Sarasota County
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.Coordinate Display Format: DMS | DM | DD | ||||
---|---|---|---|---|
Waypoint Name | Description | Depth | Latitude | Longitude |
Alan Fisher |
Concrete Rubble Boxes And Piles Date of Deployment: September 16 1980 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 31 ft Relief: 2 ft [1] Tides & Solunars |
31 ft | 27° 18' 5" N | 82° 37' 10" W |
Bob Johnson |
Ten Steel Boxcars-Two Stacks Of Five. Date of Deployment: May 11 1988 Primary Material: BOXCARS STEEL Tonnage: 275 County: SARASOTA Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 27° 16' 8" N | 82° 48' 7" W |
Channel Marker Reefs (Bay) |
Last Seven Of 15 Channel Markers Number For Marker #18 Date of Deployment: September 29 1997 Primary Material: MODULES CONCRETE REEFBALLS(7) County: SARASOTA Depth: 10 ft Relief: 2 ft [1] Tides & Solunars |
10 ft | 27° 19' 55" N | 82° 34' 21" W |
Coker (#8) (Bay) |
Cinder Blocks In Sarasota Bay. Date of Deployment: June 25 1987 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 9 ft Relief: 2 ft [1] Tides & Solunars |
9 ft | 27° 18' 42" N | 82° 32' 32" W |
County M-13 Site |
Concrete Culverts Second Of 5 Drops 2 Loads 3 Drops This Date Date of Deployment: June 26 1997 Primary Material: CONCRETE CULVERTS Tonnage: 150 County: SARASOTA Depth: 43 ft Relief: 3 ft [1] Tides & Solunars |
43 ft | 26° 55' 0" N | 82° 28' 0" W |
County M-13 Site |
Concrete Culverts Fifth Of 5 Drops 2 Loads 2 Drops This Date Date of Deployment: June 28 1997 Primary Material: CONCRETE CULVERTS Tonnage: 232 County: SARASOTA Depth: 43 ft Relief: 3 ft [1] Tides & Solunars |
43 ft | 26° 55' 1" N | 82° 27' 58" W |
County M-13 Site |
Concrete Culverts Third Of 5 Drops 2 Loads 3 Drops This Date Date of Deployment: June 26 1997 Primary Material: CONCRETE CULVERTS Tonnage: 150 County: SARASOTA Depth: 42 ft Relief: 2 ft [1] Tides & Solunars |
42 ft | 26° 55' 7" N | 82° 27' 54" W |
County M-13 Site |
Concrete Culverts Fourth Of 5 Drops 2 Loads 2 Drops This Date Date of Deployment: June 28 1997 Primary Material: CONCRETE CULVERTS Tonnage: 300 County: SARASOTA Depth: 42 ft Relief: 4 ft [1] Tides & Solunars |
42 ft | 26° 55' 8" N | 82° 27' 54" W |
County M-13 Site |
Concrete Culverts First Of 5 Drops 2 Loads 3 Drops This Date Date of Deployment: June 26 1997 Primary Material: CONCRETE CULVERTS Tonnage: 200 County: SARASOTA Depth: 42 ft Relief: 2 ft [1] Tides & Solunars |
42 ft | 26° 55' 8" N | 82° 27' 54" W |
D-3 |
Five Boxcars All Collapsed Average Height 4’ Date of Deployment: May 11 1988 Primary Material: BOXCARS STEEL Tonnage: 275 County: SARASOTA Depth: 105 ft Relief: 4 ft [1] Tides & Solunars |
105 ft | 27° 15' 57" N | 83° 7' 12" W |
D-3 |
Five Boxcars 2 End Wall Standing 14’ Tall Average Height 4’ Date of Deployment: May 11 1988 Primary Material: BOXCARS STEEL Tonnage: 275 County: SARASOTA Depth: 105 ft Relief: 14 ft [1] Tides & Solunars |
105 ft | 27° 15' 57" N | 83° 7' 16" W |
D-4 |
Five Boxcars Most Walls Standing - Good Vertical Relief Date of Deployment: May 11 1988 Primary Material: BOXCARS STEEL Tonnage: 275 County: SARASOTA Depth: 105 ft Relief: 15 ft [1] Tides & Solunars |
105 ft | 27° 15' 28" N | 83° 7' 7" W |
D-4 |
Five Boxcars All Collapsed Date of Deployment: May 11 1988 Primary Material: BOXCARS STEEL Tonnage: 275 County: SARASOTA Depth: 105 ft Relief: 4 ft [1] Tides & Solunars |
105 ft | 27° 15' 29" N | 83° 7' 9" W |
D-6 |
Only 17 Molds Seen Most Upside Down 17 - 22 Feet Long Date of Deployment: February 8 1990 Primary Material: BOAT MOLDS STEEL County: SARASOTA Depth: 110 ft Relief: 4 ft [1] Tides & Solunars |
110 ft | 27° 6' 11" N | 83° 3' 12" W |
D-9 |
Rightside Up Barge With 600 Lb. Jewfish And 9 Other Jewfish Date of Deployment: Primary Material: BARGE STEEL County: SARASOTA Depth: 105 ft Relief: 10 ft [1] Tides & Solunars |
105 ft | 26° 54' 43" N | 82° 55' 54" W |
Donald Roeher-Lido Key Reef |
Concrete Rubble Date of Deployment: June 21 1981 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 23 ft Relief: 3 ft [1] Tides & Solunars |
23 ft | 27° 18' 12" N | 82° 35' 31" W |
Donald Roeher-Lido Key Reef |
