Charlote and Lee Counties
GPS Coordinates for Fishing
The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location. Our iPhone/iPad/Mac app now also offers fishing coordinates in recent versions, exclusively with our Premium service. Alternatively, access them for free here on our ad-supported website.
Waypoint Map
Click or tap on a marker to see more information about that waypoint.Coordinate Display Format: DMS | DM | DD | ||||
---|---|---|---|---|
Waypoint Name | Description | Depth | Latitude | Longitude |
Arc '00 Reef |
2 Nd Load Of 2 Loads 75 Pieces Of Concrete And Steel Power Poles Date of Deployment: May 24 2000 Primary Material: CONCRETE PRECAST MATERIALS Tonnage: 476.1 County: LEE Depth: 58 ft Relief: 15 ft [1] Tides & Solunars |
58 ft | 26° 24' 56" N | 82° 24' 49" W |
Arc '00 Reef |
1 1St Load Of 2 Loads 200-300 Pieces Of Concrete And Steel Power Poles Date of Deployment: May 22 2000 Primary Material: CONCRETE PRECAST MATERIALS Tonnage: 761.7 County: LEE Depth: 58 ft Relief: 15 ft [1] Tides & Solunars |
58 ft | 26° 24' 56" N | 82° 24' 49" W |
Arc Barge Site |
24 Sets Of 6 Bundled Pipes And 6 Large 6’X4’x4’ Risers With Fence Enclos Date of Deployment: June 9 1999 Primary Material: CONCRETE CULVERTS (24 SETS) Tonnage: 209 County: LEE Depth: 56 ft Relief: 8 ft [1] Tides & Solunars |
56 ft | 26° 24' 47" N | 82° 24' 50" W |
Arc Reef |
Arc Reef 100 Ft X 40 Ft Barge 1/94Dgps Date of Deployment: January 26 1994 Primary Material: BARGE STEEL County: LEE Depth: 60 ft Relief: 10 ft [1] Tides & Solunars |
60 ft | 26° 24' 54" N | 82° 24' 41" W |
Arc Rubble |
3Rd Of 5 Loads This Grant Concrete Culverts And Boxes Date of Deployment: May 18 2001 Primary Material: CONCRETE PRECAST MATERIALS (110) Tonnage: 425 County: LEE Depth: 58 ft Relief: 10 ft [1] Tides & Solunars |
58 ft | 26° 24' 50" N | 82° 24' 41" W |
Arc Tet |
1 Rst Of 5 Loads This Grant 5 To 6 Foot Solid Tetrahedrons Date of Deployment: May 9 2001 Primary Material: MODULES CONCRETE TETRAHEDRONS (150) Tonnage: 212 County: LEE Depth: 58 ft Relief: 10 ft [1] Tides & Solunars |
58 ft | 26° 24' 52" N | 82° 24' 38" W |
Arc Towers |
Steel Radio Towers Cut Ot 25 Feet 3 Units Date of Deployment: May 30 2002 Primary Material: STEEL TOWERS/RADIO (3) Tonnage: 30 County: LEE Depth: 58 ft Relief: 25 ft [1] Tides & Solunars |
58 ft | 26° 24' 58" N | 82° 24' 38" W |
Arc-Reefballs |
84 Reefballs Of Variuos Sizes Date of Deployment: June 11 2004 Primary Material: MODULES CONCRETE REEFBALLS (84) Tonnage: 108 County: LEE Depth: 57 ft Relief: 5 ft [1] Tides & Solunars |
57 ft | 26° 24' 54" N | 82° 24' 40" W |
Arc-Seaguard |
60 Ft. Long Steel Hulled Sailboat Called The Seaguard Date of Deployment: August 27 2004 Primary Material: SHIP STEEL 60’ County: LEE Depth: 57 ft Relief: 13 ft [1] Tides & Solunars |
57 ft | 26° 24' 58" N | 82° 24' 43" W |
Arcoa Reef |
Second Deployment Due To Structural Failures Date of Deployment: December 20 1994 Primary Material: MODULES PVC CONCRETE County: LEE Depth: 60 ft Relief: 6 ft [1] Tides & Solunars |
60 ft | 26° 32' 25" N | 82° 24' 58" W |
Arcoa Reef |
96 Individual Modules 15000 Square Meters Date of Deployment: December 8 1993 Primary Material: MODULES PVC CONCRETE County: LEE Depth: 60 ft Relief: 6 ft [1] Tides & Solunars |
60 ft | 26° 32' 29" N | 82° 25' 5" W |
Barge #1 Site |
Arcoa Bioreef-Prefabricated Units. Date of Deployment: December 8 1993 Primary Material: MODULES PVC CONCRETE County: LEE Depth: 57 ft Relief: 9 ft [1] Tides & Solunars |
57 ft | 26° 32' 14" N | 82° 25' 7" W |
Belton Johnson Reef - Site 1 |
500 Tons Of Concrete Culverts Date of Deployment: May 16 1996 Primary Material: CONCRETE CULVERTS Tonnage: 500 County: LEE Depth: 30 ft [1] Tides & Solunars |
30 ft | 26° 25' 29" N | 82° 11' 42" W |
Belton Johnson Reef - Site 2 |
20 Pieces Of Concrete Slabs Four Loads This Project Date of Deployment: May 10 1997 Primary Material: CONCRETE SLABS Tonnage: 75 County: LEE Depth: 32 ft Relief: 5 ft [1] Tides & Solunars |
32 ft | 26° 25' 24" N | 82° 11' 47" W |
Belton Johnson Reef - Site 3 |
Pilings Stacked In Lincoln Log Shape-1 1St Of Two Loads Dgps Date of Deployment: May 16 1997 Primary Material: CONCRETE PILINGS 42 Tonnage: 51 County: LEE Depth: 32 ft Relief: 14 ft [1] Tides & Solunars |
32 ft | 26° 25' 19" N | 82° 11' 41" W |
