County: SARASOTA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 27° 17' 7" N 82° 35' 60" W
I-1 Lynn Silvertooth - 36-06 Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 5 Of 6 Thi
Date of Deployment: June 5 2006
Primary Material: MODULES CONCRETE REEFBALLS (50)
County: SARASOTA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 27° 17' 5" N 82° 36' 4" W
I-1 Lynn Silvertooth - 38-06 Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 6 Of 6 Thi
Date of Deployment: June 5 2006
Primary Material: MODULES CONCRETE REEFBALLS (50)
County: SARASOTA
Depth: 25 ft

Relief: 5 ft [1]
Tides & Solunars
25 ft 27° 17' 5" N 82° 35' 60" W
I-1 Lynn Silvertooth - Bridge #1 First Deployment Of Ringling Bridge
Date of Deployment: September 23 2003
Primary Material: BRIDGE RUBBLE-STRESSING BLOCKS (120
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 57" W
I-1 Lynn Silvertooth - Bridge #3 3Nd Deployment Of Ringling Bridge (2Nd This Date)
Date of Deployment: October 16 2003
Primary Material: BRIDGE DECKING (6)
County: SARASOTA
Depth: 30 ft

Relief: 15 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 35' 55" W
I-1 Lynn Silvertooth - Er-1-07 7 Enternal Reefballs
Date of Deployment: January 15 2007
Primary Material: MODULES CONCRETE REEFBALLS (7)
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 10" N 82° 35' 57" W
I-1 Lynn Silvertooth - Eri-06 Reefballs_1-Ultra Ball 2 Pallet Ball And 7 Bay Balls
Date of Deployment: February 27 2006
Primary Material: MODULES CONCRETE REEFBALLS (10)
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 57" W
I-1 Lynn Silvertooth - Eri-06 8 Enternal Reefballs
Date of Deployment: August 8 2006
Primary Material: MODULES CONCRETE REEFBALLS (8)
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 57" W
I-1 Lynn Silvertooth - Eternal1-05 6 Bay Ball And 2 Pallet Ball-Enternal Reefs Donation
Date of Deployment: June 6 2005
Primary Material: MODULES CONCRETE REEFBALLS(8)
County: SARASOTA
Depth: 30 ft

Relief: 3 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 57" W
I-1 Lynn Silvertooth - Mji-06 Concrete Decking Piles Slabs And Rubble
Date of Deployment: February 28 2006
Primary Material: CONCRETE RUBBLE
Tonnage: 400
County: SARASOTA
Depth: 30 ft

Relief: 7 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 35' 53" W
I-1 Lynn Silvertooth - Rb-Parrot He 30 Bay Balls-Private-County Funded
Date of Deployment: June 17 2005
Primary Material: MODULES CONCRETE REEFBALLS (30)
Tonnage: 11.25
County: SARASOTA
Depth: 30 ft

Relief: 3 ft [1]
Tides & Solunars
30 ft 27° 17' 4" N 82° 35' 52" W
I-1 Lynn Silvertooth - Reefball #1 48 Bay Ball And 6 Pallet Ball-County Funded
Date of Deployment: June 17 2005
Primary Material: MODULES CONCRETE REEFBALLS (54)
Tonnage: 24.6
County: SARASOTA
Depth: 30 ft

Relief: 3 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 36' 2" W
I-1 Lynn Silvertooth - Reefball #2 48 Bay Ball And 6 Pallet Ball-County Funded
Date of Deployment: June 17 2005
Primary Material: MODULES CONCRETE REEFBALLS (54)
Tonnage: 24.6
County: SARASOTA
Depth: 30 ft

Relief: 3 ft [1]
Tides & Solunars
30 ft 27° 17' 13" N 82° 36' 4" W
I-1 Lynn Silvertooth - Reefball #3 48 Bay Ball And 6 Pallet Ball-County Funded
Date of Deployment: June 17 2005
Primary Material: MODULES CONCRETE REEFBALLS (54)
Tonnage: 24.6
County: SARASOTA
Depth: 30 ft

Relief: 3 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 36' 60" W
I-1 Lynn Silvertooth - Reefball #4 48 Bay Ball And 6 Pallet Ball-County Funded
Date of Deployment: June 17 2005
Primary Material: MODULES CONCRETE REEFBALLS (54)
Tonnage: 24.6
County: SARASOTA
Depth: 30 ft