Concrete Rubble Date of Deployment: June 21 1981 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 23 ft Relief: 3 ft [1] Tides & Solunars |
23 ft | 27° 18' 13" N | 82° 35' 33" W |
Evans (#6) (Bay) |
392 Cubic Yards Of Concrete Block. Date of Deployment: March 12 1991 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft Relief: 2 ft [1] Tides & Solunars |
10 ft | 27° 19' 43" N | 82° 33' 28" W |
Evans (#6) (Bay) |
392 Cubic Yards Of Concrete Block. Date of Deployment: March 12 1991 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft Relief: 2 ft [1] Tides & Solunars |
10 ft | 27° 19' 43" N | 82° 33' 28" W |
Gerkin (Bay) |
9 Concrete Bay Balls At New Bay Site Date of Deployment: July 30 1999 Primary Material: MODULES CONCRETE REEFBALLS (9) Tonnage: 3 County: SARASOTA Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 27° 20' 26" N | 82° 33' 17" W |
Hart #2 (Bay) |
75 Bay Balls In Bay Site The Hart (50 Others In 9/96) Date of Deployment: September 24 1997 Primary Material: MODULES CONCRETE REEFBALLS(75) County: SARASOTA Depth: 12 ft Relief: 2 ft [1] Tides & Solunars |
12 ft | 27° 22' 5" N | 82° 34' 29" W |
Hart (#2) (Bay) |
440 Cubic Yards Of Concrete Block. Date of Deployment: March 7 1991 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft [1] Tides & Solunars |
10 ft | 27° 22' 1" N | 82° 34' 34" W |
Hart (#2) (Bay) |
Cinder Blocks In Sarasota Bay. Date of Deployment: June 25 1987 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft [1] Tides & Solunars |
10 ft | 27° 22' 1" N | 82° 34' 34" W |
Hart (#2) (Bay) |
Broken Concrete Block Reef-Located Inside Sarasota Bay. Date of Deployment: April 8 1993 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft [1] Tides & Solunars |
10 ft | 27° 22' 1" N | 82° 34' 34" W |
Hart (#2) (Bay) |
750 Cubic Yards Of Concrete Block. Date of Deployment: February 27 1992 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft [1] Tides & Solunars |
10 ft | 27° 22' 1" N | 82° 34' 34" W |
Hart (#2) (Bay) |
820 Cubic Yards Of Concrete Block. Date of Deployment: May 12 1989 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft Relief: 2 ft [1] Tides & Solunars |
10 ft | 27° 22' 7" N | 82° 34' 30" W |
I-1 Lynn Silvertooth |
Concrete Rubble 10Th Of 10 Loads This Grant Date of Deployment: June 23 1981 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 30 ft Relief: 2 ft [1] Tides & Solunars |
30 ft | 27° 17' 1" N | 82° 36' 0" W |
I-1 Lynn Silvertooth |
Concrete Rubble First Of 10 Loads This Grant Date of Deployment: May 12 1980 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 30 ft Relief: 2 ft [1] Tides & Solunars |
30 ft | 27° 17' 11" N | 82° 35' 54" W |
I-1 Lynn Silvertooth |
22 Pieces Of Concrete Deck Slabs Date of Deployment: September 13 2005 Primary Material: CONCRETE DECK SLABS (22) County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 12" N | 82° 35' 51" W |
I-1 Lynn Silvertooth - #10 |
8Th Deployment Of Ringling Bridge Date of Deployment: October 24 2003 Primary Material: BRIDGE PILINGS (40) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 35' 60" W |
I-1 Lynn Silvertooth - #11 |
9Th Deployment Of Ringling Bridge Date of Deployment: October 25 2003 Primary Material: BRIDGE DECKING WITH RAILS (5) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - #12 |
10Th Deployment Of Ringling Bridge Date of Deployment: October 29 2003 Primary Material: BRIDGE DECKING WITH RAILS (6) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 35' 55" W |
I-1 Lynn Silvertooth - #13 |
11Th Deployment Of Ringling Bridge (2Nd This Date) Date of Deployment: October 29 2003 Primary Material: BRIDGE PILINGS (26) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 35' 53" W |
I-1 Lynn Silvertooth - #14 |
12Th Deployment Of Ringling Bridge Date of Deployment: October 30 2003 Primary Material: BRIDGE DECKING WITH RAILS (5) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 35' 51" W |
I-1 Lynn Silvertooth - #15 |
14Th Deployment Of Ringling Bridge Date of Deployment: November 1 2003 Primary Material: BRIDGE DECKING WITH RAILS (5) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 11" N | 82° 36' 4" W |