Belton Johnson Reef - Site 4 |
About 25 Pieces Of Concrete Culverts Inpile1rst Of Three Loads Dgps Date of Deployment: May 30 1997 Primary Material: CONCRETE RUBBLE 25 Tonnage: 100 County: LEE Depth: 32 ft Relief: 5 ft [1] Tides & Solunars |
32 ft | 26° 25' 17" N | 82° 11' 48" W |
Belton Johnson Reef - Site 5 |
Pilings Stacked In Lincoln Log Shape-2Nd Of Two Loads Dgps Date of Deployment: June 30 1997 Primary Material: CONCRETE PILINGS 44 Tonnage: 54 County: LEE Depth: 32 ft Relief: 14 ft [1] Tides & Solunars |
32 ft | 26° 25' 21" N | 82° 11' 40" W |
Belton Johnson Reef - Site 6 |
About 30 Pieces Of Flat Concrete In A Pile 2Nd Of Three Loads Dgps Date of Deployment: July 9 1997 Primary Material: CONCRETE SLABS 30 Tonnage: 100 County: LEE Depth: 32 ft Relief: 8 ft [1] Tides & Solunars |
32 ft | 26° 25' 33" N | 82° 11' 49" W |
Belton Johnson Reef - Site 7 |
25 Pieces Of Concrete Slabs Four Loads This Project Date of Deployment: July 16 1997 Primary Material: CONCRETE SLABS Tonnage: 75 County: LEE Depth: 32 ft Relief: 8 ft [1] Tides & Solunars |
32 ft | 26° 25' 27" N | 82° 12' 6" W |
Blanda's Reef |
45’ X 12’ X 8’ Ft. Steel Hulled Sailboat Hull Date of Deployment: July 29 2003 Primary Material: SHIP STEEL SAILBOAT 45’ County: LEE Depth: 45 ft Relief: 8 ft [1] Tides & Solunars |
45 ft | 26° 25' 11" N | 82° 19' 6" W |
Blanda's Reef Bridge |
Concrete Bridge Rubble Up To 25’X3’x3’ Smallest 3’X2’x2’ Date of Deployment: June 8 2005 Primary Material: BRIDGE RUBBLE Tonnage: 373 County: LEE Depth: 44 ft Relief: 12 ft [1] Tides & Solunars |
44 ft | 26° 25' 11" N | 82° 19' 5" W |
Blanda's Reef Rock |
182 Tons Of 2 Ft - 5Ft Boulders In One Stack Date of Deployment: June 24 2005 Primary Material: ROCK-LIMESTONE BOULDERS (200) Tonnage: 182 County: LEE Depth: 44 ft Relief: 5 ft [1] Tides & Solunars |
44 ft | 26° 25' 19" N | 82° 19' 5" W |
Boca Grande Reef |
667 Yards Of Concrete Pilings And Rubble Date of Deployment: July 3 1981 Primary Material: CONCRETE PILINGS County: CHARLOTTE [1] Tides & Solunars |
26° 38' 12" N | 82° 17' 5" W | |
Bokeelia Reef (B) |
400 Cubic Yards Concrete Rubble And Boxes Date of Deployment: December 31 1984 Primary Material: CONCRETE CULVERTS County: LEE Depth: 10 ft Relief: 4 ft [1] Tides & Solunars |
10 ft | 26° 43' 2" N | 82° 9' 39" W |
Boxcar Reef |
Csx Boxcars. Date of Deployment: December 31 1987 Primary Material: BOXCARS County: LEE Depth: 72 ft [1] Tides & Solunars |
72 ft | 26° 41' 50" N | 82° 36' 4" W |
Cape Haze (B) |
Joint Project With Charlotte-,20000 Each Not An Fwc Grant Date of Deployment: May 10 1995 Primary Material: MODULES STEEL UNITS County: LEE Depth: 18 ft Relief: 4 ft [1] Tides & Solunars |
18 ft | 26° 45' 44" N | 82° 9' 28" W |
Cape Haze Reef (Bay) |
Only 5 Culvert Bundles Located No Steel Pipe Units-Not An Fwc Grant Date of Deployment: May 10 1995 Primary Material: STEEL UNITS County: CHARLOTTE Depth: 18 ft Relief: 4 ft [1] Tides & Solunars |
18 ft | 26° 45' 46" N | 82° 9' 27" W |
Cape Haze Reef(B) |
3’ X 4’ And 2’ X 4’ Culverts 125 Pieces Date of Deployment: February 26 2002 Primary Material: CONCRETE CULVERTS (125) County: LEE Depth: 18 ft Relief: 6 ft [1] Tides & Solunars |
18 ft | 26° 45' 46" N | 82° 9' 30" W |
Causeway Reef #1 |
135- 30X30 Up To 15’ Long Concrete Piling Cutoffs 1 Of 6 Drops Date of Deployment: September 16 2005 Primary Material: CONCRETE PILINGS - CUTOFFS (135) Tonnage: 652 County: LEE Depth: 26 ft Relief: 7 ft [1] Tides & Solunars |
26 ft | 26° 22' 57" N | 82° 1' 9" W |
Causeway Reef #2 |
75- 30X30 Up To 15’ Long Concrete Piling Cutoffs 2 Of 6 Drops Date of Deployment: February 14 2006 Primary Material: CONCRETE PILINGS - CUTOFFS (75) Tonnage: 604.5 County: LEE Depth: 26 ft Relief: 7 ft [1] Tides & Solunars |
26 ft | 26° 22' 56" N | 82° 1' 5" W |
Causeway Reef #3 |
80- 30X30 Up To 15’ Long Concrete Piling Cutoffs 3 Of 6 Drops Date of Deployment: February 21 2006 Primary Material: CONCRETE PILINGS - CUTOFFS (70) Tonnage: 423 County: LEE Depth: 26 ft Relief: 7 ft [1] Tides & Solunars |
26 ft | 26° 22' 59" N | 82° 1' 7" W |
Causeway Reef #4 |
80- 30X30 Up To 15’ Long Concrete Piling Cutoffs 4 Of 6 Drops Date of Deployment: March 31 2006 Primary Material: CONCRETE PILINGS - CUTOFFS (80) Tonnage: 490 County: LEE Depth: 26 ft Relief: 7 ft [1] Tides & Solunars |
26 ft | 26° 22' 57" N | 82° 1' 6" W |