Relief: 3 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 36' 2" W
I-1 Lynn Silvertooth - Reefball #5 48 Bay Ball And 6 Pallet Ball-County Funded
Date of Deployment: June 17 2005
Primary Material: MODULES CONCRETE REEFBALLS (54)
Tonnage: 24.6
County: SARASOTA
Depth: 30 ft

Relief: 3 ft [1]
Tides & Solunars
30 ft 27° 17' 15" N 82° 36' 4" W
I-1 Lynn Silvertooth - Reefball #6 18 Reefballs Floating Deployment
Date of Deployment: March 29 2004
Primary Material: MODULES CONCRETE REEFBALLS(18)
County: SARASOTA
Depth: 30 ft

Relief: 5 ft [1]
Tides & Solunars
30 ft 27° 17' 9" N 82° 35' 57" W
Jantzen Reef - #1 353 Cubic Yards Of Concrete Block.
Date of Deployment: May 22 1989
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 14 ft
[1]
Tides & Solunars
14 ft 27° 19' 35" N 82° 33' 56" W
Jantzen Reef - #2 388 Cubic Yards Of Concrete Block.
Date of Deployment: March 27 1991
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft
[1]
Tides & Solunars
10 ft 27° 19' 35" N 82° 33' 56" W
Jantzen Reef - #3 120 Cubic Yards Of Concrete Block.
Date of Deployment: January 31 1992
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 10 ft

Relief: 2 ft [1]
Tides & Solunars
10 ft 27° 19' 47" N 82° 33' 50" W
Jantzen Reef - #4 Clustered Around Piling Marking Site 70 Bay Balls In Bay Site The Jan
Date of Deployment: September 26 1997
Primary Material: MODULES CONCRETE REEFBALLS(70)
County: SARASOTA
Depth: 10 ft

Relief: 2 ft [1]
Tides & Solunars
10 ft 27° 19' 43" N 82° 33' 51" W
Lido Channel Markers (Bay) 1 1St Of 15 Channel Markers With 1 Reef Ball At Base (#1-Green)
Date of Deployment: November 18 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
County: SARASOTA
Depth: 11 ft

Relief: 3 ft [1]
Tides & Solunars
11 ft 27° 18' 19" N 82° 33' 55" W
Lido Channel Markers (Bay) 15 4Th Of 15 Channel Markers With 1 Reef Ball At Base (#18-Red)
Date of Deployment: November 21 1996
Primary Material: MODULES CONCRETE REEFBALLS
County: SARASOTA
Depth: 6 ft

Relief: 3 ft [1]
Tides & Solunars
6 ft 27° 19' 48" N 82° 34' 26" W
M-1 110’ X 30’ X 7’ Derelict Barge With Scattered Culverts No Boats Obser
Date of Deployment: June 30 1987
Primary Material: BARGE STEEL
County: SARASOTA
Depth: 40 ft

Relief: 8 ft [1]
Tides & Solunars
40 ft 27° 19' 11" N 82° 43' 13" W
M-1 Nice Pile Of Culverts
Date of Deployment: May 27 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 733
County: SARASOTA
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 27° 19' 11" N 82° 43' 12" W
M-10 Upside Down Barge
Date of Deployment:
Primary Material: BARGE STEEL
County: SARASOTA
Depth: 70 ft

Relief: 9 ft [1]
Tides & Solunars
70 ft 27° 1' 57" N 82° 42' 32" W
M-11 Reef Balls 58 Pallet Balls 54 Bay Balls And 1 Reef Ball
Date of Deployment: August 10 2001
Primary Material: MODULES CONCRETE REEFBALLS (113)
County: SARASOTA
Depth: 72 ft

Relief: 4 ft [1]
Tides & Solunars
72 ft 26° 59' 2" N 82° 42' 51" W
M-11 Reef Balls 55 Pallet Balls And 49 Bay Balls
Date of Deployment: August 11 2001
Primary Material: MODULES CONCRETE REEFBALLS (104)
County: SARASOTA
Depth: 69 ft

Relief: 3 ft [1]
Tides & Solunars
69 ft 26° 59' 3" N 82° 42' 49" W
M-14 550 Tons Of Concrete Culverts And Concrete Boxes.
Date of Deployment:
Primary Material: CONCRETE CULVERTS
County: SARASOTA
Depth: 43 ft