I-1 Lynn Silvertooth - #16 |
15Th Deployment Of Ringling Bridge (2Nd This Date) Date of Deployment: November 1 2003 Primary Material: BRIDGE PILINGS (34) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 11" N | 82° 36' 2" W |
I-1 Lynn Silvertooth - #17 |
17Th Deployment Of Ringling Bridge Date of Deployment: November 4 2003 Primary Material: BRIDGE DECKING WITH RAILS (7) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 11" N | 82° 35' 60" W |
I-1 Lynn Silvertooth - #18 |
18Th Deployment Of Ringling Bridge Date of Deployment: November 5 2003 Primary Material: BRIDGE PILINGS (22) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 11" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - #25 |
18 Eternal Reef Balls Date of Deployment: October 27 2004 Primary Material: MODULES CONCRETE REEFBALLS(18) County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - #27 |
Concrete Pilings(14X14X15’) And Caps (3’X2.6’X20’) Date of Deployment: September 29 2004 Primary Material: CONCRETE PILINGS (63) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 53" W |
I-1 Lynn Silvertooth - #28 |
12-30’X2’x12’-Decks 8-4’X25’ Piers And Rubble Date of Deployment: May 4 2005 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 51" W |
I-1 Lynn Silvertooth - #3 |
First Deployment Of Ringling Bridge Date of Deployment: October 13 2003 Primary Material: BRIDGE DECKING WITH RAILS (5) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 35' 60" W |
I-1 Lynn Silvertooth - #39 - 2 |
11 Drops Same Number December-234589910131516-2003 Total O Date of Deployment: December 16 2003 Primary Material: BASCULE PIER RUBBLE Tonnage: 7930 County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 5" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - #39 -1 |
Date of Deployment: June 2 2004 Primary Material: CONCRETE PILINGS (40) County: SARASOTA Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 53" W |
I-1 Lynn Silvertooth - #4 |
2Nd Deployment Of Ringling Bridge Date of Deployment: October 16 2003 Primary Material: BRIDGE PILINGS (24) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - #6 |
5Th Deployment Of Ringling Bridge (2Nd This Date) Date of Deployment: October 18 2003 Primary Material: BRIDGE PILINGS (20) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 35' 53" W |
I-1 Lynn Silvertooth - #7 |
4Th Deployment Of Ringling Bridge Date of Deployment: October 18 2003 Primary Material: BRIDGE DECKING WITH RAILS (4) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 35' 51" W |
I-1 Lynn Silvertooth - #8 |
6Th Deployment Of Ringling Bridge Date of Deployment: October 20 2003 Primary Material: BRIDGE DECKING WITH RAILS (5) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 36' 4" W |
I-1 Lynn Silvertooth - #9 |
7Th Deployment Of Ringling Bridge Date of Deployment: October 22 2003 Primary Material: BRIDGE DECKING WITH RAILS (4) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 36' 2" W |
I-1 Lynn Silvertooth - 29-06 |
Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 1 Of 6 Thi Date of Deployment: June 5 2006 Primary Material: MODULES CONCRETE REEFBALLS (50) County: SARASOTA Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 27° 17' 7" N | 82° 36' 4" W |
I-1 Lynn Silvertooth - 30-06 |
Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 2 Of 6 Thi Date of Deployment: June 5 2006 Primary Material: MODULES CONCRETE REEFBALLS (50) County: SARASOTA Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 27° 17' 7" N | 82° 36' 2" W |
I-1 Lynn Silvertooth - 31-06 |
Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 3 Of 6 Thi Date of Deployment: June 5 2006 Primary Material: MODULES CONCRETE REEFBALLS (50) County: SARASOTA Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 27° 17' 7" N | 82° 35' 60" W |
I-1 Lynn Silvertooth - 32-06 |
Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 4 Of 6 Thi Date of Deployment: June 5 2006 Primary Material: MODULES CONCRETE REEFBALLS (50) County: SARASOTA Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 27° 17' 7" N | 82° 35' 60" W |
I-1 Lynn Silvertooth - 36-06 |
Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 5 Of 6 Thi Date of Deployment: June 5 2006 Primary Material: MODULES CONCRETE REEFBALLS (50) County: SARASOTA Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 27° 17' 5" N | 82° 36' 4" W |
I-1 Lynn Silvertooth - 38-06 |
Reefballs_1-Goliath Ball 18 Pallet Balls And 31 Bay Balls 6 Of 6 Thi Date of Deployment: June 5 2006 Primary Material: MODULES CONCRETE REEFBALLS (50) County: SARASOTA Depth: 25 ft Relief: 5 ft [1] Tides & Solunars |
25 ft | 27° 17' 5" N | 82° 35' 60" W |
I-1 Lynn Silvertooth - Bridge #1 |
First Deployment Of Ringling Bridge Date of Deployment: September 23 2003 Primary Material: BRIDGE RUBBLE-STRESSING BLOCKS (120 County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - Bridge #3 |
3Nd Deployment Of Ringling Bridge (2Nd This Date) Date of Deployment: October 16 2003 Primary Material: BRIDGE DECKING (6) County: SARASOTA Depth: 30 ft Relief: 15 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 35' 55" W |
I-1 Lynn Silvertooth - Er-1-07 |
7 Enternal Reefballs Date of Deployment: January 15 2007 Primary Material: MODULES CONCRETE REEFBALLS (7) County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 10" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - Eri-06 |
Reefballs_1-Ultra Ball 2 Pallet Ball And 7 Bay Balls Date of Deployment: February 27 2006 Primary Material: MODULES CONCRETE REEFBALLS (10) County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - Eri-06 |
8 Enternal Reefballs Date of Deployment: August 8 2006 Primary Material: MODULES CONCRETE REEFBALLS (8) County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - Eternal1-05 |
6 Bay Ball And 2 Pallet Ball-Enternal Reefs Donation Date of Deployment: June 6 2005 Primary Material: MODULES CONCRETE REEFBALLS(8) County: SARASOTA Depth: 30 ft Relief: 3 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 57" W |
I-1 Lynn Silvertooth - Mji-06 |
Concrete Decking Piles Slabs And Rubble Date of Deployment: February 28 2006 Primary Material: CONCRETE RUBBLE Tonnage: 400 County: SARASOTA Depth: 30 ft Relief: 7 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 35' 53" W |
I-1 Lynn Silvertooth - Rb-Parrot He |
30 Bay Balls-Private-County Funded Date of Deployment: June 17 2005 Primary Material: MODULES CONCRETE REEFBALLS (30) Tonnage: 11.25 County: SARASOTA Depth: 30 ft Relief: 3 ft [1] Tides & Solunars |
30 ft | 27° 17' 4" N | 82° 35' 52" W |
I-1 Lynn Silvertooth - Reefball #1 |
48 Bay Ball And 6 Pallet Ball-County Funded Date of Deployment: June 17 2005 Primary Material: MODULES CONCRETE REEFBALLS (54) Tonnage: 24.6 County: SARASOTA Depth: 30 ft Relief: 3 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 36' 2" W |
I-1 Lynn Silvertooth - Reefball #2 |
48 Bay Ball And 6 Pallet Ball-County Funded Date of Deployment: June 17 2005 Primary Material: MODULES CONCRETE REEFBALLS (54) Tonnage: 24.6 County: SARASOTA Depth: 30 ft Relief: 3 ft [1] Tides & Solunars |
30 ft | 27° 17' 13" N | 82° 36' 4" W |
I-1 Lynn Silvertooth - Reefball #3 |
48 Bay Ball And 6 Pallet Ball-County Funded Date of Deployment: June 17 2005 Primary Material: MODULES CONCRETE REEFBALLS (54) Tonnage: 24.6 County: SARASOTA Depth: 30 ft Relief: 3 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 36' 60" W |
I-1 Lynn Silvertooth - Reefball #4 |
48 Bay Ball And 6 Pallet Ball-County Funded Date of Deployment: June 17 2005 Primary Material: MODULES CONCRETE REEFBALLS (54) Tonnage: 24.6 County: SARASOTA Depth: 30 ft Relief: 3 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 36' 2" W |
I-1 Lynn Silvertooth - Reefball #5 |
48 Bay Ball And 6 Pallet Ball-County Funded Date of Deployment: June 17 2005 Primary Material: MODULES CONCRETE REEFBALLS (54) Tonnage: 24.6 County: SARASOTA Depth: 30 ft Relief: 3 ft [1] Tides & Solunars |
30 ft | 27° 17' 15" N | 82° 36' 4" W |
I-1 Lynn Silvertooth - Reefball #6 |
18 Reefballs Floating Deployment Date of Deployment: March 29 2004 Primary Material: MODULES CONCRETE REEFBALLS(18) County: SARASOTA Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 27° 17' 9" N | 82° 35' 57" W |
Jantzen Reef - #1 |
353 Cubic Yards Of Concrete Block. Date of Deployment: May 22 1989 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 14 ft [1] Tides & Solunars |