Causeway Reef #5 |
70- 30X30 Up To 25’ Long Concrete Piling Cutoffs 5 Of 6 Drops Date of Deployment: May 9 2006 Primary Material: CONCRETE PILINGS - CUTOFFS (70) Tonnage: 266 County: LEE Depth: 26 ft Relief: 7 ft [1] Tides & Solunars |
26 ft | 26° 22' 56" N | 82° 1' 9" W |
Causeway Reef #6 |
75- 30X30 Up To 25’ Long Concrete Piling Cutoffs Date of Deployment: May 23 2006 Primary Material: CONCRETE PILINGS - CUTOFFS (75) Tonnage: 348 County: LEE Depth: 26 ft Relief: 7 ft [1] Tides & Solunars |
26 ft | 26° 22' 58" N | 82° 1' 8" W |
Causeway Reef #7 |
85- 30X30 Up To 25’ Long Concrete Piling Cutoffs 6 Of 6 Drops Date of Deployment: June 9 2006 Primary Material: CONCRETE PILINGS - CUTOFFS (85) Tonnage: 348 County: LEE Depth: 26 ft Relief: 7 ft [1] Tides & Solunars |
26 ft | 26° 22' 56" N | 82° 1' 9" W |
Causeway Reef #8 |
85- 30X30 Up To 25’ Long Concrete Piling Cutoffs Date of Deployment: September 6 2206 Primary Material: CONCRETE PILINGS - CUTOFFS (80) Tonnage: 300 County: LEE Depth: 26 ft Relief: 8 ft [1] Tides & Solunars |
26 ft | 26° 22' 54" N | 82° 1' 8" W |
Causeway Reef #9 |
70- 30X30 Up To 25’ Long Concrete Piling Cutoffs Date of Deployment: September 11 2006 Primary Material: CONCRETE PILINGS - CUTOFFS (70) Tonnage: 200 County: LEE Depth: 26 ft Relief: 6 ft [1] Tides & Solunars |
26 ft | 26° 22' 59" N | 82° 1' 5" W |
Charlie's Reef |
Two Piles Of Hopper Cars-One With 16 Cars-The Other With 24. Date of Deployment: January 25 1994 Primary Material: BOXCARS STEEL/HOPPER County: LEE Depth: 90 ft Relief: 24 ft [1] Tides & Solunars |
90 ft | 26° 33' 22" N | 82° 43' 22" W |
Charlotte Harbor Reef (Bay) |
1100 Tons Of Bridge Rubble Beams Date of Deployment: December 31 1983 Primary Material: BRIDGE CONCRETE Tonnage: 1100 County: CHARLOTTE Depth: 12 ft [1] Tides & Solunars |
12 ft | 26° 50' 30" N | 82° 5' 19" W |
Charlotte Harbor Site (Bay) |
1 Of 18 Deployments To 6/28/97 This Location And Grant (Materials North Date of Deployment: June 15 1987 Primary Material: CONCRETE CULVERTS Tonnage: 1115 County: CHARLOTTE Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 26° 50' 30" N | 82° 5' 19" W |
Charlotte Harbor Site A (Bay) |
18 Pallet And 35 Bay Balls West Row Due South Of These Coordinates Date of Deployment: May 7 1999 Primary Material: MODULES CONCRETE REEFBALLS (53) Tonnage: 21 County: CHARLOTTE Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 26° 50' 59" N | 82° 5' 19" W |
Charlotte Harbor Site A (Bay) |
18 Pallet And 35 Bay Balls West Row Due South Of These Coordinates Date of Deployment: December 2 1999 Primary Material: MODULES CONCRETE REEFBALLS (53) Tonnage: 30 County: CHARLOTTE Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 26° 51' 30" N | 82° 5' 19" W |
Charlotte Harbor Site B (Bay) |
17 Pallet And 35 Bay Balls East Row Due South Of These Coordinates Date of Deployment: May 7 1999 Primary Material: MODULES CONCRETE REEFBALLS (52) Tonnage: 21 County: CHARLOTTE Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 26° 50' 59" N | 82° 5' 18" W |
Charlotte Harbor Site B (Bay) |
17 Pallet And 35 Bay Balls East Row Due South Of These Coordinates Date of Deployment: December 2 1999 Primary Material: MODULES CONCRETE REEFBALLS (52) Tonnage: 30 County: CHARLOTTE Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 26° 51' 30" N | 82° 5' 18" W |
Charlotte Harbour #1 (Bay) |
1 Of 7 Deployments This Location This Grant To 5/9/91 (North Of Co Date of Deployment: March 1 1991 Primary Material: CONCRETE CULVERTS Tonnage: 228 County: CHARLOTTE Depth: 12 ft Relief: 3 ft [1] Tides & Solunars |
12 ft | 26° 50' 39" N | 82° 5' 19" W |
County M-13 Site |
Concrete Culverts Second Of 5 Drops 2 Loads 3 Drops This Date Date of Deployment: June 26 1997 Primary Material: CONCRETE CULVERTS Tonnage: 150 County: SARASOTA Depth: 43 ft Relief: 3 ft [1] Tides & Solunars |
43 ft | 26° 55' 0" N | 82° 28' 0" W |
County M-13 Site |
Concrete Culverts Fifth Of 5 Drops 2 Loads 2 Drops This Date Date of Deployment: June 28 1997 Primary Material: CONCRETE CULVERTS Tonnage: 232 County: SARASOTA Depth: 43 ft Relief: 3 ft [1] Tides & Solunars |
43 ft | 26° 55' 1" N | 82° 27' 58" W |
County M-13 Site |
Concrete Culverts Third Of 5 Drops 2 Loads 3 Drops This Date Date of Deployment: June 26 1997 Primary Material: CONCRETE CULVERTS Tonnage: 150 County: SARASOTA Depth: 42 ft Relief: 2 ft [1] Tides & Solunars |