Relief: 5 ft [1]
Tides & Solunars
43 ft 26° 52' 14" N 82° 26' 26" W
M-14 550 Tons Of Concrete Culverts And Concrete Boxes.
Date of Deployment: May 1 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 550
County: CHARLOTTE
Depth: 45 ft

Relief: 8 ft [1]
Tides & Solunars
45 ft 26° 52' 16" N 82° 26' 26" W
M-15 Concrete Culverts-Mixer Drums-And Steel Drying Racks.
Date of Deployment: October 1 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 1100
County: SARASOTA
Depth: 43 ft

Relief: 8 ft [1]
Tides & Solunars
43 ft 27° 4' 60" N 82° 32' 35" W
M-15 Concrete Culverts And Rubble No Other Material Seen In This Permit
Date of Deployment: October 1 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 1100
County: SARASOTA
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 27° 5' 0" N 82° 32' 34" W
M-16 Concrete Culverts Basins And Steel Beams
Date of Deployment: June 11 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 785
County: SARASOTA
Depth: 48 ft

Relief: 6 ft [1]
Tides & Solunars
48 ft 27° 3' 49" N 82° 35' 39" W
M-17 60 Reef Balls - 3Rd Deployment Of 3 Loads
Date of Deployment: November 30 1995
Primary Material: MODULES CONCRETE REEFBALLS(60)
County: SARASOTA
Depth: 60 ft

Relief: 4 ft [1]
Tides & Solunars
60 ft 27° 2' 28" N 82° 38' 49" W
M-17 60 Reef Balls - 2Nd Deployment Of 3 Loads (180 Total)
Date of Deployment: November 29 1995
Primary Material: MODULES CONCRETE REEFBALLS(60)
County: SARASOTA
Depth: 60 ft

Relief: 4 ft [1]
Tides & Solunars
60 ft 27° 2' 34" N 82° 38' 48" W
M-17 60 Reef Balls - First Deployment Of 3
Date of Deployment: November 28 1995
Primary Material: MODULES CONCRETE REEFBALLS(60)
County: SARASOTA
Depth: 60 ft

Relief: 4 ft [1]
Tides & Solunars
60 ft 27° 2' 40" N 82° 38' 48" W
M-2 Non-Grant Project Concrete Culverts
Date of Deployment: August 6 1990
Primary Material: CONCRETE CULVERTS
County: SARASOTA
Depth: 41 ft

Relief: 4 ft [1]
Tides & Solunars
41 ft 27° 18' 45" N 82° 42' 60" W
M-3 Non-Grant Project Concrete Culverts And Boxes
Date of Deployment:
Primary Material: CONCRETE CULVERTS
County: SARASOTA
Depth: 43 ft

Relief: 4 ft [1]
Tides & Solunars
43 ft 27° 16' 43" N 82° 43' 15" W
M-3 Non-Grant Project Concrete Culverts And Boxes
Date of Deployment:
Primary Material: CONCRETE CULVERTS
County: SARASOTA
Depth: 43 ft

Relief: 4 ft [1]
Tides & Solunars
43 ft 27° 16' 43" N 82° 43' 9" W
M-4 Concrete Rubble And Culverts
Date of Deployment: November 14 1991
Primary Material: CONCRETE RUBBLE
Tonnage: 470
County: SARASOTA
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 27° 15' 9" N 82° 43' 9" W
M-4 Site First Of Two Deployments East Side 108 Pallet And 104 Bay Balls
Date of Deployment: June 24 1998
Primary Material: MODULES CONCRETE REEFBALLS (106)
Tonnage: 65
County: SARASOTA
Depth: 42 ft

Relief: 3 ft [1]
Tides & Solunars
42 ft 27° 15' 9" N 82° 43' 11" W
M-4 Site Second Of Two Deployments West Side Continuous From East Side
Date of Deployment: June 24 1998
Primary Material: MODULES CONCRETE REEFBALLS (106)
Tonnage: 65
County: SARASOTA
Depth: 43 ft

Relief: 3 ft [1]
Tides & Solunars
43 ft 27° 15' 10" N 82° 43' 11" W
M-5 Large Pile Of 12-36 Oval And Round Culverts Nested Inside Each Other
Date of Deployment: December 16 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 600
County: SARASOTA
Depth: 40 ft