14 ft | 27° 19' 35" N | 82° 33' 56" W |
Jantzen Reef - #2 |
388 Cubic Yards Of Concrete Block. Date of Deployment: March 27 1991 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft [1] Tides & Solunars |
10 ft | 27° 19' 35" N | 82° 33' 56" W |
Jantzen Reef - #3 |
120 Cubic Yards Of Concrete Block. Date of Deployment: January 31 1992 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 10 ft Relief: 2 ft [1] Tides & Solunars |
10 ft | 27° 19' 47" N | 82° 33' 50" W |
Jantzen Reef - #4 |
Clustered Around Piling Marking Site 70 Bay Balls In Bay Site The Jan Date of Deployment: September 26 1997 Primary Material: MODULES CONCRETE REEFBALLS(70) County: SARASOTA Depth: 10 ft Relief: 2 ft [1] Tides & Solunars |
10 ft | 27° 19' 43" N | 82° 33' 51" W |
Lido Channel Markers (Bay) |
1 1St Of 15 Channel Markers With 1 Reef Ball At Base (#1-Green) Date of Deployment: November 18 1996 Primary Material: MODULES CONCRETE REEFBALLS(15) County: SARASOTA Depth: 11 ft Relief: 3 ft [1] Tides & Solunars |
11 ft | 27° 18' 19" N | 82° 33' 55" W |
Lido Channel Markers (Bay) |
15 4Th Of 15 Channel Markers With 1 Reef Ball At Base (#18-Red) Date of Deployment: November 21 1996 Primary Material: MODULES CONCRETE REEFBALLS County: SARASOTA Depth: 6 ft Relief: 3 ft [1] Tides & Solunars |
6 ft | 27° 19' 48" N | 82° 34' 26" W |
M-1 |
110’ X 30’ X 7’ Derelict Barge With Scattered Culverts No Boats Obser Date of Deployment: June 30 1987 Primary Material: BARGE STEEL County: SARASOTA Depth: 40 ft Relief: 8 ft [1] Tides & Solunars |
40 ft | 27° 19' 11" N | 82° 43' 13" W |
M-1 |
Nice Pile Of Culverts Date of Deployment: May 27 1993 Primary Material: CONCRETE CULVERTS Tonnage: 733 County: SARASOTA Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 27° 19' 11" N | 82° 43' 12" W |
M-10 |
Upside Down Barge Date of Deployment: Primary Material: BARGE STEEL County: SARASOTA Depth: 70 ft Relief: 9 ft [1] Tides & Solunars |
70 ft | 27° 1' 57" N | 82° 42' 32" W |
M-11 Reef Balls |
58 Pallet Balls 54 Bay Balls And 1 Reef Ball Date of Deployment: August 10 2001 Primary Material: MODULES CONCRETE REEFBALLS (113) County: SARASOTA Depth: 72 ft Relief: 4 ft [1] Tides & Solunars |
72 ft | 26° 59' 2" N | 82° 42' 51" W |
M-11 Reef Balls |
55 Pallet Balls And 49 Bay Balls Date of Deployment: August 11 2001 Primary Material: MODULES CONCRETE REEFBALLS (104) County: SARASOTA Depth: 69 ft Relief: 3 ft [1] Tides & Solunars |
69 ft | 26° 59' 3" N | 82° 42' 49" W |
M-14 |
550 Tons Of Concrete Culverts And Concrete Boxes. Date of Deployment: Primary Material: CONCRETE CULVERTS County: SARASOTA Depth: 43 ft Relief: 5 ft [1] Tides & Solunars |
43 ft | 26° 52' 14" N | 82° 26' 26" W |
M-14 |
550 Tons Of Concrete Culverts And Concrete Boxes. Date of Deployment: May 1 1992 Primary Material: CONCRETE CULVERTS Tonnage: 550 County: CHARLOTTE Depth: 45 ft Relief: 8 ft [1] Tides & Solunars |
45 ft | 26° 52' 16" N | 82° 26' 26" W |
M-15 |
Concrete Culverts-Mixer Drums-And Steel Drying Racks. Date of Deployment: October 1 1991 Primary Material: CONCRETE CULVERTS Tonnage: 1100 County: SARASOTA Depth: 43 ft Relief: 8 ft [1] Tides & Solunars |
43 ft | 27° 4' 60" N | 82° 32' 35" W |
M-15 |
Concrete Culverts And Rubble No Other Material Seen In This Permit Date of Deployment: October 1 1991 Primary Material: CONCRETE CULVERTS Tonnage: 1100 County: SARASOTA Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 27° 5' 0" N | 82° 32' 34" W |
M-16 |
Concrete Culverts Basins And Steel Beams Date of Deployment: June 11 1994 Primary Material: CONCRETE CULVERTS Tonnage: 785 County: SARASOTA Depth: 48 ft Relief: 6 ft [1] Tides & Solunars |
48 ft | 27° 3' 49" N | 82° 35' 39" W |
M-17 |
60 Reef Balls - 3Rd Deployment Of 3 Loads Date of Deployment: November 30 1995 Primary Material: MODULES CONCRETE REEFBALLS(60) County: SARASOTA Depth: 60 ft Relief: 4 ft [1] Tides & Solunars |
60 ft | 27° 2' 28" N | 82° 38' 49" W |
M-17 |
60 Reef Balls - 2Nd Deployment Of 3 Loads (180 Total) Date of Deployment: November 29 1995 Primary Material: MODULES CONCRETE REEFBALLS(60) County: SARASOTA Depth: 60 ft Relief: 4 ft [1] Tides & Solunars |