42 ft | 26° 55' 7" N | 82° 27' 54" W |
County M-13 Site |
Concrete Culverts Fourth Of 5 Drops 2 Loads 2 Drops This Date Date of Deployment: June 28 1997 Primary Material: CONCRETE CULVERTS Tonnage: 300 County: SARASOTA Depth: 42 ft Relief: 4 ft [1] Tides & Solunars |
42 ft | 26° 55' 8" N | 82° 27' 54" W |
County M-13 Site |
Concrete Culverts First Of 5 Drops 2 Loads 3 Drops This Date Date of Deployment: June 26 1997 Primary Material: CONCRETE CULVERTS Tonnage: 200 County: SARASOTA Depth: 42 ft Relief: 2 ft [1] Tides & Solunars |
42 ft | 26° 55' 8" N | 82° 27' 54" W |
Danger Reef |
On Starboard Side 40’ Long No Superstructure 50% Deteriorated Date of Deployment: December 31 1988 Primary Material: SHIP STEEL CREWBOAT County: CHARLOTTE Depth: 12 ft Relief: 6 ft [1] Tides & Solunars |
12 ft | 26° 45' 33" N | 82° 11' 10" W |
Doc Kline Lincolin Logs |
2 Piles Of Pilings(36 Total) At 30’ X 1’ X 1’ Date of Deployment: September 5 2000 Primary Material: CONCRETE PILINGS County: LEE Depth: 30 ft Relief: 8 ft [1] Tides & Solunars |
30 ft | 26° 20' 21" N | 82° 5' 24" W |
E-F (Jaycees) Reef |
310 Tons Of Concrete Culverts. Date of Deployment: June 30 1992 Primary Material: CONCRETE CULVERTS Tonnage: 310 County: LEE Depth: 31 ft Relief: 8 ft [1] Tides & Solunars |
31 ft | 26° 20' 5" N | 82° 5' 21" W |
E-F (Jaycees) Reef |
225 Tons Of Concrete Culverts. Date of Deployment: June 7 1991 Primary Material: CONCRETE CULVERTS Tonnage: 225 County: LEE Depth: 31 ft Relief: 8 ft [1] Tides & Solunars |
31 ft | 26° 20' 9" N | 82° 5' 21" W |
E-F (Jaycees) Reef |
300 Tons Of Precast Concrete. Date of Deployment: June 30 1993 Primary Material: CONCRETE CULVERTS Tonnage: 300 County: LEE Depth: 31 ft Relief: 8 ft [1] Tides & Solunars |
31 ft | 26° 20' 9" N | 82° 5' 33" W |
Eca Reef |
Concrete Rubble And Steel I Beams ,10000 Funded By Eca Date of Deployment: May 24 2001 Primary Material: CONCRETE RUBBLE (200) Tonnage: 319.1 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Solunars |
24 ft | 26° 18' 22" N | 81° 52' 21" W |
Edison Bridge |
14000 Cubic Yards Of Rubble From Edison Bridge. Date of Deployment: March 1 1993 Primary Material: BRIDGE RUBBLE County: LEE Depth: 40 ft Relief: 15 ft [1] Tides & Solunars |
40 ft | 26° 18' 7" N | 82° 13' 30" W |
Edison Bridge |
Part Of Grant # C-7710 Date of Deployment: March 1 1993 Primary Material: BRIDGE RUBBLE County: LEE Depth: 40 ft [1] Tides & Solunars |
40 ft | 26° 18' 24" N | 82° 13' 28" W |
Edison Reef #1 |
Edison Bridge #1 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 42" N | 82° 13' 24" W |
Edison Reef #2 |
Edison Bridge #2 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 37" N | 82° 13' 19" W |
Edison Reef #3 |
Edison Bridge #3 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 35" N | 82° 13' 8" W |
Edison Reef #4 |
Edison Bridge #4 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 32" N | 82° 13' 15" W |
Edison Reef #5 |
Edison Bridge #5 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 31" N | 82° 12' 59" W |
Edison Reef #6 |
Edison Bridge #6 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 30" N | 82° 13' 32" W |
Edison Reef #7 |
Edison Bridge #7 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 27" N | 82° 12' 22" W |
Edison Reef #8 |
Edison Bridge #8 Sfara 5/98 Date of Deployment: March 1 1993 Primary Material: BRIDGE SPANS CONCRETE County: LEE Depth: 45 ft Relief: 16 ft [1] Tides & Solunars |
45 ft | 26° 18' 24" N | 82° 13' 12" W |
Englewood Fish Haven |
Bridge Rubble Date of Deployment: December 31 1960 Primary Material: BRIDGE RUBBLE County: CHARLOTTE Depth: 22 ft [1] Tides & Solunars |
22 ft | 26° 54' 42" N | 82° 21' 48" W |
Evan Thompson Reef Units |
20’X20’x12’h Lincoln Log Structure 50 Pilings Date of Deployment: May 26 2000 Primary Material: CONCRETE MODULE LINCOLN LOGS Tonnage: 144 County: LEE Depth: 32 ft Relief: 12 ft [1] Tides & Solunars |
32 ft | 26° 20' 17" N | 82° 5' 7" W |
Evan Thompson Reef Units |
20’X20’x12’h Lincoln Log Structure 50 Pilings Date of Deployment: May 25 2000 Primary Material: CONCRETE MODULE LINCOLN LOGS Tonnage: 144 County: LEE Depth: 32 ft Relief: 12 ft [1] Tides & Solunars |
32 ft | 26° 20' 17" N | 82° 5' 7" W |
Evan Thompson Reef Units |