Relief: 8 ft [1]
Tides & Solunars
40 ft 27° 13' 26" N 82° 43' 8" W
M-6 Large Pile Of Culverts 80 Feet In Diameter
Date of Deployment: July 6 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 1222
County: SARASOTA
Depth: 52 ft

Relief: 5 ft [1]
Tides & Solunars
52 ft 27° 11' 17" N 82° 43' 35" W
M-7 All 10 In A Group Only 1 End Wall Still Standing Lots Of Ledge Habit
Date of Deployment:
Primary Material: BOXCARS STEEL (10)
County: SARASOTA
Depth: 48 ft

Relief: 6 ft [1]
Tides & Solunars
48 ft 27° 15' 15" N 82° 48' 1" W
M-7 M-7 Renourishment Project Between Existing Boxcars
Date of Deployment: June 19 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: SARASOTA
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 16' 17" N 82° 48' 3" W
M-7 Site Second Load Of Culverts To M-7 Site
Date of Deployment: June 21 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: SARASOTA
Depth: 50 ft
[1]
Tides & Solunars
50 ft 27° 16' 17" N 82° 48' 3" W
M-8 Ten Steel Boxcars-Two Stacks Of Five All Collapsed
Date of Deployment: May 11 1988
Primary Material: BOXCARS STEEL
Tonnage: 275
County: SARASOTA
Depth: 63 ft

Relief: 5 ft [1]
Tides & Solunars
63 ft 27° 12' 30" N 82° 48' 6" W
M-8 Steel Landing Craft.
Date of Deployment: December 10 1985
Primary Material: SHIP STEEL LANDING
County: SARASOTA
Depth: 63 ft

Relief: 10 ft [1]
Tides & Solunars
63 ft 27° 12' 31" N 82° 48' 7" W
M-8 Site Reefex #10 Sarasota Tank #10-Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 63 ft

Relief: 12 ft [1]
Tides & Solunars
63 ft 27° 12' 41" N 82° 48' 11" W
M-8 Site Reefex #6 Sarasota Tank #6 -Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 63 ft

Relief: 12 ft [1]
Tides & Solunars
63 ft 27° 12' 39" N 82° 48' 10" W
M-8 Site Reefex #7 Sarasota Tank #7 -Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 63 ft

Relief: 12 ft [1]
Tides & Solunars
63 ft 27° 12' 38" N 82° 48' 12" W
M-8 Site Reefex #8 Sarasota Tank #8 -Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 60 ft

Relief: 12 ft [1]
Tides & Solunars
60 ft 27° 12' 38" N 82° 48' 12" W
M-8 Site Reefex #9 Sarasota Tank #9 -Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 63 ft

Relief: 12 ft [1]
Tides & Solunars
63 ft 27° 12' 36" N 82° 48' 12" W
M-9 Culverts Rubble And Limestone Boulders
Date of Deployment: July 12 1991
Primary Material: CONCRETE RUBBLE
Tonnage: 500
County: SARASOTA
Depth: 63 ft

Relief: 7 ft [1]
Tides & Solunars
63 ft 27° 4' 11" N 82° 42' 6" W
M-9 Site Reefex #1 Sarasota Tank #1-Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 63 ft

Relief: 12 ft [1]
Tides & Solunars
63 ft 27° 4' 21" N 82° 42' 2" W
M-9 Site Reefex #2 Sarasota Tank #2-Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 65 ft

Relief: 12 ft [1]
Tides & Solunars
65 ft 27° 4' 20" N 82° 41' 59" W
M-9 Site Reefex #3 Sarasota Tank #3-Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 63 ft

Relief: 12 ft [1]
Tides & Solunars
63 ft 27° 4' 21" N 82° 42' 2" W
M-9 Site Reefex #4 Sarasota Tank #4-Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 64 ft

Relief: 12 ft [1]
Tides & Solunars
64 ft 27° 4' 20" N 82° 42' 2" W
M-9 Site Reefex #5 Sarasota Tank #5-Dgps And Loran
Date of Deployment: April 22 1995
Primary Material: ARMY TANK M-60
Tonnage: 50
County: SARASOTA
Depth: 64 ft

Relief: 12 ft [1]
Tides & Solunars
64 ft 27° 4' 23" N 82° 42' 4" W
Md-1 Concrete Filled Hopper (80’ X 14’) With Shrimp Nets Tangled All Over I
Date of Deployment:
Primary Material: BARGE STEEL HOPPER
County: SARASOTA
Depth: 78 ft