60 ft | 27° 2' 34" N | 82° 38' 48" W |
M-17 |
60 Reef Balls - First Deployment Of 3 Date of Deployment: November 28 1995 Primary Material: MODULES CONCRETE REEFBALLS(60) County: SARASOTA Depth: 60 ft Relief: 4 ft [1] Tides & Solunars |
60 ft | 27° 2' 40" N | 82° 38' 48" W |
M-2 |
Non-Grant Project Concrete Culverts Date of Deployment: August 6 1990 Primary Material: CONCRETE CULVERTS County: SARASOTA Depth: 41 ft Relief: 4 ft [1] Tides & Solunars |
41 ft | 27° 18' 45" N | 82° 42' 60" W |
M-3 |
Non-Grant Project Concrete Culverts And Boxes Date of Deployment: Primary Material: CONCRETE CULVERTS County: SARASOTA Depth: 43 ft Relief: 4 ft [1] Tides & Solunars |
43 ft | 27° 16' 43" N | 82° 43' 15" W |
M-3 |
Non-Grant Project Concrete Culverts And Boxes Date of Deployment: Primary Material: CONCRETE CULVERTS County: SARASOTA Depth: 43 ft Relief: 4 ft [1] Tides & Solunars |
43 ft | 27° 16' 43" N | 82° 43' 9" W |
M-4 |
Concrete Rubble And Culverts Date of Deployment: November 14 1991 Primary Material: CONCRETE RUBBLE Tonnage: 470 County: SARASOTA Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 27° 15' 9" N | 82° 43' 9" W |
M-4 Site |
First Of Two Deployments East Side 108 Pallet And 104 Bay Balls Date of Deployment: June 24 1998 Primary Material: MODULES CONCRETE REEFBALLS (106) Tonnage: 65 County: SARASOTA Depth: 42 ft Relief: 3 ft [1] Tides & Solunars |
42 ft | 27° 15' 9" N | 82° 43' 11" W |
M-4 Site |
Second Of Two Deployments West Side Continuous From East Side Date of Deployment: June 24 1998 Primary Material: MODULES CONCRETE REEFBALLS (106) Tonnage: 65 County: SARASOTA Depth: 43 ft Relief: 3 ft [1] Tides & Solunars |
43 ft | 27° 15' 10" N | 82° 43' 11" W |
M-5 |
Large Pile Of 12-36 Oval And Round Culverts Nested Inside Each Other Date of Deployment: December 16 1994 Primary Material: CONCRETE CULVERTS Tonnage: 600 County: SARASOTA Depth: 40 ft Relief: 8 ft [1] Tides & Solunars |
40 ft | 27° 13' 26" N | 82° 43' 8" W |
M-6 |
Large Pile Of Culverts 80 Feet In Diameter Date of Deployment: July 6 1989 Primary Material: CONCRETE CULVERTS Tonnage: 1222 County: SARASOTA Depth: 52 ft Relief: 5 ft [1] Tides & Solunars |
52 ft | 27° 11' 17" N | 82° 43' 35" W |
M-7 |
All 10 In A Group Only 1 End Wall Still Standing Lots Of Ledge Habit Date of Deployment: Primary Material: BOXCARS STEEL (10) County: SARASOTA Depth: 48 ft Relief: 6 ft [1] Tides & Solunars |
48 ft | 27° 15' 15" N | 82° 48' 1" W |
M-7 |
M-7 Renourishment Project Between Existing Boxcars Date of Deployment: June 19 1995 Primary Material: CONCRETE CULVERTS Tonnage: 300 County: SARASOTA Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 16' 17" N | 82° 48' 3" W |
M-7 Site |
Second Load Of Culverts To M-7 Site Date of Deployment: June 21 1995 Primary Material: CONCRETE CULVERTS Tonnage: 300 County: SARASOTA Depth: 50 ft [1] Tides & Solunars |
50 ft | 27° 16' 17" N | 82° 48' 3" W |
M-8 |
Ten Steel Boxcars-Two Stacks Of Five All Collapsed Date of Deployment: May 11 1988 Primary Material: BOXCARS STEEL Tonnage: 275 County: SARASOTA Depth: 63 ft Relief: 5 ft [1] Tides & Solunars |
63 ft | 27° 12' 30" N | 82° 48' 6" W |
M-8 |
Steel Landing Craft. Date of Deployment: December 10 1985 Primary Material: SHIP STEEL LANDING County: SARASOTA Depth: 63 ft Relief: 10 ft [1] Tides & Solunars |
63 ft | 27° 12' 31" N | 82° 48' 7" W |
M-8 Site Reefex #10 |
Sarasota Tank #10-Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 63 ft Relief: 12 ft [1] Tides & Solunars |
63 ft | 27° 12' 41" N | 82° 48' 11" W |
M-8 Site Reefex #6 |
Sarasota Tank #6 -Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 63 ft Relief: 12 ft [1] Tides & Solunars |
63 ft | 27° 12' 39" N | 82° 48' 10" W |
M-8 Site Reefex #7 |
Sarasota Tank #7 -Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 63 ft Relief: 12 ft [1] Tides & Solunars |
63 ft | 27° 12' 38" N | 82° 48' 12" W |
M-8 Site Reefex #8 |
Sarasota Tank #8 -Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 60 ft Relief: 12 ft [1] Tides & Solunars |
60 ft | 27° 12' 38" N | 82° 48' 12" W |
M-8 Site Reefex #9 |