Five 7’ X 7’ Slabs With Two Culverts Each Date of Deployment: May 27 2000 Primary Material: CONCRETE CULVERTS (10) County: LEE Depth: 32 ft Relief: 12 ft [1] Tides & Solunars |
32 ft | 26° 20' 17" N | 82° 5' 7" W |
Ft. Myers Wharf |
4800 Tons Of Concrete Rubble And Rip Rap-Located About 50’ Offshore. Date of Deployment: December 31 1985 Primary Material: CONCRETE RUBBLE Tonnage: 4800 County: LEE [1] Tides & Solunars |
26° 38' 26" N | 81° 52' 29" W | |
G-H Reef |
110’ Steel Barge-35’ Steel Tugboat-Steel Dumpsters. Date of Deployment: August 1 1984 Primary Material: BARGE STEEL County: LEE Depth: 30 ft [1] Tides & Solunars |
30 ft | 26° 20' 35" N | 81° 57' 14" W |
G-H Reef |
Limestone Added To Previous Materials. Date of Deployment: May 7 1994 Primary Material: ROCK LIMESTONE Tonnage: 510 County: LEE Depth: 28 ft Relief: 6 ft [1] Tides & Solunars |
28 ft | 26° 20' 39" N | 81° 57' 31" W |
G-H Reef |
8 Concrete And Screen Juvenile Habitats Large Diameter Vertical Date of Deployment: December 14 1995 Primary Material: CONCRETE CULVERTS County: LEE Depth: 27 ft Relief: 8 ft [1] Tides & Solunars |
27 ft | 26° 20' 40" N | 81° 56' 42" W |
G-H Reef |
Concrete Culverts 4.5 Miles From Big Carlos Pass Date of Deployment: May 24 1995 Primary Material: CONCRETE CULVERTS Tonnage: 450 County: LEE Depth: 28 ft [1] Tides & Solunars |
28 ft | 26° 20' 45" N | 81° 57' 11" W |
Helens Barges |
Two Steel Barges Date of Deployment: June 21 2001 Primary Material: BARGE STEEL (60’) County: LEE Depth: 30 ft Relief: 6 ft [1] Tides & Solunars |
30 ft | 26° 37' 56" N | 82° 17' 10" W |
Helens Reef |
Helens Reef Concrete Poles 12/88Dgps Date of Deployment: December 31 1988 Primary Material: CONCRETE POLES County: LEE Depth: 30 ft Relief: 8 ft [1] Tides & Solunars |
30 ft | 26° 38' 1" N | 82° 17' 5" W |
Lee-Collier |
Lee-Collierbusses10/87Dgps Date of Deployment: October 31 1987 Primary Material: STEEL BUSES County: LEE Depth: 35 ft [1] Tides & Solunars |
35 ft | 26° 17' 26" N | 81° 55' 3" W |
M-14 |
550 Tons Of Concrete Culverts And Concrete Boxes. Date of Deployment: Primary Material: CONCRETE CULVERTS County: SARASOTA Depth: 43 ft Relief: 5 ft [1] Tides & Solunars |
43 ft | 26° 52' 14" N | 82° 26' 26" W |
M-14 |
550 Tons Of Concrete Culverts And Concrete Boxes. Date of Deployment: May 1 1992 Primary Material: CONCRETE CULVERTS Tonnage: 550 County: CHARLOTTE Depth: 45 ft Relief: 8 ft [1] Tides & Solunars |
45 ft | 26° 52' 16" N | 82° 26' 26" W |
M.A.Y. Reef |
May Reef Rubble 11/86Dgps Date of Deployment: November 30 1986 Primary Material: CONCRETE RUBBLE County: LEE Depth: 20 ft [1] Tides & Solunars |
20 ft | 26° 22' 44" N | 81° 55' 23" W |
Mary's Reef |
1 1St Of 3 Loads This Grant All On Same Location Date of Deployment: June 13 2000 Primary Material: CONCRETE CULVERTS Tonnage: 319.1 County: LEE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 46' 14" N | 82° 18' 26" W |
Mary's Reef |
1 1St Of 3 Loads This Grant All On Same Location Date of Deployment: June 16 2000 Primary Material: CONCRETE CULVERTS Tonnage: 319.1 County: LEE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 46' 14" N | 82° 18' 26" W |
Mary's Reef |
1 1St Of 3 Loads This Grant All On Same Location Date of Deployment: June 19 2000 Primary Material: CONCRETE CULVERTS Tonnage: 319.1 County: LEE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 46' 14" N | 82° 18' 26" W |
Mary's Reef |
Mary’s Reef Concrete Culverts 1988 Dgps Date of Deployment: December 31 1988 Primary Material: CONCRETE CULVERTS County: LEE Depth: 30 ft Relief: 6 ft [1] Tides & Solunars |
30 ft | 26° 46' 11" N | 82° 18' 21" W |
Marys Reef Site #3 |
Concrete Culverts Of Various Sizes-Located Date of Deployment: June 13 2000 Primary Material: CONCRETE CULVERTS Tonnage: 319 County: CHARLOTTE Depth: 29 ft Relief: 5 ft [1] Tides & Solunars |
29 ft | 26° 46' 14" N | 82° 18' 26" W |
Marys Reef Site #3 |
Concrete Culverts Of Various Sizes-Located Date of Deployment: June 16 2000 Primary Material: CONCRETE CULVERTS Tonnage: 319 County: CHARLOTTE Depth: 29 ft Relief: 5 ft [1] Tides & Solunars |
29 ft | 26° 46' 14" N | 82° 18' 26" W |
Marys Reef Site #3 |
Concrete Culverts Of Various Sizes-Located Date of Deployment: June 19 2000 Primary Material: CONCRETE CULVERTS Tonnage: 319 County: CHARLOTTE Depth: 29 ft Relief: 5 ft [1] Tides & Solunars |