Relief: 10 ft [1]
Tides & Solunars
78 ft 27° 9' 26" N 82° 53' 12" W
Md-1 Barge (Upside Down And 30% Deteriorated) And Concrete Rubble - 13 Jewf
Date of Deployment:
Primary Material: BARGE STEEL
County: SARASOTA
Depth: 78 ft

Relief: 7 ft [1]
Tides & Solunars
78 ft 27° 9' 41" N 82° 53' 4" W
Miller (#3) (Bay) Concrete Block Placed Along K. Thompson Park Seawall.
Date of Deployment: April 26 1995
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 21 ft

Relief: 3 ft [1]
Tides & Solunars
21 ft 27° 20' 12" N 82° 34' 33" W
Mote Reef (Bay) 40 Bay Balls And 6 Pvc Modules- Mote Design
Date of Deployment: November 13 1999
Primary Material: MODULES CONCRETE REEFBALLS (40)
Tonnage: 8
County: SARASOTA
Depth: 15 ft

Relief: 5 ft [1]
Tides & Solunars
15 ft 27° 20' 25" N 82° 33' 19" W
Mote Reef (Bay) All Reef Ball Modules Clustered Around This Coordinate
Date of Deployment: February 2 2000
Primary Material: PVC MODULES (2)
County: SARASOTA
Depth: 14 ft

Relief: 3 ft [1]
Tides & Solunars
14 ft 27° 20' 25" N 82° 33' 20" W
Mote Reef (Bay) 2 Pvc Modules Each 8’ W X 8’ L X 4’ H
Date of Deployment: March 20 2000
Primary Material: PVC MODULES (2)
County: SARASOTA
Depth: 15 ft

Relief: 4 ft [1]
Tides & Solunars
15 ft 27° 20' 25" N 82° 33' 16" W
Mote Reef (Bay) 6 Pvc Modules Each 10’ L X 10’ W X 4’ H
Date of Deployment: September 3 1999
Primary Material: PVC MODULES (6)
County: SARASOTA
Depth: 15 ft

Relief: 4 ft [1]
Tides & Solunars
15 ft 27° 20' 25" N 82° 33' 16" W
Mote Reef (Bay) All Modules Clustered Around This Coordinate
Date of Deployment: April 6 2000
Primary Material: PVC MODULES (3)
County: SARASOTA
Depth: 15 ft

Relief: 4 ft [1]
Tides & Solunars
15 ft 27° 20' 25" N 82° 33' 16" W
Powers (#7) (Bay) Broken Concrete Block Reef-Located Inside Sarasota Bay.
Date of Deployment: April 7 1993
Primary Material: CONCRETE BLOCKS
County: SARASOTA
Depth: 13 ft

Relief: 2 ft [1]
Tides & Solunars
13 ft 27° 18' 52" N 82° 34' 18" W
Saprito Pier (Bay) 150 Concrete Bay Balls Around End Of Pier And Lights
Date of Deployment: September 29 1998
Primary Material: MODULES CONCRETE REEFBALLS (150)
Tonnage: 56
County: SARASOTA
Depth: 10 ft

Relief: 2 ft [1]
Tides & Solunars
10 ft 27° 20' 2" N 82° 33' 22" W
Sportfish Anglers Reef (Bay) 150 Bay Balls Deployed In Bay Around Piling ,7500 Sbnep
Date of Deployment: June 25 1998
Primary Material: MODULES CONCRETE REEFBALLS (150)
Tonnage: 562
County: SARASOTA
Depth: 13 ft

Relief: 2 ft [1]
Tides & Solunars
13 ft 27° 21' 5" N 82° 35' 53" W
Stump Pass 3 Mile Reef Concrete Culverts- 3 Dates Same Numbers
Date of Deployment: May 15 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 176
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 82° 26' 26" W
Stump Pass 3 Mile Reef Concrete Culverts- 3 Dates Same Numbers
Date of Deployment: May 19 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 196
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 82° 26' 26" W
Stump Pass 3 Mile Reef Concrete Culverts- 3 Datessame Numbers
Date of Deployment: May 21 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 175
County: CHARLOTTE
Depth: 42 ft

Relief: 5 ft [1]
Tides & Solunars
42 ft 26° 52' 15" N 82° 26' 26" W
Venice Reef - #1 Old Bridge Materials And Concrete Rubble 4Th Of 9 Loads From 8/15/80
Date of Deployment: October 27 1980
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 28 ft