Sarasota Tank #9 -Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 63 ft Relief: 12 ft [1] Tides & Solunars |
63 ft | 27° 12' 36" N | 82° 48' 12" W |
M-9 |
Culverts Rubble And Limestone Boulders Date of Deployment: July 12 1991 Primary Material: CONCRETE RUBBLE Tonnage: 500 County: SARASOTA Depth: 63 ft Relief: 7 ft [1] Tides & Solunars |
63 ft | 27° 4' 11" N | 82° 42' 6" W |
M-9 Site Reefex #1 |
Sarasota Tank #1-Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 63 ft Relief: 12 ft [1] Tides & Solunars |
63 ft | 27° 4' 21" N | 82° 42' 2" W |
M-9 Site Reefex #2 |
Sarasota Tank #2-Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 65 ft Relief: 12 ft [1] Tides & Solunars |
65 ft | 27° 4' 20" N | 82° 41' 59" W |
M-9 Site Reefex #3 |
Sarasota Tank #3-Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 63 ft Relief: 12 ft [1] Tides & Solunars |
63 ft | 27° 4' 21" N | 82° 42' 2" W |
M-9 Site Reefex #4 |
Sarasota Tank #4-Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 64 ft Relief: 12 ft [1] Tides & Solunars |
64 ft | 27° 4' 20" N | 82° 42' 2" W |
M-9 Site Reefex #5 |
Sarasota Tank #5-Dgps And Loran Date of Deployment: April 22 1995 Primary Material: ARMY TANK M-60 Tonnage: 50 County: SARASOTA Depth: 64 ft Relief: 12 ft [1] Tides & Solunars |
64 ft | 27° 4' 23" N | 82° 42' 4" W |
Md-1 |
Concrete Filled Hopper (80’ X 14’) With Shrimp Nets Tangled All Over I Date of Deployment: Primary Material: BARGE STEEL HOPPER County: SARASOTA Depth: 78 ft Relief: 10 ft [1] Tides & Solunars |
78 ft | 27° 9' 26" N | 82° 53' 12" W |
Md-1 |
Barge (Upside Down And 30% Deteriorated) And Concrete Rubble - 13 Jewf Date of Deployment: Primary Material: BARGE STEEL County: SARASOTA Depth: 78 ft Relief: 7 ft [1] Tides & Solunars |
78 ft | 27° 9' 41" N | 82° 53' 4" W |
Miller (#3) (Bay) |
Concrete Block Placed Along K. Thompson Park Seawall. Date of Deployment: April 26 1995 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 21 ft Relief: 3 ft [1] Tides & Solunars |
21 ft | 27° 20' 12" N | 82° 34' 33" W |
Mote Reef (Bay) |
40 Bay Balls And 6 Pvc Modules- Mote Design Date of Deployment: November 13 1999 Primary Material: MODULES CONCRETE REEFBALLS (40) Tonnage: 8 County: SARASOTA Depth: 15 ft Relief: 5 ft [1] Tides & Solunars |
15 ft | 27° 20' 25" N | 82° 33' 19" W |
Mote Reef (Bay) |
All Reef Ball Modules Clustered Around This Coordinate Date of Deployment: February 2 2000 Primary Material: PVC MODULES (2) County: SARASOTA Depth: 14 ft Relief: 3 ft [1] Tides & Solunars |
14 ft | 27° 20' 25" N | 82° 33' 20" W |
Mote Reef (Bay) |
2 Pvc Modules Each 8’ W X 8’ L X 4’ H Date of Deployment: March 20 2000 Primary Material: PVC MODULES (2) County: SARASOTA Depth: 15 ft Relief: 4 ft [1] Tides & Solunars |
15 ft | 27° 20' 25" N | 82° 33' 16" W |
Mote Reef (Bay) |
6 Pvc Modules Each 10’ L X 10’ W X 4’ H Date of Deployment: September 3 1999 Primary Material: PVC MODULES (6) County: SARASOTA Depth: 15 ft Relief: 4 ft [1] Tides & Solunars |
15 ft | 27° 20' 25" N | 82° 33' 16" W |
Mote Reef (Bay) |
All Modules Clustered Around This Coordinate Date of Deployment: April 6 2000 Primary Material: PVC MODULES (3) County: SARASOTA Depth: 15 ft Relief: 4 ft [1] Tides & Solunars |
15 ft | 27° 20' 25" N | 82° 33' 16" W |
Powers (#7) (Bay) |
Broken Concrete Block Reef-Located Inside Sarasota Bay. Date of Deployment: April 7 1993 Primary Material: CONCRETE BLOCKS County: SARASOTA Depth: 13 ft Relief: 2 ft [1] Tides & Solunars |
13 ft | 27° 18' 52" N | 82° 34' 18" W |
Saprito Pier (Bay) |
150 Concrete Bay Balls Around End Of Pier And Lights Date of Deployment: September 29 1998 Primary Material: MODULES CONCRETE REEFBALLS (150) Tonnage: 56 County: SARASOTA Depth: 10 ft Relief: 2 ft [1] Tides & Solunars |
10 ft | 27° 20' 2" N | 82° 33' 22" W |
Sportfish Anglers Reef (Bay) |
150 Bay Balls Deployed In Bay Around Piling ,7500 Sbnep Date of Deployment: June 25 1998 Primary Material: MODULES CONCRETE REEFBALLS (150) Tonnage: 562 County: SARASOTA Depth: 13 ft Relief: 2 ft [1] Tides & Solunars |
13 ft | 27° 21' 5" N | 82° 35' 53" W |
Stump Pass 3 Mile Reef |