29 ft | 26° 46' 14" N | 82° 18' 26" W |
May Reef - #1 |
Concrete Pieces (160) In Two Loads At Same Coordinates Date of Deployment: March 23 1999 Primary Material: CONCRETE BOXES County: LEE Depth: 22 ft Relief: 10 ft [1] Tides & Solunars |
22 ft | 26° 22' 23" N | 81° 55' 7" W |
May Reef - #2 |
160 Pieces Concrete In Two Loads Date of Deployment: March 19 1999 Primary Material: CONCRETE BOXES County: LEE Depth: 22 ft Relief: 10 ft [1] Tides & Solunars |
22 ft | 26° 22' 23" N | 81° 55' 7" W |
Novak Reef - Site 1 |
Concrete Bridge Rubble 1 Of 4 Deployments Fdot Funded Date of Deployment: April 14 2003 Primary Material: CONCRETE BRIDGE SECTIONS (18) Tonnage: 360 County: CHARLOTTE Depth: 29 ft Relief: 7 ft [1] Tides & Solunars |
29 ft | 26° 48' 34" N | 82° 19' 42" W |
Novak Reef - Site 2 |
Concrete Bridge Rubble 2 Of 4 Deployments Fdot Funded Date of Deployment: April 16 2003 Primary Material: CONCRETE BRIDGE SECTIONS (24) Tonnage: 464 County: CHARLOTTE Depth: 30 ft Relief: 6 ft [1] Tides & Solunars |
30 ft | 26° 48' 34" N | 82° 19' 42" W |
Novak Reef - Site 3 |
Concrete Bridge Rubble 3 Of 4 Deployments Fdot Funded Date of Deployment: April 18 2003 Primary Material: CONCRETE BRIDGE SECTIONS (22) Tonnage: 464 County: CHARLOTTE Depth: 30 ft Relief: 7 ft [1] Tides & Solunars |
30 ft | 26° 48' 34" N | 82° 19' 42" W |
Novak Reef - Site 4 |
Concrete Bridge Rubble 4 Of 4 Deployments Fdot Funded Date of Deployment: April 21 2003 Primary Material: CONCRETE BRIDGE SECTIONS (24) Tonnage: 480 County: CHARLOTTE Depth: 30 ft Relief: 10 ft [1] Tides & Solunars |
30 ft | 26° 48' 34" N | 82° 19' 42" W |
Novak Reef - Site 4-1 |
Concrete Culverts Of Various Sizes 2 Of 8 Drops This Grant Date of Deployment: July 8 2004 Primary Material: CONCRETE CULVERTS (140) Tonnage: 116 County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 30" N | 82° 19' 32" W |
Novak Reef - Site 4-2 |
Concrete Culverts Of Various Sizes 3 Of 8 Drops This Grant Date of Deployment: July 9 2004 Primary Material: CONCRETE CULVERTS (81) Tonnage: 110 County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 40" N | 82° 19' 37" W |
Novak Reef - Site 4-3 |
Concrete Culverts Of Various Sizes 4 Of 8 Drops This Grant Date of Deployment: July 12 2004 Primary Material: CONCRETE CULVERTS (88) Tonnage: 100 County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 41" N | 82° 19' 36" W |
Novak Reef - Site 4-4 |
Concrete Culverts Of Various Sizes 7 Of 8 Drops This Grant Date of Deployment: July 15 2004 Primary Material: CONCRETE CULVERTS (151) Tonnage: 111 County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 39" N | 82° 19' 32" W |
Novak Reef - Site 4-5 |
Concrete Culverts Of Various Sizes 1 Of 8 Drops This Grant Date of Deployment: July 7 2004 Primary Material: CONCRETE CULVERTS (107) Tonnage: 101 County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 39" N | 82° 19' 32" W |
Novak Reef - Site 4-6 |
Concrete Culverts Of Various Sizes 5 Of 8 Drops This Grant Date of Deployment: July 13 2004 Primary Material: CONCRETE CULVERTS (115) Tonnage: 110 County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 36" N | 82° 19' 39" W |
Novak Reef - Site 4-7 |
Concrete Culverts Of Various Sizes 6 Of 8 Drops This Grant Date of Deployment: July 14 2004 Primary Material: CONCRETE CULVERTS (151) County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 36" N | 82° 19' 39" W |
Novak Reef - Site 4-8 |
Concrete Culverts Of Various Sizes 8 Of 8 Drops This Grant Date of Deployment: July 16 2004 Primary Material: CONCRETE CULVERTS (140) Tonnage: 111 County: CHARLOTTE Depth: 30 ft Relief: 13 ft [1] Tides & Solunars |
30 ft | 26° 48' 39" N | 82° 19' 32" W |
On Shoreline |
Not A Fishing Site-Used To Stabilize Shoreline. Date of Deployment: October 10 1986 Primary Material: ROCK RIP RAP County: LEE [1] Tides & Solunars |
26° 38' 30" N | 81° 52' 30" W | |
Pace #10 |
78 Pieces Of Concrete Culverts About 8’X4’x5’ Date of Deployment: May 5 2006 Primary Material: CONCRETE CULVERTS (78) Tonnage: 320 County: LEE Depth: 35 ft Relief: 8 ft [1] Tides & Solunars |
35 ft | 26° 31' 13" N | 82° 16' 59" W |
Pace #8 |
Limestone Added To Previous Materials 2 To 5 Foot Boulders. Date of Deployment: April 25 2006 Primary Material: ROCK LIMESTONE Tonnage: 444.5 County: LEE Depth: 35 ft Relief: 9 ft [1] Tides & Solunars |