Relief: 5 ft [1]
Tides & Solunars
28 ft 27° 6' 18" N 82° 28' 55" W
Venice Reef - #2 Old Bridge Materials And Concrete Rubble 10Th Of 10 Loads From 8/15/8
Date of Deployment: July 28 1981
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 27° 6' 17" N 82° 28' 54" W
Venice Reef - #3 Old Bridge Materials And Concrete Rubble 1Rst Of 9 Loads From 8/15/80
Date of Deployment: August 15 1980
Primary Material: CONCRETE RUBBLE
County: SARASOTA
Depth: 28 ft

Relief: 3 ft [1]
Tides & Solunars
28 ft 27° 6' 3" N 82° 27' 60" W
Walker Reef (Bay) - #1 20 Slabs With 7 Bay Balls In Each Slab
Date of Deployment: October 10 1999
Primary Material: MODULES CONCRETE REEFBALLS (140)
County: SARASOTA
Depth: 11 ft

Relief: 2 ft [1]
Tides & Solunars
11 ft 27° 22' 60" N 82° 35' 56" W
Walker Reef (Bay) - #2 5 Modules With 7 Bay Balls Imbedded With Tires Chips
Date of Deployment: October 10 1999
Primary Material: MODULES CONCRETE REEFBALLS (35)
County: SARASOTA
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 27° 22' 41" N 82° 35' 32" W
Walker Reef (Bay) - #3 5 Modules With 7 Bay Balls Imbedded With Tires Chips
Date of Deployment: October 10 1999
Primary Material: MODULES CONCRETE REEFBALLS (35)
County: SARASOTA
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 27° 22' 17" N 82° 35' 30" W
Walker Reef (Bay) - #4 5 Modules With 7 Bay Balls Imbedded With Tires Chips
Date of Deployment: October 10 1999
Primary Material: MODULES CONCRETE REEFBALLS (35)
County: SARASOTA
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 27° 22' 60" N 82° 35' 56" W
Walker Reef (Bay) - #5 5 Modules With 7 Bay Balls Imbedded With Tires Chips
Date of Deployment: October 10 1999
Primary Material: MODULES CONCRETE REEFBALLS (35)
County: SARASOTA
Depth: 12 ft

Relief: 3 ft [1]
Tides & Solunars
12 ft 27° 22' 41" N 82° 36' 1" W
Walker Reef (Bay) - #6 Average Of 300 Bay 25 Lo-Pro And 10 Oyster Balls
Date of Deployment: August 13 2002
Primary Material: MODULES CONCRETE REEFBALLS (235)
Tonnage: 31.5
County: SARASOTA
Depth: 12 ft

Relief: 4 ft [1]
Tides & Solunars
12 ft 27° 22' 30" N 82° 35' 41" W
Walker Reef (Bay) - #7 24 Reefballs12 Bay And 12 Pallet Balls
Date of Deployment: February 1 2000
Primary Material: MODULES CONCRETE REEFBALLS (24)
County: SARASOTA
Depth: 11 ft

Relief: 4 ft [1]
Tides & Solunars
11 ft 27° 22' 22" N 82° 35' 35" W
Walker Reef (Bay) - Nep Site Average Numbers For 13 Groups Total Of 154 Bay Reef Balls
Date of Deployment: July 3 2001
Primary Material: MODULES CONCRETE REEFBALLS (154)
County: SARASOTA
Depth: 12 ft

Relief: 2 ft [1]
Tides & Solunars
12 ft 27° 22' 54" N 82° 35' 53" W
Walker Reef-4H Site (Bay) Average Numbers For 15 Groups Total Of 52 Bay Reef Balls
Date of Deployment: June 19 2001
Primary Material: MODULES CONCRETE REEFBALLS (52)
County: SARASOTA
Depth: 12 ft

Relief: 2 ft [1]
Tides & Solunars
12 ft 27° 22' 53" N 82° 35' 49" W
Walker Reef-Center Site (Bay) Average Numbers For 55 Groups Total Of 230 Bay Reef Balls
Date of Deployment: June 19 2001
Primary Material: MODULES CONCRETE REEFBALLS (230)
County: SARASOTA
Depth: 12 ft

Relief: 2 ft [1]
Tides & Solunars
12 ft 27° 22' 40" N 82° 35' 43" W