Concrete Culverts- 3 Dates Same Numbers Date of Deployment: May 15 1992 Primary Material: CONCRETE CULVERTS Tonnage: 176 County: CHARLOTTE Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 26° 52' 15" N | 82° 26' 26" W |
Stump Pass 3 Mile Reef |
Concrete Culverts- 3 Dates Same Numbers Date of Deployment: May 19 1992 Primary Material: CONCRETE CULVERTS Tonnage: 196 County: CHARLOTTE Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 26° 52' 15" N | 82° 26' 26" W |
Stump Pass 3 Mile Reef |
Concrete Culverts- 3 Datessame Numbers Date of Deployment: May 21 1992 Primary Material: CONCRETE CULVERTS Tonnage: 175 County: CHARLOTTE Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 26° 52' 15" N | 82° 26' 26" W |
Venice Reef - #1 |
Old Bridge Materials And Concrete Rubble 4Th Of 9 Loads From 8/15/80 Date of Deployment: October 27 1980 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 28 ft Relief: 5 ft [1] Tides & Solunars |
28 ft | 27° 6' 18" N | 82° 28' 55" W |
Venice Reef - #2 |
Old Bridge Materials And Concrete Rubble 10Th Of 10 Loads From 8/15/8 Date of Deployment: July 28 1981 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 28 ft Relief: 3 ft [1] Tides & Solunars |
28 ft | 27° 6' 17" N | 82° 28' 54" W |
Venice Reef - #3 |
Old Bridge Materials And Concrete Rubble 1Rst Of 9 Loads From 8/15/80 Date of Deployment: August 15 1980 Primary Material: CONCRETE RUBBLE County: SARASOTA Depth: 28 ft Relief: 3 ft [1] Tides & Solunars |
28 ft | 27° 6' 3" N | 82° 27' 60" W |
Walker Reef (Bay) - #1 |
20 Slabs With 7 Bay Balls In Each Slab Date of Deployment: October 10 1999 Primary Material: MODULES CONCRETE REEFBALLS (140) County: SARASOTA Depth: 11 ft Relief: 2 ft [1] Tides & Solunars |
11 ft | 27° 22' 60" N | 82° 35' 56" W |
Walker Reef (Bay) - #2 |
5 Modules With 7 Bay Balls Imbedded With Tires Chips Date of Deployment: October 10 1999 Primary Material: MODULES CONCRETE REEFBALLS (35) County: SARASOTA Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 27° 22' 41" N | 82° 35' 32" W |
Walker Reef (Bay) - #3 |
5 Modules With 7 Bay Balls Imbedded With Tires Chips Date of Deployment: October 10 1999 Primary Material: MODULES CONCRETE REEFBALLS (35) County: SARASOTA Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 27° 22' 17" N | 82° 35' 30" W |
Walker Reef (Bay) - #4 |
5 Modules With 7 Bay Balls Imbedded With Tires Chips Date of Deployment: October 10 1999 Primary Material: MODULES CONCRETE REEFBALLS (35) County: SARASOTA Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 27° 22' 60" N | 82° 35' 56" W |
Walker Reef (Bay) - #5 |
5 Modules With 7 Bay Balls Imbedded With Tires Chips Date of Deployment: October 10 1999 Primary Material: MODULES CONCRETE REEFBALLS (35) County: SARASOTA Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 27° 22' 41" N | 82° 36' 1" W |
Walker Reef (Bay) - #6 |
Average Of 300 Bay 25 Lo-Pro And 10 Oyster Balls Date of Deployment: August 13 2002 Primary Material: MODULES CONCRETE REEFBALLS (235) Tonnage: 31.5 County: SARASOTA Depth: 12 ft Relief: 4 ft [1] Tides & Solunars |
12 ft | 27° 22' 30" N | 82° 35' 41" W |
Walker Reef (Bay) - #7 |
24 Reefballs12 Bay And 12 Pallet Balls Date of Deployment: February 1 2000 Primary Material: MODULES CONCRETE REEFBALLS (24) County: SARASOTA Depth: 11 ft Relief: 4 ft [1] Tides & Solunars |
11 ft | 27° 22' 22" N | 82° 35' 35" W |
Walker Reef (Bay) - Nep Site |
Average Numbers For 13 Groups Total Of 154 Bay Reef Balls Date of Deployment: July 3 2001 Primary Material: MODULES CONCRETE REEFBALLS (154) County: SARASOTA Depth: 12 ft Relief: 2 ft [1] Tides & Solunars |
12 ft | 27° 22' 54" N | 82° 35' 53" W |
Walker Reef-4H Site (Bay) |
Average Numbers For 15 Groups Total Of 52 Bay Reef Balls Date of Deployment: June 19 2001 Primary Material: MODULES CONCRETE REEFBALLS (52) County: SARASOTA Depth: 12 ft Relief: 2 ft [1] Tides & Solunars |
12 ft | 27° 22' 53" N | 82° 35' 49" W |
Walker Reef-Center Site (Bay) |
Average Numbers For 55 Groups Total Of 230 Bay Reef Balls Date of Deployment: June 19 2001 Primary Material: MODULES CONCRETE REEFBALLS (230) County: SARASOTA Depth: 12 ft Relief: 2 ft [1] Tides & Solunars |
12 ft | 27° 22' 40" N | 82° 35' 43" W |