35 ft | 26° 31' 6" N | 82° 16' 54" W |
Pace Rub 1 |
4Th Of 5 Loads This Grant Concrete Culverts And Boxes Date of Deployment: May 21 2001 Primary Material: CONCRETE PRECAST MATERIALS (100) Tonnage: 318 County: LEE Depth: 36 ft Relief: 17 ft [1] Tides & Solunars |
36 ft | 26° 31' 14" N | 82° 17' 4" W |
Pace Rub 2 |
5Th Of 5 Loads This Grant Concrete Culverts And Boxes Date of Deployment: May 29 2001 Primary Material: CONCRETE PRECAST MATERIALS (100) Tonnage: 318 County: LEE Depth: 36 ft Relief: 17 ft [1] Tides & Solunars |
36 ft | 26° 31' 15" N | 82° 16' 56" W |
Pace Tet |
2 Nd Of 5 Loads This Grant 5 To 6 Foot Solid Tetrahedrons Date of Deployment: May 15 2001 Primary Material: MODULES CONCRETE TETRAHEDRONS (150) Tonnage: 212 County: LEE Depth: 36 ft Relief: 14 ft [1] Tides & Solunars |
36 ft | 26° 31' 15" N | 82° 17' 0" W |
Pace's Place #1- Big Rubble |
10 Septic Tanks 8 Manhole Risers And 60 Tons Limestone In An East-Wes Date of Deployment: February 29 2000 Primary Material: CONCRETE PRECAST MATERIALS Tonnage: 180 County: LEE Depth: 36 ft Relief: 10 ft [1] Tides & Solunars |
36 ft | 26° 31' 4" N | 82° 17' 1" W |
Pace's Place Barge Reef |
110’ X 35’ X 9’ Steel Deck Barge And 75’ X 10’ X 8’ Crane/Boom Date of Deployment: June 15 2000 Primary Material: BARGE STEEL DECK County: LEE Depth: 34 ft Relief: 12 ft [1] Tides & Solunars |
34 ft | 26° 31' 10" N | 82° 16' 57" W |
Pace's Place Reef-Juvenile Habitats |
28 Experimental Concrete And Steel Juvenile Fish Habitats Date of Deployment: June 28 2005 Primary Material: CONCRETE JUVENILE FISH REFUGE HABIT Tonnage: 8 County: LEE Depth: 34 ft Relief: 5 ft [1] Tides & Solunars |
34 ft | 26° 31' 10" N | 82° 16' 58" W |
Palm Island Barge Reef |
Steel Barge 70’Lx23’wx8’t And 30 Pieces Of Concrete And 1’ X 40’ Steel Spu Date of Deployment: May 21 1999 Primary Material: BARGE STEEL 70’ Tonnage: 40 County: CHARLOTTE Depth: 56 ft Relief: 8 ft [1] Tides & Solunars |
56 ft | 26° 49' 13" N | 82° 31' 53" W |
Palm Island Ferry Reef |
Steel Car Ferry 60X20x5’ Concrete Boxes And Pilings Also Date of Deployment: March 12 1999 Primary Material: SHIP STEEL FERRY 60’ Tonnage: 35 County: CHARLOTTE Depth: 55 ft Relief: 5 ft [1] Tides & Solunars |
55 ft | 26° 49' 14" N | 82° 31' 57" W |
Pegasus Tugboat |
110’Lx28’wx36’h Steel Tugboat Pegasus Date of Deployment: July 9 1999 Primary Material: SHIP STEEL TUGBOAT (110’) County: LEE Depth: 85 ft Relief: 36 ft [1] Tides & Solunars |
85 ft | 26° 33' 8" N | 82° 43' 25" W |
Power Pole Reef |
Power Pole Barge And Crane8/92Gps Date of Deployment: August 31 1992 Primary Material: BARGE STEEL County: LEE Depth: 45 ft [1] Tides & Solunars |
45 ft | 26° 40' 57" N | 82° 22' 28" W |
Redfish Pass Reef - #1 |
Steel Barge. About 50’X25’x9h Date of Deployment: June 17 1989 Primary Material: BARGE STEEL County: LEE Depth: 24 ft [1] Tides & Solunars |
24 ft | 26° 33' 30" N | 82° 14' 34" W |
Redfish Pass Reef - #2 |
Steel Barge. About 50’X30’x9h Date of Deployment: June 17 1989 Primary Material: BARGE STEEL County: LEE Depth: 26 ft Relief: 10 ft [1] Tides & Solunars |
26 ft | 26° 33' 39" N | 82° 14' 12" W |
Rock Reef - #1 |
About 130 Pieces Of 3 Ft. Limestone Boulders 1 Of 4 Drops This Grant Date of Deployment: June 4 2004 Primary Material: ROCK LIMESTONE (130) Tonnage: 270 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Solunars |
24 ft | 26° 18' 25" N | 81° 52' 27" W |
Rock Reef - #2 |
About 130 Pieces Of 3 Ft. Limestone Boulders 2 Of 4 Drops This Grant Date of Deployment: June 9 2004 Primary Material: ROCK LIMESTONE (130) Tonnage: 270 County: COLLIER Depth: 24 ft Relief: 5 ft [1] Tides & Solunars |
24 ft | 26° 18' 17" N | 81° 52' 23" W |
Rock Reef - #3 |
About 65 Pieces Of 3 Ft. Limestone Boulders 3 Of 4 Drops This Grant Date of Deployment: June 14 2004 Primary Material: ROCK LIMESTONE (65) Tonnage: 135 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Solunars |
24 ft | 26° 18' 27" N | 81° 52' 23" W |
Rock Reef - #4 |
About 65 Pieces Of 3 Ft. Limestone Boulders 4 Of 4 Drops This Grant Date of Deployment: June 14 2004 Primary Material: ROCK LIMESTONE (65) Tonnage: 135 County: COLLIER Depth: 24 ft Relief: 10 ft [1] Tides & Solunars |
24 ft | 26° 18' 20" N | 81° 52' 17" W |
Sanibel Reef |
Sanibel Concrete Rubble 6/88450Yddgps Date of Deployment: June 30 1988 Primary Material: CONCRETE RUBBLE County: LEE Depth: 20 ft [1] Tides & Solunars |
20 ft | 26° 24' 57" N | 82° 3' 10" W |
School Bus Reef - #1 |
Concrete Culverts 2/93Dgps Date of Deployment: February 28 1993 Primary Material: CONCRETE CULVERTS County: LEE Depth: 64 ft [1] Tides & Solunars |
64 ft | 26° 36' 22" N | 82° 28' 13" W |
School Bus Reef - #2 - 1 |
51 Concrete Pilings Stacked 16 Feet Tall Date of Deployment: June 1 1998 Primary Material: CONCRETE MODULE LINCOLN LOGS Tonnage: 142 County: LEE Depth: 68 ft Relief: 16 ft [1] Tides & Solunars |
68 ft | 26° 36' 2" N | 82° 28' 15" W |
School Bus Reef - #2 - 2 |
50 Concrete Pilings Stacked In Square 16 Feet Tall 2Nd Of Two Date of Deployment: June 8 1998 Primary Material: CONCRETE MODULE LINCOLN LOGS Tonnage: 142 County: LEE Depth: 68 ft Relief: 16 ft [1] Tides & Solunars |
68 ft | 26° 35' 58" N | 82° 28' 21" W |
Sherman's Reef Barge |
Sherman’s Barge Dgps Date of Deployment: December 31 1992 Primary Material: BARGE STEEL County: LEE Depth: 60 ft [1] Tides & Solunars |
60 ft | 26° 32' 53" N | 82° 24' 56" W |
Shirley D Shrimp Boat |
48 Foot Long Steel Shrimp Boat Date of Deployment: April 9 1997 Primary Material: SHIP STEEL 48 County: LEE Depth: 60 ft Relief: 6 ft [1] Tides & Solunars |
60 ft | 26° 32' 56" N | 82° 24' 50" W |
South Reef |
Seven Barge Loads Of 1’ To 6’ Limestone Boulders From 8/29/02 Date of Deployment: November 6 2002 Primary Material: ROCK-LIMESTONE BOULDERS Tonnage: 1000 County: LEE Depth: 45 ft Relief: 8 ft [1] Tides & Solunars |
45 ft | 26° 25' 16" N | 82° 19' 2" W |
Stump Pass 3 Mile Reef |
Concrete Culverts- 3 Dates Same Numbers Date of Deployment: May 15 1992 Primary Material: CONCRETE CULVERTS Tonnage: 176 County: CHARLOTTE Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 26° 52' 15" N | 82° 26' 26" W |
Stump Pass 3 Mile Reef |
Concrete Culverts- 3 Dates Same Numbers Date of Deployment: May 19 1992 Primary Material: CONCRETE CULVERTS Tonnage: 196 County: CHARLOTTE Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 26° 52' 15" N | 82° 26' 26" W |
Stump Pass 3 Mile Reef |
Concrete Culverts- 3 Datessame Numbers Date of Deployment: May 21 1992 Primary Material: CONCRETE CULVERTS Tonnage: 175 County: CHARLOTTE Depth: 42 ft Relief: 5 ft [1] Tides & Solunars |
42 ft | 26° 52' 15" N | 82° 26' 26" W |
Tremblay Reef - #1 |
Concrete Bridge Rubble 3 Deployments Same Numbers Also 5/7 And 5/22 Date of Deployment: May 28 2003 Primary Material: CONCRETE BRIDGE RUBBLE (60) County: CHARLOTTE Depth: 41 ft Relief: 11 ft [1] Tides & Solunars |
41 ft | 26° 48' 21" N | 82° 22' 42" W |
Tremblay Reef - Barge |
Steel Deck Barge 90 Ft X 23 Ft X 8 Ft Date of Deployment: January 6 2005 Primary Material: BARGE STEEL 90’ County: CHARLOTTE Depth: 42 ft Relief: 8 ft [1] Tides & Solunars |
42 ft | 26° 48' 25" N | 82° 22' 39" W |
Vixen Wreck |
57 Foot Long X 14 Foot Wide Wood Vessel Called Vixen Date of Deployment: February 1 1997 Primary Material: SHIP WOOD 57’ County: LEE Depth: 60 ft Relief: 20 ft [1] Tides & Solunars |
60 ft | 26° 32' 50" N | 82° 24' 48" W |
Wiggins Pass 3 Mile C And D |
Rubble And Culverts County Funded-,29379.00 Date of Deployment: October 1 2003 Primary Material: CONCRETE RUBBLE (600) Tonnage: 652.8 County: COLLIER Depth: 27 ft Relief: 10 ft [1] Tides & Solunars |
27 ft | 26° 18' 19" N | 81° 52' 26" W |
Wiggins Pass 4.5 Mile Reef |
Steel Barge And Crane Date of Deployment: February 4 1987 Primary Material: BARGE STEEL County: COLLIER Depth: 31 ft Relief: 5 ft [1] Tides & Solunars |
31 ft | 26° 17' 28" N | 81° 55' 10" W |
Wiggins Pass 5 Mile |
School Buses Coke And Other Soft Drink Trucks. Date of Deployment: September 1 1986 Primary Material: STEEL SCHOOL BUSES County: COLLIER Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 26° 17' 28" N | 81° 55' 48" W |
Wiggins Pass 5 Mile |
School Buses Soft Drink Trucks Confirmed By Rbf Grant Fwcc-01002 Date of Deployment: September 1 1986 Primary Material: STEEL SCHOOL BUSES County: COLLIER Depth: 30 ft Relief: 5 ft [1] Tides & Solunars |
30 ft | 26° 17' 29" N | 81° 55' 49" W |
Wildmans Reef |
80 Foot Concrete Sailboat Date of Deployment: October 20 2004 Primary Material: SHIP CONCRETE SAILBOAT 50’ County: LEE Depth: 36 ft Relief: 16 ft [1] Tides & Solunars |
36 ft | 26° 31' 11" N | 82° 17' 3" W |